S.I.

-07
Price : Rs. 2/-
KHADI & VILLAGE INDUSTRIES COMMISSION
PROJECT PROFILE FOR GRAMODYOG ROJGAR YOJANA

BARBER SHOP

Hair cutting and hair dressing is an essential service for men as well women. Looking
to the need of the barbars, the scheme has been introduced to attractive saloons. Even
educated unemployed youths are coming forward to start such units in the rural areas for
earning. Such unit can provide employment to 4 persons.

1 Name of the Service : Hair Cutting / Shaving

2 Project Cost :
a Capital Expenditure
Land : Own
Building Shed 250 Sq.ft : Rs. 50000.00
Equipment : Rs. 30000.00
(Hair cutting Chairs, Mirrors, Scissors,
cosmatics etc..)

Total Capital Expenditure Rs. 80000.00

b Working Capital Rs. 13000.00

TOTAL PROJECT COST : Rs. 93000.00

3 Estimated Annual Service : (Value in ‘000)


Sr.No. Particulars Capacity Rate Total Value
1 Hair cutting, Shaving etc.. Hair Cutting 15.00 83.70
Shaving 10.00
TOTAL 83.70

4 Raw Material : Rs. 5000.00

5 Lables and Packing Material : Rs. 0.00

6 Wages (Skilled & Unskilled) : Rs. 60000.00

(191)
7 Salaries : Rs. 0.00

8 Administrative Expenses : Rs. 0.00

9 Overheads : Rs. 5000.00

10 Miscellaneous Expenses : Rs. 500.00

11 Depreciation : Rs. 5500.00

12 Insurance : Rs. 800.00

13 Interest (As per the PLR)


a. C.E.Loan : Rs. 10400.00
b. W.C.Loan : Rs. 1690.00

Total Interest Rs. 12090.00

14 Woring Capital Requirement :


Fixed Cost Rs. 11700.00
Variable Cost Rs. 71690.00
Requirement of WC per Cycle Rs. 13898.00

15 Estimated Cost Analysis


Sr.No. Particulars Capacity Utilization(Rs in ‘000)
100% 60% 70% 80%
1 Fixed Cost 11.70 7.02 8.19 9.36
2 Variable Cost 72.00 43.20 50.40 57.60
3 Cost of Production 83.70 50.22 58.59 66.96
4 Projected Sales 100.00 60.00 70.00 80.00
5 Gross Surplus 16.30 9.78 11.41 13.04
6 Expected Net Surplus 11.00 4.00 6.00 8.00

Note : 1. All figures mentioned above are only indicative and may vary from place to place.
2. If the investment on Building is replaced by Rental then
a. Total Cost of Project will be reduced.
b. Profitability will be increased.
c. Interest on C.E.will be reduced.