Estimating number & techno-managerial staff required; based on particular type


and size of the project.
 
Consider you are the owner of any one of the following construction firm
1. Residential project (Size G+5 storey building) 
2. Road construction Length of 50 Km road of National Highway category)
3. Tunnel Construction (Western ghat region with a length of 2 Km for
purpose of road transport)
4.Bridge Construction ( Cable-stayed bridge pf length 800 m)
 
estimate the number of techno-managerial staff required for your project.
Also, specify these number step by step management level. You can take
reference to the following diagram. please upload a word file for the same.

Answer: -
Residential Project (Size G+5 Storey Building)
Owner