EQUIPMENT NAME: CFR RON ENGINE OCTANE NUMBER OF PETROLEUM TO DETERMINE RESEARCH PURPOSE PRODUCTS WAUKESHA MOTOR COMPANY, WAUKESHA, WISCONSIN, USA MAKE INDIAN AGENT: LABCON DATE OF INSTALLATION STANDARD OPERATING PROCEDURE TECHNICAL DATA START UP PROCEDURE: 1. Standard: ASTM D2699, IP 237 level IS 1448 P.27 Check the coolant & the crankcase oil controller 2. Engine Speed: in 6006 Turn on the oil heater, temperature &wait for attaining required temperature rpm 3. Turn on cooling water 3. Crankcase oil: SAE 3 0 CR Adjust the cylinder height to low enough 4. Crankcase oil 135 15 Start the engine to required oil pressure temp: in °F 6 Switch on the ignition switch 5. Oil pressure: in psi 25 to 30 7. Select fuel selector valve 8. Switch on the intake air heater, temperature 6. Intake air temp: Depending upon prevailing barometric controller & detonation meter power
pressure Let the temperature come to equilibrium
910. Switch to PRF blend of appropriate O.N. 7. Coolant temp: in °F 2123 8. Spark plug gap: 0 020t 0.005 SHUT DOWN PROCEDURE: in inch Turn off the ignition switch 13 1. 9. Spark advance: 2. Position the stop/run/start switch to STOP in btdc 3. Drain all fuel from the engine carburetor 10. Fuel air ratio: Adjust for maximum Rotate the crankshaft to position it at tdc knock Turn off the cooling water 6 Switch off the main power supply Safety Precautions: Proper PPE like apron, ear plug, etc should be usedduring testing FLOWDIAGRAM OF ANALYSIS Switch on the ignition Check the Turn on oil Turn on cooling heater & temp. water & start the switch, intake air heater, coolant & the detonation meter power oil level controller JL engine
Turn off Test with
Turn off cooling Drain off all fuel ignition switch PRF blend of water & main & position the & stop the appropriate crankshaft at tde O.N. power supply engine
Preparedby Checked by Approved &Issued by
AM(QC) Dr.RC Sahu, AM(Lab) Dr. A Mishra, SQCM Name &Designation L PC Sarma, Signature CONTROLLED COPY