EM238-TC-5201 0

PROJECTS & DEVELOPMENT INDIA LTD DOCUMENT NO REV


SHEET 1 OF 9

TITTLE : TECHNICAL CONDITIONS FOR FANS & BLOWER

DOC NO. : EM238-TC-5201

CLIENT : M/S IOCL

PROJECT : CATALYST MANUFACTURING UNIT, PRPC

JOB NO. : EM-238

LOCATION : PANIPAT

1 16.07.19 16.07.19 ISSUED FOR ENQUIRY BB AIN GC


REV REV DATE EFF DATE PURPOSE PREPD REVWD APPD
FORM NO: 02-0000-0021F1 REV4 All rights reserved
TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 2 OF 10

CONTENTS

SECTIONS NO. DESCRIPTION PAGE NO.


1. GENERAL 3
2. BASIC DESIGN 3
3. ACCESSORIES 3
4. INSPECTION, TESTING 4
5. VENDORS DATA 4
6. PERFORMANCE GUARANTEE 5
7. ACCEPTANCE TEST 5
8. PAINTING 5
APPENDIX - I
9. 6
(DRAWINGS & DOCUMENTS SCHEDULE)

10. VENDOR LIST 8


CHECK LIST (TECHNICAL)
11. 9
To be submitted along with bid

NOTES:

This document shall be used with relevant information contained in the documents
listed below (in order of priority).

1. Letter for invitation of bid or succeeding official confirmed order.

2. Specification sheet of particular Fans & Blowers for the project, in question.

3. This document.

4. Codes and standards referred in the above mentioned documents and in the
document.

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 3 OF 10

1.0 GENERAL

1.1 This standard together with relevant specification sheets covers the minimum
engineering requirements for supply of Fans & Blowers.

1.3 Deviation and / or exceptions to the enquiry specification sheet, enclosures,


applicable standards etc. must be listed for each document clause wise with proper
reason in a separate Appendix in the bid. Otherwise it shall be assumed that all the
requirements of the enquiry are acceptable without any reservation and shall be
binding to the bidder.

1.4. Complete coordination between the Fan / Blower and driver will be the responsibility
of the vendor of the driven machine in case driver is included in vendor's scope of
supply.

1.5 Fan / Blower shall have SI dimensions and comply with applicable ISO standards
except for piping connections which shall be as per ANSI standards.

1.6 Fan / Blower vendor shall be fully responsible for the design, engineering,
manufacture, inspection, testing, delivery, supervision of erection and commissioning
as per the requirements of the purchase order.

2.0 BASIC DESIGN:

2.1. The arrangement of Fan/Blower, driver and the auxiliaries shall be mutually agreed
between the vendor and the purchaser.

2.2 Shaft seals shall be accessible for maintenance without dismantling ducts or fan
casing.

2.3 Forced and induced draught fans shall be directly coupled to drivers through flexible
coupling, and the complete assembly shall be mounted on a substantial bedplate.
Belt pulley arrangement shall not be used.

2.4 First critical speed of the rotor shall be higher than 120% of rated speed. Rotor
assembly shall be dynamically balanced.

2.5 Capacity control shall be achieved by means of dampers (Preferably on suction side)
especially for constant speed fans.

2.6 SS bolts and nuts shall be provided for the split casing joints of fans for corrosive
service.

2.7 The drive motors of the fans should be designed with additional capacity to take care
of surge loading. However Motor rating shall be minimum 125 % of shaft power for
shaft power up to 22 KW, 115 % of shaft power for shaft power between 22 – 55 KW
and 110 % of shaft power for shaft power above 55 KW.

3.0 ACCESSORIES:

3.1 The inlet guide vane, if specified, shall be provided with the following:

i) An external guide vane position indicator

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 4 OF 10

ii) Spindles shall be supported at both ends

iii) Manual operation of the guide vane from grade level shall be possible

iv) The guide vane ring shall be protected by a dust cover which shall allow full
access to all parts for inspection

v) Dampers shall be louvre type with opposed blade.

4.0 INSPECTION, TESTING AND PREPARATION FOR SHIPPING

4.1 The Fans & Blowers shall be subjected to stage inspection by PDIL Inspector /
Inspector of Purchaser or authorised Inspecting agents as defined in the purchase
order. Test and Inspection Plan shall be submitted to the Inspector for approval.

4.2 Test and Inspection shall be carried out as per national / international codes &
standards.

4.5 Acceptance of shop tests does not relieve the vendor of his responsibility in any way.

4.7 Vendor / Manufacturer shall compile all the tests and inspection reports relevant to
Purchase order scope of supply in folders. Following reports must be included.

a) Material certificates

b) Results of non - destructive inspection

c) Records of dimensions

d) Results of hydrostatic test

e) Records of mechanical running test

f) Results of dismantling inspection

g) Performance test report

h) Report of other specified tests

I) Inspection reports of all other auxiliaries.

5.0 VENDOR’S DATA

5.1 The bidder shall furnish along with offer an installation list of similar Fans & Blowers
supplied. The installation list shall include the following:

a) Client, location and year of installation


b) Driven Equipment
c) Model No. and type of Fans & Blowers
d) Steam Parameters.
e) Speed and KW rating.

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 5 OF 10

5.2. Number of vendor’s personnel required and the estimated period for erection and
commissioning supervision, their per diem rates and other terms and conditions
should be mentioned in the offer.

5.3. Drawings:

a) The vendor shall furnish all the documentation in required number of copies
and within the time schedule as specified in Appendix - I of this standard.

b) The approval of the documents by the Purchaser does not absolve the
manufacturer or dilute his responsibilities with respect to the requirements
specified in this standard, datasheets and other enquiry documents.

5.4. The vendor shall submit along with quotation :

a) List of Erection and Commissioning spares as recommended by OEM/supplier.

b) Mandatory spares for Fans & Blowers as mentioned in NIT document. It shall
include but not be limited to the items listed in Mandatory Spare Part List and as
mentioned in enquiry document elsewhere.

c) Two years normal Operation & Maintenance spares as per provided BOQ/SOR
format. These spares shall not be considered for evaluation hence shall not be part of
order at this stage but can be order by client in future.

6.0 PERFORMANCE GUARANTEE

The vendor shall guarantee the data of offered ID/FD Fan in data sheet with the
mentioned tolerances.

7.0 ACCEPTANCE TEST

The acceptance test and measurements (at shop and/or) (at site) are to be executed
in accordance with ASME Power Test Code 6 / Equivalent test code for Fans &
Blowers within the warranty period. All special instruments, tools etc. required for
performance test shall be brought by the supplier on draw back basis.

The acceptance is to be effected as soon as the equipment supplied complies with all
essential requirements of the specifications, and any evident faults or defects have
been removed or an agreement referring to their correction has been arrived at.

8.0 PAINTING

8.1 Painting specification of M/s IOCL shall be followed by the manufacturer.

8.2 All exterior non-stainless steel surfaces subject to atmospheric corrosion with the
exception of machined surfaces shall be epoxy painted.

8.2 All exterior machined surfaces shall be coated with suitable rust preventives.

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 6 OF 10

APPENDIX - I

DRAWINGS & DOCUMENTATION SCHEDULE

- BIDDER SHALL FURNISH ALONGWITH EACH COPY OF BID


- VENDOR SHALL FURNISH 4 COPIES OF DRGS. / DOCUMENTS
FOR APPROVAL
- VENDOR SHALL FURNISH 6 COPIES + 2 TRANSPARENCIES
OF FINAL DOCUMENTS
X - INDICATES APPLICABLE

DESCRIPTION Delivery Time in


weeks from LOI/FOI
For Approval Final
GENERAL :
1 List of drawings / documents including drawing number, 4
revision number, and description and approval status.
X X 2 Detail manufacturing programme (Time Bar Chart). 4
FANS & BLOWERS :
X X X 3 completely filled in data sheet 6
X X X 4 Characteristic Curves - Performance curves, showing 6
discharge pressure, capacity, and brake horse power at
the inlet specified conditions (Pressure, capacity,
temperature, molecular weight). Curve must be supplied
for each stage separately.
X X 5 Spare parts list and price list 6
X 6 Description of Lubrication and sealing system
X 7 Data for selection of motor :
a) Type
b) HP absorbed at duty point
c) RPM
d) Recommended HP

e) GD2 figure for rotating mass of the Fan /


Blower
g) Speed vs Torque for the Fan / Blower
X X X 8 General Arrangement Drawing with all main dimensions, 6
size and location of connections for ductings with all
horizontal & vertical clearance necessary for installation
and disassembly.
X X 9 Certified foundation assembly drawings of fan with driver 4
and common base plate & all accessories.
X X X 10 Cross sectional drawing of fan with parts list 4
11 Instruction manual for erection, installation operation
X X 12 Q.A.P and Test procedure
X 13 Lubrication schedule
INSTRUMENTATION
As per Instrumentation Specification enclosed with
enquiry / order specification.

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 7 OF 10

NOTES:

1. ALL THE FINAL DRAWINGS / DOCUMENTS MUST BE DELIVERED ATLEAST


ONE WEEK BEFORE DESPATCH OF THE EQUIPMENT & ACCESSORIES.

2. FINAL DRAWINGS / DOCUMENTS MUST BE SUBMITTED IN PROPERLY


ARRANGED FOLDERS.

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 8 OF 10

VENDOR LIST

SR. NO. RECOMMENDED VENDOR LIST FOR FANS & COUNTRY OF ORGIN
BLOWERS
FIMA MASCHINENBAU GMBH (MAX FLOW: 900 M3/HR,
1 GERMANY
PER STAGE PR. RATIO: UPTO 1.5)
2 ABB FLAKT INDIA LTD. INDIA
3 AEROVENT PROJECTS PVT.LTD INDIA
4 AIR CONDITIONING CORPN LTD INDIA
5 AIR CONTROL & CHEMICAL ENGG. CO.LTD INDIA
6 BHARAT HEAVY ELECTRICALS LTD. INDIA
BOLDROCCHI INDIA PRIVATE LIMITED (FD/ID FANS /
BLOWERS, CAPACITY 0.84 M3/S TO
7 INDIA
423.9 M3/S, PR. 0.16 KPA TO 64.6 KPA, POWER 2 KW TO
2000 KW)
DRAFT-AIR INDIA PVT. LTD. (AXIAL FANS (FOR LOW
POWER & ENERGY SECTOR) 68000 CMH;
8 INDIA
CENTRIFUGAL FANS ( FOR LOW POWER & ENERGY
SECTOR) 05 TO 270 HP)
MAXFLOW FANS MANUFACTURING (P) LTD. (-
CENTRIFUGAL FAN UPTO 2,25,000 M3/HR (FOR POWER
9 ENERGY, ENVIRONMENT INDUSTRY USE); - AXIAL FLOW INDIA
FAN UPTO 78,500 M3/HR (FOR POWER ENERGY,
ENVIRONMENT INDUSTRY USE))
SONAL ENGG. PLASTIC FABRICATOR (FOR
10 INDIA
FRP/PP/CPVC/BLOWERS/FANS ONLY)
SWAM PNEUMATICS PVT. LTD. (CAPACITY -FROM 1485
11 M3/HR. TO 48000 M3/HR. PRESSURE - FROM 0.7 BARG TO INDIA
3500 MMWC)
12 THERMAX BABCOCK & WILCOX LIMITED INDIA
13 TLT ENGINEERING INDIA PVT LTD INDIA
14 ILLONOIS BLOWERS INC U.S.A

NOTES:

1. Packager shall select the manufacturer of ID/FD Fans or Blower as per above mentioned
approved vendor list of IOCL.

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 9 OF 10

CHECK LIST (TECHNICAL)

SR. BIDDERS REPLY


POINTS BIDDER SHALL COMPLY (CONFIRM COMPLIANCE & SUBMIT
NO. THE REQUIRED DOCUMENTS)
1. VENDOR LIST:
Bidder to confirm the compliance of Approved vendor list.
2. ACCEPTANCE OF NIT (ROTARY PART):
Bidder to submit signed and stamped copy of EM238-TC-
5201 attached with the ITB, which will be considered as a
token of acceptance by the bidder of all Specifications,
terms and condition, clauses mentioned in the this
document.
3. TECHNICAL DETAILS OF FAN/BLOWER:
Bidder to submit details of Blower in their own format for
our review.
1. Blower manufacturer & Model No. :
2. Applicable Standard :
3. Number of Blower blades :
4. Type :
5. Material of Blower blades :
6. Material of blower hub :
7. Diameter of blower :
8. Number of Blades :
9. Blade angle of incidence :
10. Net discharge area :
11. Hub diameter :
12. Total Differential pressure :
13. Total efficiency of Blower:
14. Blower Air flow Rate/Cell:
15. Speed :
16. Blower tip speed :
17. Blower B.K.W. :
18. Horse Power to drive each Blower i.e. actual
19. B.K.W. of motor :
20. Noise level of Blower at Rated pitch & speed
21. Total power consumption at Motor inlet –KW (Guaranteed) :
22. Blower Balancing :
23. Temperature of outgoing mixed air:
4. OVERALL RESPONSIBILITY:
Bidder to note that overall responsibility for complete
Rotary / Machinery items (including their rotor, driver,
coupling etc) for satisfactory performance shall remains
with the packager.

Bidder to confirm.
5. PAINTING OF ROTARY EQUIPMENTS:
Bidder to confirm that the painting of Rotating / machinery
items/parts shall be as per ‘RHQ-EC-CL-WS-0026 REV
00” attached with the ITB / Enquiry.
6. DOCUMENTARY EVIDENCE OF SUCCESSFUL
RUNNING:
For offered model of Fans/blowers, bidder to furnish
documentary evidence of successful running in operation
at least for 2 years after commissioning of supplied unit,
issued by the owner.
7. SPARES PHILOSOPHY:
Bidder to provide list & confirm Spares as per following:
a. Erection & commissioning spares as per bidder

FORM NO: 02-0000-0021F2 REV3 All rights reserved


TECHNICAL CONDITIONS EM238-TC-5201 0
FOR DOCUMENT NO REV
FANS & BLOWERS SHEET 10 OF 10

recommendation & price already considered in unit


price of package.
b. Mandatory spares as per ITB.
c. Bidder Recommended 2 years operation spares (price
separately quoted for future ordering as per client
requirement
8. SPECIAL TOOLS & TACKLES:
Bidder to submit the List of special tools (If required) for
the maintenance purposes of rotary/machinery items.
9. PFD/PID of proposed system showing Rotating
equipments:
Bidder to provide tentative Process flow diagram /
schematic representation of proposed system clearly
showing rotary items.
10. INSPECTION & TESTING :
Kindly confirm that the Inspection & Testing shall be as per
ITB requirements.
11. COUPLING :
Coupling guard shall be non sparking type. Bidder to
confirm.

Note:

1. Bidder shall duly filled-in and submit the checklist (technical) document along with their techno-
commercial bid. Without this, the bid shall not be considered for evaluation from Rotary point of
view.

FORM NO: 02-0000-0021F2 REV3 All rights reserved