Dhenkanal Parliamentary Constituency

DHENKANAL
RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT)
DHENKANAL PARLIAMENTARY CONSTITUENCY
A. ASSEMBLY SEGMENTS : Dhenkanal, Kamakyanagar, Hindol, Parjanga, Angul, Talcher, Pallahara.
RAILWAY STATIONS COVERED : Handapa, Boinda, Jarapada, Kerejanga, Angul, Talcher Road, Talcher,
Burhapanka, Meramandali, Nayabhagirathipur, Hindol Road, Mahadia PH, Sadasibapur, Dandimal, Dhenkanal,
Shyamacharanpur Halt, Joranda Road.
B. WORKS COMPLETED IN LAST FIVE YEARS :
B.1. Improvement of Passenger Amenities :
 Development of Circulating area at Angul,
Dhenkanal, Talcher and Talcher Road at a cost of
` 2.0 Crore.
 Signages provided at Angul, Dhenkanal and Talcher
Stations at a cost of ` 0.057 Crore.
 Additional Ticket Window for booking facility provided
at Angul, Talcher and Talcher Road Stations at a cost
of `0.120 Crore.
 Waiting Halls Provided at Angul, Talcher, Dhenkanal
and Talcher Road Stations at a cost of `0.970 Crore.
 Provision of 4 bay Platform Shelter on Platform No.1 Talcher Station Building
and 6 bays on Platform No.2 at Dhenkanal Station at
a cost of ` 0.910 Crore.
 04 Nos. of Toilets provided at Angul,
Talcher, Dhenkanal and Talcher Road
Stations at a cost of ` 0.230 Crore.
 03 Nos. of Foot Over Bridges provided at
Meramandali, Talcher Road and Budhapanka
Stations at a cost of ` 8.0 Crore.
 Water Coolers have been provided at 24
Hon’ble Union Minister Shri Dharmendra Pradhan & important stations over Khurda Road Division. It
Hon’ble Union Minister Shri Manoj Sinha dedicating is a combined work for 10 constituencies at a
Passenger Amenities Works at Talcher Railway Station cost of ` 1.390 Crore.
 01 additional Platform at Talcher Road Station at a
cost of ` 1.820 Crore.
 Widening of existing road at a cost of ` 30 Lakh,
Development of Parking Area at a cost of ` 30 Lakh,
Thematic Painting of Walls for Station Beautication
at a cost of ` 3 Lakh, Provision of Welcome & Thank
You Gate at a cost of ` 4 Lakh, Miscellaneous Works
at a cost of ` 33 Lakh.
B.2. Additional Stoppage : Improved Parking Area of Talcher Railway Station
 20817/20818 Bhubaneswar-New Delhi -
Bhubaneswar Rajdhani Express via Angul, Sambalpur City has been given additional Stoppage at
Dhenkanal Station.
B.3. Trafc Facilities :
 Commissioning of Banker Siding at Dhenkanal.
Commissioning of Auto Signalling along with 3rd line
b e t w e e n Ta l c h e r t o Ta l c h e r S o u t h B a l a n d a .
Commissioning of Long Haul loop at Hindol Road at a
cost of ` 16.910 Crore.
 1 No. of Road Over Bridge (ROB) at Level Crossing No.
CT 39 at a cost of ` 12.700 Crore.
 8 Nos. of Road Under Bridges (RUB) at Level Crossing
No. CT 30, CT 37, CT 50, CT 53, CT 58, CT 59, CT
80,ST 104 at a cost of ` 20.0 Crore.
Angul Station Building  Road Over Bridge between Dhenkanal &
Kamakhyanagar Opened for Public Use.
RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT)
DHENKANAL PARLIAMENTARY CONSTITUENCY
B.4. Additional Facilities :
 At Angul Electric Loco Shed augmentation of holding capacity from 100 AC locos to 150 AC locos completed at a cost of
` 22.140 Crore.
 Angul Electric Loco Shed augmentation Holding capacity from 150AC locos to 200 AC locos completed at a cost of `
39.820 Crore.
 Shifting of Neutral sections and provision of feeder wire between Joranda Road to Dhenkanal and Joranda Road to Raj Athgarh
section at a cost of ` 0.690 Crore.
 All Unmanned Level Crossings have been eliminated.
C. ON-GOING WORKS :
C.1. Passenger Amenities :
 Augmentation of water supply for train and coach watering at
Talcher Station at a cost of ` 1.980 Crore.
 Provision of Deep tube well, pump house and PVC tank
at 32 stations over Khurda Road Division. It is a
combined work for 10 MP constituencies at a cost of `
1.890 Crore.
 Provision of Latrines and Urinals at 32 stations over
Khurda Road Division. It is a combined work for 10 MP
constituencies at a cost of ` 1.280 Crore.
 Provision of Public Address system at 25 stations . It is a
combined work for 10 MP constituencies at a cost of
`1.790 Crore.
 Provision of First Foot Over Bridge at Mahadia PH,
Sadasibpur PH & Talcher Thermal PH Waiting Hall at Dhenkanal Railway Station
 Provision of Concrete Platform Surface at Dhenkanal,
Talcher, Angul
 Replacement of Old asbestos sheet with green galvanized sheets at Angul, Meramundali
C.2. Trafc Facilities :
 Yard remodelling of loop lines at Hindol Road, Sadasibapur, Joranda Road, Raj Athgarh, Byree, Dhanmandal, Baitarani
Road and Kenduapada. It is a combined work at a cost of ` 14.190 Crore.
 7 Limited Height Subways in lieu of Unmanned Level Crossing gates over Khurda Road Division. It is a combined work
for 04 constituencies at the cost of ` 17.720 Crore.
 9 Limited Height Subways in lieu of 11 manned Level Crossing gates over Khurda Road Division. It is a combined work
for 7 MP constituencies at a cost of ` 21.460 Crore.
 Increase CSL (Length of lines) at 20 stations in Khurda Road Division without shifting of points and Crossings. It is a
combined work for 10MP constituencies at a cost of ` 0.950 Crore.
C.3. Additional Facilities :
 Provision for approach warning system and voice logger at 25 level crossings over Khurda Road Division. It is a
combined work for 10 MP constituencies at a cost of ` 4.060 Crore.
 Replacement of Level crossings gates by electrically operated lifting barrier over Khurda Road Division. It is a combined
work for 10 MP constituencies at a cost of ` 3.750 Crore.
 Integrated power supply at mid section interlocked level crossing gates. It is a combined work for 10 MP constituencies
at a cost of ` 6.150 Crore.
 Interlocking 10 nos. of manned LC gates over Khurda Road Division. It is a combined work for 5 MP constituencies at a
cost of ` 8.650 Crore.
 Provision of 6 quad cable and accessories over Khurda Road Division. It is a combined work for 11 MP constituencies at
a cost of ` 10.790 Crore.
 Replacement of old point machines at various station
yards over Khurda Road Division. It is a combined work
for 11 MP constituencies at a cost of ` 2.800 Crore.
 Replacement of worn out point machines at different
stations over Khurda Road Division. It is a combined work
for 11 MP constituencies at a cost of ` 0.840 Crore.
 Provision for earthing improvement by maintenance free
earth for signalling and telecom installations over Khurda
Road Division. It is a combined work for 11 MP
constituencies at a cost of ` 0.960 Crore.
 Construction of 102 Quarters at Talcher at a cost of `
13.340 Crore.
 Construction of 05 unit quarters in replacement of existing old
quarters at Talcher Station at a cost of ` 0.380 Crore.
 Construction of 12 nos. of quarters for running staff at
Talcher Station at a cost of ` 0.870 Crore. Digital Transaction at Angul Railway Station
 Water treatment plant for potable water at Railway colony
at Talcher Station at a cost of ` 2.870 Crore.
 Construction of Crew Booking ofce cum lobby and 20 bedded running room at Talcher at a cost of ` 1.890 Crore.
 Replacement of old SCADA system by latest SCADA system as per latest RDSO specication over Khurda Road
Division. It is combined work for 11 MP constituencies at a cost of ` 7.570 Crore.