Foundation Details of Raft & Footing Details Key Plan: Scale - (NTS) Scale - (NTS)
Foundation Details of Raft & Footing Details Key Plan: Scale - (NTS) Scale - (NTS)
Foundation Details of Raft & Footing Details Key Plan: Scale - (NTS) Scale - (NTS)
RAW SEWAGE
PUMPS
{in sqmt}
B - 01 9735.76 0.00 0.00 9735.76 44.78 16.7 68.43 0.00 129.91 9605.85
B - 02 9735.76 0.00 0.00 9735.76 44.78 0.00 68.43 0.00 113.21 9622.55
G. F. 2668.16 0.00 0.00 2668.16 44.78 30.05 31.54 0.00 106.37 2561.79
1st. F. 2638.90 74.1 0.00 2564.80 44.78 30.05 31.54 119.31 229.68 2335.12
2nd.F. 2638.90 74.1 0.00 2564.80 44.78 30.05 31.54 0.00 106.37 2458.43
3rd. F. 2638.90 936.42 0.00 1702.48 44.78 30.05 31.54 0.00 106.37 1596.11
4th. F. 1776.57 434.93 0.00 1341.64 44.78 30.05 31.54 0.00 106.37 1235.27
5th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
6th. F. 1435.19 38.5 68.02 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
7th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
8th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
9th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
10th. F. 1435.19 38.5 68.02 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
11th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
12th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
13th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
14th. F. 1435.19 38.5 68.02 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
15th. F. 1367.16 38.5 0.00 1328.66 44.78 30.05 31.54 0.00 106.37 1222.29
ACTIVATED CARBON
FILTERS
PRESSURE SAND
2.5 M TWO WHILLER DRIVEWAY
R.C.C RETAINING WALL AS/ STRUCTURE DWG. FLUSHING WATER TANK = 65000 LTR
FILTER
FILTER FEED
PUMP
STP CAPACITY
6.0 M DRIVEWAY 6.0 M DRIVEWAY RAW SEWAGE WATER TANK = 42 KL
SETTLING TANK = 20 KL
OPENABLE DOOR
TREATED WATER TANK = 42 KL
6.0 M DRIVEWAY
5.5 M DRIVEWAY
POINT
PARKING CALCULATIONS
5.0 M DRIVEWAY
5.5 M DRIVEWAY
FOR TOWER-01-15TH FLOOR
SYMBOL DESCRIPTION
WAY
POINT
WAY
FOR
WA
6.0 M
5.5 M DRIVEWAY
DRIVE
IVE
AY
ACENT PARKING FOR HYBRID/ELECTRIC CAR 22
W
R
MD
DRIVE
3.0 M
53
Y
6.0
WA
6.0 M
PARKING TWO WHEELER 427
DRIVE
WAY
DRIVE
3.0 M
& TWO WHEELER =480 (BOTH BASEMENT )
5.0 M
)
:10
service
STRUCTURAL STABILITY CERTIFICATE
E1
service area
AY
P
W
area
SLO
DRIVE
THIS IS TO CERTIFIY THAT SEISMIC LOADS HAVE BEEN
P(
5.5 M DRIVEWAY
M
TAKEN UNDER CONSIDERATION WHILE DESIGNING THE
AY
service
RA
1:10
5.5 M
EW
service area
STRUCTURE OF THIS BUILDING.
IDE
IV
area
RAMP
DR
MW
THE DESIGN HAS BEEN DONE AS PER IS 1893/1894 & I.S
M
3.0 M
7.5
T WO W
6.0
Y
HEELE
R DRIV
EWAY
4326/1993.
WA
IVE
DR
W HE
ELE
R
AREA OF THE SITE = 11512.48 sqm
WO
MT
3.0 BUILT UP AREA = 25337.83 sqm
GROUND COVERAGE (%) = 23.17%
5.0 M DRIVEWAY
7.5 M
WIDE FAR = 2.20
AY
RAMP
EW
(SLOP
E 1:10
) BASEMENT 02 AREA = 9735.76 sqm
IV
DR
7.5 M
BUILDING FOOTPRINT = 2699.19 sqm
7.5 M WIDE RAMP (SLOPE 1:10)
WIDE
RAMP
Y
(SLOP
WA