Foundation Details of Raft & Footing Details Key Plan: Scale - (NTS) Scale - (NTS)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AREA CALCULATION

RAW SEWAGE
PUMPS
{in sqmt}

ROTATING MEDIA BIOREACTOR


775 CFM
FLOOR BUILT UP PROJECTIONS TOTAL DEDUCTION'S AREA TOTOL TOTAL
T AREA AREA
385 CFM
200X200
250X200 COV. DEDUCTIONS BUILT UP
195 CFM PROJ./ REFUSE AREA LIFT DUCT/ FIRE OTHER { 5+6+7+8 } AREA { 4-9 }
ACTIVATED CARBON
250X150
PRESSURE SAND#04
FILTERS FILTER
TERRACE AREA WELL VOID STAIR {parking}
FILTER FEED
PUMP
{1} {2} {3} {4} {5} {6} {7} {8} {9} { 10 }
1.000

B - 01 9735.76 0.00 0.00 9735.76 44.78 16.7 68.43 0.00 129.91 9605.85
B - 02 9735.76 0.00 0.00 9735.76 44.78 0.00 68.43 0.00 113.21 9622.55
G. F. 2668.16 0.00 0.00 2668.16 44.78 30.05 31.54 0.00 106.37 2561.79
1st. F. 2638.90 74.1 0.00 2564.80 44.78 30.05 31.54 119.31 229.68 2335.12
2nd.F. 2638.90 74.1 0.00 2564.80 44.78 30.05 31.54 0.00 106.37 2458.43
3rd. F. 2638.90 936.42 0.00 1702.48 44.78 30.05 31.54 0.00 106.37 1596.11
4th. F. 1776.57 434.93 0.00 1341.64 44.78 30.05 31.54 0.00 106.37 1235.27
5th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
6th. F. 1435.19 38.5 68.02 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
7th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
8th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
9th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
10th. F. 1435.19 38.5 68.02 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
11th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
12th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
13th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
14th. F. 1435.19 38.5 68.02 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
15th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29

FOUNDATION DETAILS OF RAFT & FOOTING DETAILS


SCALE - (NTS)
KEY PLAN
SCALE - (NTS)

UNDER GROUND WATER TANK CAPACITY


B
XXX
RAW SEWAGE
PUMPS
FIRE FIGHTING WATER TANK (2 NOS.) = 100000 LTR.
ROTATING MEDIA BIOREACTOR

ACTIVATED CARBON
FILTERS
PRESSURE SAND
2.5 M TWO WHILLER DRIVEWAY
R.C.C RETAINING WALL AS/ STRUCTURE DWG. FLUSHING WATER TANK = 65000 LTR
FILTER

FILTER FEED
PUMP

DOMESTIC RAW WATER TANK = 51000 LTR


DOMESTIC TREATED WATER TANK = 51000 LTR
2.5 M TWO WHEELER DRIVEWAY 2.5 M TWO WHEELER DRIVEWAY
RAIN WATER TANK = 150000 LTR
CHILLER WATER TANK = 150000 LTR
6.0 M DRIVEWAY 6.0 M DRIVEWAY
P P P P P P P P P P P P P P P P P P P P P P

STP CAPACITY
6.0 M DRIVEWAY 6.0 M DRIVEWAY RAW SEWAGE WATER TANK = 42 KL
SETTLING TANK = 20 KL
OPENABLE DOOR
TREATED WATER TANK = 42 KL
6.0 M DRIVEWAY
5.5 M DRIVEWAY

POINT
PARKING CALCULATIONS
5.0 M DRIVEWAY

5.5 M DRIVEWAY
FOR TOWER-01-15TH FLOOR
SYMBOL DESCRIPTION
WAY

ACENT CHILLER PLANT ROOM


MULTI STACK PARKING 31
DRIVE

POINT
WAY

SINGLE STACK PARKING 327


Y

FOR
WA

6.0 M

5.5 M DRIVEWAY
DRIVE
IVE

AY
ACENT PARKING FOR HYBRID/ELECTRIC CAR 22

W
R
MD

DRIVE
3.0 M

PARKING FOR HYBRID/ELECTRIC TWO WHEELER


P

53

Y
6.0

WA
6.0 M
PARKING TWO WHEELER 427

DRIVE
WAY
DRIVE

TOTAL- NOS OF CARS=(2x31+327+22)= 411

3.0 M
& TWO WHEELER =480 (BOTH BASEMENT )
5.0 M

)
:10
service
STRUCTURAL STABILITY CERTIFICATE

E1
service area

AY
P

W
area

SLO

DRIVE
THIS IS TO CERTIFIY THAT SEISMIC LOADS HAVE BEEN

P(

5.5 M DRIVEWAY
M
TAKEN UNDER CONSIDERATION WHILE DESIGNING THE
AY

service

RA

1:10
5.5 M
EW

service area
STRUCTURE OF THIS BUILDING.

IDE
IV

area

RAMP
DR

MW
THE DESIGN HAS BEEN DONE AS PER IS 1893/1894 & I.S
M

3.0 M

7.5
T WO W
6.0

Y
HEELE
R DRIV
EWAY
4326/1993.
WA
IVE
DR

W HE
ELE
R
AREA OF THE SITE = 11512.48 sqm
WO
MT
3.0 BUILT UP AREA = 25337.83 sqm
GROUND COVERAGE (%) = 23.17%
5.0 M DRIVEWAY

7.5 M
WIDE FAR = 2.20
AY

RAMP
EW

(SLOP
E 1:10
) BASEMENT 02 AREA = 9735.76 sqm
IV
DR

BASEMENT 01 AREA = 9735.76 sqm


M
8.0

7.5 M
BUILDING FOOTPRINT = 2699.19 sqm
7.5 M WIDE RAMP (SLOPE 1:10)

WIDE
RAMP
Y

(SLOP
WA

TOTAL CAR PARKING=205


E 1:10) HEIGHT OF THE BUILDING = 68.85 m (upto lift machine room)
E
RIV

NO. OF STORIES = B1+B2+G+15


D
6M

TOTAL CAR PARKING=175 PROJECT TITLE


PROPOSED CIVIC TOWER AT DHURVA, RANCHI
6.0 M DRIVEWAY 6.0 M DRIVEWAY
CLIENT
RANCHI MUNICIPAL CORPORATION
7.5 M WIDE RAMP (SLOPE 1:10)
6 M DRIVEWAY 6 M DRIVEWAY
CONSULTANT
JHARKHAND URBAN INFRASTRUCTURE DEVELOPMENT COMPANY LTD.

BASEMENT - 2 PLAN BASEMENT - 1 PLAN