Professional Documents
Culture Documents
SBRF - Rec 1b - Rec 1d Rwy 18 36 - Sid - 20200813
SBRF - Rec 1b - Rec 1d Rwy 18 36 - Sid - 20200813
INSTRUMENT(SID)
RWY 18/36
AD ELEV: 33’ REC 1B - REC 1D
TWR RECIFE APP RECIFE ACC RECIFE
TA 4000’ 118.35 125.25 119.50 119.95 120.40 128.05 133.65 134.50
122.80 (MIL) 121.50 129.60 121.50 135.80 121.50
35 30 35 00
ETAPI
NOTES
00’ D40.7 REC
16
DME REQ. SBR 221
FL090
ANGIN
3
2000’
3000’
D40.1 REC 4 1
2
REC
NM
25
T
33 AN 1000’
R
600’
N
40 4 G
3
S
.1I N
E 2
340.7
T
A
DREC1D
4
SI
P
I
TR 626’
NS 10NM
08
UK
3 MA
00
13 T 08
40 2500’ 467’ 00
.
9
N
4
1060’
1
004
190’
» ¿V
467’ 55’
AR 2
00
’ BRG: MAG 116.90 REC 203’
16 VA/CHG: 06’E R E C
136’ 184
W -
3
2600’
2690’
3 P
2500’
KU SDRE
I C1B
2 0’S TO
60 0
N
4 TR 26.0
08 40
30
40 39 UT
30
2 IM
S
S
.9
N
TR
SBP 268
1500’ AGL
SBP 209
1600’ GND
2549’ 1500’ AGL
08 TOKUP GND
30 08
D40.0 REC 0’ 30
60
0 0
4 1
8
1 SCALE
CHANGES:NEW CHART.
2 0 10 NM
600’
SIMUT 2 0 10 20 Km
D40.9 REC
35 30 35 00
AIRAC AMDT 2009A1 13 AUG 20 DEPARTAMENTO DE CONTROLE DO ESPA˙O AREO SBRF_SID_01D 1/2
SID REC 1B - REC 1D RWY 18/36
STANDARD DEPARTURE CHART RECIFE / Guararapes - Gilberto Freyre, INTL (SBRF)
INSTRUMENT(SID) RWY 18/36
REC 1B - REC 1D
RMK
1 - Procedimento de atenuaªo de rudo:
Entre 0100-0900 UTC, executar o PROC de atenuaªo especfico do EQPT ou manter V2+10KT atØ
900FT aps entre V2+10KT e V2+20KT atØ 3100FT.
Noise abatement procedure:
BTN 0100 - 0900 UTC, execute specific noise abatement procedure of EQPT or maintain V2+10KT
up to 900FT after BTN V2+10KT and V2+20KT up to 3100FT.
After take-off, mantain heading 184 until 2500’, then turn LEFT, overheading REC VOR at or above
FL080 and intercept TRNS ETAPI or TRNS ANGIN or TRNS UKMAT.
4 - TWR D-CL (DATA LINK CLRD) AUTH TFC DATA LINK ACT H24.
CHANGES:NEW CHART.
AIRAC AMDT 2009A1 13 AUG 20 DEPARTAMENTO DE CONTROLE DO ESPA˙O AREO SBRF_SID_01D 2/2
SID REC 1B - REC 1D RWY 18/36