St. Mathews College - Three Storied Building Repair
St. Mathews College - Three Storied Building Repair
Address:………………………… …………………………………………..
Divisional Engineer
Date:…………………………..
BILL OF QUANTITIES
Prepared By : Checked By :
Name : Name :
Designation: Designation:
Date : Date :
Total
Vat No.
Signature of Contractor
Date:
Witness (1)
Witness (2)
2,570.00
3,200.00 220.00
6,000.00
3,600.00
500.00
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Estimate for 70' x 26' Three Storied Building Repair at St. Mathew's College.
This estimate provides for the draw No: ....................................... and as per BOQ No. ...................
expenses necessary to 1 (A)
Estimate for 70' x 26' Three The increase in cost between the date of preparation of estimate and date
Storied Building Repair at St. of preparation of rates applied to the engineer's estimate.
Mathew's College draw
No : ............................. ........... Direct Construction Cost (DCC) = #N/A
...................................
Procurement preparedness activities
2 (B) Preparation of contour, Local authority approval 1% of DCC;
3 (C) Design documentation
If A › Rs. 300m 2.5% DCC
If 300m › A › Rs. 100m 3.0% DCC
If 100m › A 3.5% DCC
Post Contract - award activities
4 (D) Cost of resident supervision 1.5%
Administrative cost (Travelling, stationery, photocopy charges.) 0.5 - 1%
5 (E) DCC 3%
6 (F) Departmental Charges
7 (G) Provision for the payment for water supply connection to NWS & DB
including VAT 15%
8 (H) Provision for physical contingencies 10% of (D.C.C.) #N/A
9 (I) Provision for price escallation 1.5% to 10% of (D.C.C.)
10 (J) VAT 11% (A) + (I) + (H) -
Total Cost Estimate
(A+B+C+D+E+F+G+H+I+J)
I certify the rates adopted in pricing the BOQ are fair and reasonable and the Quantities are in commensurate with the Drawings.
This estimate covers all the expenses of labour Size of the building:
material, tools,transport and overheads etc. for Floor area :
Number of floors:
Ananda college Proposed Water supply system
Drawing Number.
including water supply, electricity and other internal and BOQ Number :
external services.
Checked by :
(special grade) ………………………………………..
(Name and Designation) Name :
Divisional Engineer
…………………………………………
Approved
E/TTC
of the building:
ber of floors:
wing Number.
Sub Total
…………………………………..
ional Engineer