Modara Ananda - Repair of Old Science Lab To A Principal Quarters. - 2015
Modara Ananda - Repair of Old Science Lab To A Principal Quarters. - 2015
Address:………………………… …………………………………………..
Divisional Engineer
Date:…………………………..
BILL OF QUANTITIES
Quarters Repair
2 Removing and stacking calicut ridge tile.
L.ft 46.00 40.00 1,840.00
Page 1
Item Description Unit Qty. Rate Amount
10 Supplying and fixing 45mm x 22mm local
micro (Eucalyptus Microcoris)or Balau,
Kempas or Bitis timber reepers including
application of wood preservative. L.ft. 500.00 55.00 27,500.00
Page 2
Item Description Unit Qty. Rate Amount
24 Supply and fixing 1'-0" x 1'-0" cement grill
on wall. Sq.ft. 4.00 157.00 628.00
Page 3
Item Description Unit Qty. Rate Amount
35 Glazed ceramic wall tiling of size 8" x 12"
approved colour, supplying and fixing to
walls on a 1:3 cement sand mortar layer,
and pointed with tile grout to match the
tile. (Rate does not include the 1:3 Sqr. 1.20 29,055.00 34,866.00
cement sand mortar layer and is
separately measur
Page 4
Item Description Unit Qty. Rate Amount
48 Light point wired through a 5Amp one
gang one way plate switch using
2x1/1.13mm(2x1/044) P.V.C. insulated
copper wire in fully concealed/surface Per Point 1.00 1,700.00 1,700.00
P.V.C. conduits.
Page 5
Item Description Unit Qty. Rate Amount
56 Ceiling fan 56" Sweep (USHA - Atom ) or
approved equivalent brand and model Nr. 3.00 6,075.00 18,225.00
No.
Page 6
Item Description Unit Qty. Rate Amount
67 Supply and fixing Plastic 1/2" stop tap of
"S-lon" brand or approved equivalent. Nr. 1.00 2,440.00 2,440.00
Prepared By : Checked By :
Name : Name :
Designation: Designation:
Date : Date :
Total
Page 7
Item Description Unit Qty. Rate Amount
Vat No.
Total amount in word Rupees:…………………………………………………………
……………………………………………………………………………………………..
Signature of Contractor
Date:
Witness (1)
Witness (2)
Page 8
13.57
1,380.00
140.00
150.00
3.15
194.00
Page 9
13.57
185,437.00
2.51
0.65
1.30
0.16
1.30
0.65
4.26
Page 10
36.00
20.00
0.09
0.37
8.52
102.00
Page 11
63.00
1.42
8.52
19.82
12.96
Page 12
Page 13
639,822.75
Page 14
68,175.00
Page 15
Total Cost Estimate (TCE) for a work contract
Estimate for Repair of Teacher's Quarters at Modara Ananda Vidyalaya
7 (G) Provision for the payment for water supply connection to NWS & DB
including VAT 15%
8 (H) Provision for physical contingencies 10% of (D.C.C.) 2,959.43
9 (I) Provision for price escallation 1.5% to 10% of (D.C.C.)
10 (J) VAT 11% (A) + (I) + (H) 98,805.82
Total Cost Estimate 1,000,000.00
(A+B+C+D+E+F+G+H+I+J)
I certify the rates adopted in pricing the BOQ are fair and reasonable and the Quantities are in commensurate with the Drawings.
This estimate covers all the expenses of labour Size of the building:
material, tools,transport and overheads etc. for Floor area :
Number of floors:
Ananda college Proposed Water supply system
Drawing Number.
including water supply, electricity and other internal and BOQ Number :
external services.
Checked by :
(special grade) ………………………………………..
(Name and Designation) Name :
Divisional Engineer
…………………………………………
Approved
E/TTC
of the building:
ber of floors:
wing Number.
Sub Total
…………………………………..
ional Engineer