2. Package No:-
7. Width of Bridge in m:
(ii) Name of the benefitted Habitation (s) (to be cross Sr.N Name of Village Population
checked with CN-VI) with population
1
Total
9. Whether the Road proposal was sanctioned earlier : Yes / No
(i) If Yes, please mention the Phase, MoRD Sanction letter No and Date of sanction :
Phase : MoRD Sanction No. Date
(iii) Whether any CD/ Causeway was Sanctioned at or nearby location with the road
proposal and whether the same was constructed or not (if yes, the details thereof with
chainage:
(iv) Whether the roadwork has been completed or in progress and likely date of completion:
(v) If not, How the connectivity and movement of traffic was ensured:
(vi) Reasons for not proposing the Bridge at the time of submission of Road proposal:
10. Estimated Cost (Rs. In Lakhs) Item Total Cost (Rs in Lakhs) Cost per m
Approaches
Bridge Super
Structure
Foundation
Others
Total
MoRD Share State Share
(MoRD share and State share to be calculated as per the norms of MoRD/NRRDA)
11. INDEX MAP (not to scale ) : Attached
saperately
Enroute Habitations Name / Chainage
Name
Target Habitation
H1 H2
MDR-42
MSH-6
ROAD
c. Arrangement of Spans
Total Span No. of Vents Clear Span of Vent
Abutments
Parapets
Deck Slab
Piers
Wing Walls
Wearing Course
Joints
Drainage
WBM Gr -I I
WBM Gr -I I I/ MPM
Prime Coat
Tack Coat
Seal Coat
D. Protection works
17. Whether the Bridge has Geometrics as per latest Circular of NRRDA.:
DO.#P-17035/1/2007-Tech. 30th September, 2010. YES / NO
18. Whether the Cost etimates are as per standerd data analysis and S.S.R.
Counter Signatures of
Co-ordinator STA :
To be filled by State Technical Agency
20. Is the proposed work is for CD/Causeway of any length or brigde with span excluding approaches less YES / NO
than 15m.
STAs need not clear such proposals
* Span of bridge: C/C distance along the centre line of the bridge between inner faces of dirt walls.
c. Whether type of foundation & resting strata as per survey report justified to be safe YES / NO
d. Whether Hydraulic design is checked & found to be adequete as per site requirements YES / NO
e. Whether RCC designs are checked and found to be economical & safe. YES / NO
f. Whether the provisions made by PIU are sufficient & essentia from economy point of view. YES / NO
22 If the Proposal is for a Bridge for which Road was already Sanctioned
If Yes, Have you verified and satisfied yourself with all the items listed at Sr. No. 7, by PIU Yes / No
Have you satisfied yourself that the road is a part of Core Network Yes / No
23 Are you satisfied with the following
Engineering Surveys (L section, X sections must be verified) Yes / No
Soil/ Material Investigation Yes / No
Hydraulic Studies. Yes / No
( Catchment for structures to be verified from topo sheet. Location and requirement of structures to be
verified from L section and catchment area to be marked on Topo Sheet Copy )
25 Does the Estimation Conform to Standard Rate Analysis and SoR generated for Yes / No
the current Phase for PMGSY works and a copy of SoR provided to STA
Kindly indicate whether the program of visit was informed to NRRDA for prior approval ?
28 Secific Remarks, if any, by STA
( Specific remarks of STA about the overall Bridge Project are necessary on each DPR)
29. Certificates:
Certified that the proposal of bridge is checked & found to be it is missing bridge on sanctioned road & in the same stretch as it was
sanctioend in previous phase under PMGSY.
Certified that the Design and Estimation for the Proposed bridge are based on the latest Circular of NRRDA:vide DO.letter #P-
17035/1/2007-Tech. 30th September, 2010.
Certified that the Design and Estimation for the Proposed bridge are based on the data and SSR provided by PIU Engineers . The