RON Make: Document No. BGR/LAB/SOP-20

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Maintenance & In-house Checking of

SOP For Operation,


CFR RON Eng1ne Rev. No. 00
Document No. BGR/LAB/SOP-20 lssue No. 02
IndianOil
Page 1 of 2 Copy No. Date: 06.04.2020 Dato:

INSTRUMENT NO. QCICFR/RON/28


EQUIPMENT NAME: CFR RON ENGINE OCTANE NUMBER OF PETROLEUM
TO DETERMINE RESEARCH
PURPOSE
PRODUCTS
WAUKESHA MOTOR COMPANY, WAUKESHA, WISCONSIN, USA
MAKE INDIAN AGENT: LABCON
DATE OF
INSTALLATION STANDARD OPERATING PROCEDURE
TECHNICAL DATA START UP PROCEDURE:
1. Standard: ASTM D2699, IP 237
level
IS 1448 P.27 Check the coolant & the crankcase oil
controller
2. Engine Speed: in 6006 Turn on the oil heater, temperature
&wait for attaining required temperature
rpm 3. Turn on cooling water
3. Crankcase oil: SAE 3 0 CR
Adjust the cylinder height to low enough
4. Crankcase oil 135 15 Start the engine to required oil pressure
temp: in °F 6 Switch on the ignition switch
5. Oil pressure: in psi 25 to 30 7. Select fuel selector valve
8. Switch on the intake air heater, temperature
6. Intake air temp: Depending upon
prevailing barometric controller & detonation meter power

pressure Let the temperature come to equilibrium


910. Switch to PRF blend of appropriate O.N.
7. Coolant temp: in °F 2123
8. Spark plug gap: 0 020t 0.005 SHUT DOWN PROCEDURE:
in inch Turn off the ignition switch
13
1.
9. Spark advance: 2. Position the stop/run/start switch to STOP
in btdc 3. Drain all fuel from the engine carburetor
10. Fuel air ratio: Adjust for maximum Rotate the crankshaft to position it at tdc
knock Turn off the cooling water
6 Switch off the main power supply
Safety Precautions:
Proper PPE like apron, ear plug, etc should be
usedduring testing
FLOWDIAGRAM OF ANALYSIS
Switch on the ignition
Check the Turn on oil Turn on cooling
heater & temp. water & start the switch, intake air heater,
coolant & the
detonation meter power
oil level controller
JL engine

Turn off Test with


Turn off cooling Drain off all fuel ignition switch PRF blend of
water & main & position the & stop the appropriate
crankshaft at tde O.N.
power supply engine

Preparedby Checked by Approved &Issued by


AM(QC) Dr.RC Sahu, AM(Lab) Dr. A Mishra, SQCM
Name &Designation L PC Sarma,
Signature
CONTROLLED COPY

6 SWITCH OFFTHE MAIN POWER SUPPLY

You might also like