Is There A Need For A Single-Position Test Set in The Lab?
Is There A Need For A Single-Position Test Set in The Lab?
SINGLE-POSITION TEST
SET IN THE LAB?
Just a few years ago, the utility companies have their own verification labs for
the calibration of electricity meters. This used to be standard practice.
Experienced personnel at this laboratory had been completing complicated
tasks connected with the testing and calibration of meters for decades.
Because of their expertise these specialists also took responsibility for the
By Detlef Ebel, Marketing installation and servicing of meters in the network. All utility companies are
Manager, MTE Meter Test experiencing rising costs due to liberalization of the supply of energy. This
Equipment AG
means that ways of reducing expenses have to be considered.
Test laboratories are a major target for cost measurement set consisting of active power
reduction. Small utility companies with a and reactive power meters including time
relatively low number of meters to service switch. It is necessary to have accurate
can find many reasons to close their own knowledge as well as experience to program
verification labs. On the one hand, sufficient a multi-functional meter to be sure of receiving
investment has been made in the the required information as the various energy
laboratories of some larger utilities to give and maximum demand tariffs have to be
them high productivity potential enabling adjusted and released in the desired
them to take over the tasks of others. configuration. The personnel installing the
Alternatively, there are independent meter at the consumer’s site must also
laboratories, which offer an overall service. connect it correctly. Manufactures use
Additionally international standards, such as different procedures to represent data on the
the metrological guidelines of the European display and position of the connections for
Union, allow the first verification of new input and output signals. The potential for
meters by the manufacturer. There is, making mistakes is quite high and can lead to
therefore, no need to calibrate new meters significant errors in billing.
before installing them in a different
European country. A SUGGESTED SOLUTION
THE SITUATION OF SOME UTILITY Some utilities have decided to equip the
COMPANIES department responsible for metering
services with small test systems to
ABOUT THE AUTHOR Countries in the European Union have been overcome the problems described above.
Detlef Ebel is Marketing experiencing a continuous reduction of
Manager at the Swiss A modern multifunctional meter can be
verification labs over several years. At the
company MTE Meter Test
same time the number of specialists in the connected to this system and can be
Equipment AG, a position completely checked. Such a system is
he has held since 1996. He area of electricity metering is rapidly
is a member of the decreasing. Specialists with in-depth intended to acquaint staff with new
Metering International knowledge of modern electronic meters are models and scrutinize the precise
Global Advisory Panel.
He gradduated with the
rare in some utilities. As a result, such configuration of a specific meter before it
degree of diploma engineer utilities are not able to fully utilise the is installed.
from Polytechnical advantages of electronic tariff meters. Their
University of Leningrad in billing departments are not advised by Such a system in Figure 1. It consists of a
1971. He worked as a
meter service pant of the
technicians about the functions of installed three-phase current and voltage source
Regional Energy Supply meters and the functions with which new (phantom load) and a class 0.05 three-phase
Utility Potsdam. In 1990 he meters should be equipped. electronic reference standard integrated in the
obtained aDEng at the same cabinet. The main features are the
Technical University
As an example a four-quadrant meter with extensive measuring ranges, high accuracy,
Dresden with a dissertation
on meter testing. From integrated load profile, internally controlled and very low susceptibility to disturbance by
1991 to 1995 he was by a real time clock is able to give quite external influences.
employed as head of easily the same information which, in the This instrument, the PTS 3.3, fulfils all
foreign sales at EMH
past, was only available with a great deal of requirements for control of the meter
Energie-Messtechnick
GmbH in Brackel Germany. effort. It would have required a complete installation as well as analysis of the load
parameters at the network point.
Its advantages are: The software package, CAMCAL for
• Easy verification of WINDOWS, is installed on the control PC of
meters under precise this single-position test system enabling
load conditions, using automatic test of complex meters. It also
the built-in, compact, allows the reading out of various tariff registers
current and voltage of the meter under test and evaluation of their
source content.
• Automatic operation
using predefined load FURTHER APPLICATIONS
points without the
need for an external The single-position system described above
PC can also be used in accredited laboratories.
• Internal memory for The ranges of current, voltage, phase
storage of displacement and frequency allow generation
Figure 1. PTS 3.3 portable test system
measurement results of all values prescribed by international rules
and customer data for the verification of meters. The accuracy of
• Displays of vector diagram and phase the integrated reference standard, 0.05 %, is
sequence for analysis of supply sufficient for verification of meters up to class
conditions 0.2S.
• User-friendly system for data input and
operation of source and reference meter
• The system may be used either as a