KCI-Gauff-Chodai-Soosung-LASA JV
SASEC II Project Implementation Consultants
Head Office: 7, Daerung Technotown 15,401, Simin-daero, Dongangu, Anyang: Gyeonggi-do, Korea
Dhaka Office: House No27, Road No.1, Block G, Niketan, Gulshan 1, Dhaka. Bangladesh
Tel, 9856598 9856599. ‘Email: galbiolee@amaitcom
Our reference: SASEt
-2/PICITL/WC-6T012/202007,3 Date: 23 January 2020
To
The Contractor's Representative
Work Package: 06, 07,08,09,10,11,12
Subject: Baek-filling Behind Bridge Abutment
Dear Sir,
It is known that vehicular traffic generate undue settlement on finish road behind bridge
abutment. To limit this settlement, the embankment fill behind selected backfill material as
shown in the abutment drawing, shall be done with sand of FM not less than 0.8 complying
clause 2.5.3.6 of the specification.
The sand layer below ISG, shall be compacted as per above mentioned clause. To facilitate
proper compaction, the sand bed may be around 15m long or as directed by the Engineer.
We, therefore, request you to follow above mentioned instruction and then submit a detailed
method statement on this matter.
Yours sincerely,
/SASEC Road
Connectivity
Project!
LEE Sang-Koo
Team Leader, PIC
SASEC Road Connectivity Project-2
Copy to:
1. The Project Director (ACE, RHD), SASEC Road Connectivity Project-2
2. Additional Project Director-1(SE, BBA),2,3(SE, RHD), SASEC Road Connectivity Project-2
3. Project Manager-2(EE, BBA),3,4,5,6,7,8 (EE, RHD), SASEC Road Connectivity Project-2
4, Resident Engineer-6,7,8,9,10,11,12, PIC Field Office
5. Project Manager, Contractor Representative, Field Office.
6. Office Copy.
Ghee
{In association with BCL Associates Limited, BETS Consulting Services Ltd, Development Technical
Consultants Pvt, Lid. and Phitkoe! International Inc.