Volume I-Main Report-Khairahani Municipality
Volume I-Main Report-Khairahani Municipality
Volume I-Main Report-Khairahani Municipality
Contract ID DUDBC/CS-QCBS-12-074/75
SUBMISSION INFORMATION
Nos. of Volume I
Prepared By ………………………
Checked By …………………………
Reviewed By ………………………….
i
ACKNOWLEDGEMENTS
ii
EXECUTIVE SUMMARY
The IUDP project has been executed by Department of Urban Development and Building
Construction, Ministry of Urban Development, Government of Nepal. Khairahani municipality
of Chitwan in the Gandaki Province is also one of the project areas of IUDP where it is expected
to contribute overall development of the municipality in the long-run. The project comprises
various aspects of urban planning and analysis by incorporating multi-sectoral issues of
development, which includes physical, social, economic, financial, environmental and
institutional. The project is the comprehensive analysis of regional attributes, local needs and
aspirations, urban services and future prospects of this municipality for the subsequent 5, 10 and
15 Years. The rationality and scope of the project thus lies in the new context of state-
restructuring and urban planning.
Methodological approach: Both the qualitative and quantitative nature of data have been used
from primary and secondary sources. The process includes three sub-sequent phases: a) literature
review and desk study; b) field study and primary data collection; and c) analysis and planning.
The data collection tools include participatory rapid appraisal (PRA) and focused group
discussions (FGDs), key informant interviews (KIIs), and questionnaire survey. These tools were
mutually adopted and endorsed into the field along with Induction workshop, SWOT analysis
and discussion of vision setting. The field analysis then includes sectoral workshop and
consultation, linkage analysis, trend analysis, spatial analysis, gap analysis which further
proceeded with preparation of development plans as per the given ToR.
Opportunities and Challenges: In the new federal context of state-restructuring, recently
elected local government after a long political turmoil has been a great opportunity for
Khairahani municipality. Strategic location and its wider connectivity along with various link
roads is another opportunity. Moreover, market exposed to different areas and urban centers
including Narayanghat can enhance the economic development of this municipality. The vicinity
of Chitwan National Park to this municipality has increased potentiality of tourism promotion
and biodiversity promotion. However, apart from these opportunities, there are some challenges
in the municipality. The challenges include: increasing migration trends, haphazard settlement
and absence of land use plan; lack of urban scale health and educational institutions; low
availability of recreational activities/ services, and institutional problems related to capacity
building and infrastructural development of the municipality in the changing context of local
development and federal set-up.
Long-term vision setting: The Khairahani municipality has its own development implications
and planning strategies. It is highly potential to cater long-term development involving various
sectors of Tourism, Agriculture, Industry and Infrastructural development. Availability of
abundant forest coverage, and both plain and foot-hill land in and around the municipality has
enhanced the extension of agricultural market as well as bio-diversity conservation. As stated-
æJoj;flos s[lif, ko{6g hn >f]t / k"jf{wf/ M :jR5, x/fe/f ;d[4 u}8fsf]6sf] cfwf/Æ-
the long-term vision truly clarifies that all the plans in Khairahani municipality should focus to
iii
make the city as a beautiful, peaceful and prosperous place. Compatible with this vision setting,
an integrated urban plan seems to be a vital one in achieving the municipal vision and mission at
large by involving multiple sectors and stakeholders.
Trend Analysis: The consultants further studied the trend analysis of the municipality which
includes the review of prepared maps and other information which gives historical development
pattern in three sub-sequent points of time, i.e. 2005, 2010 and 2017. The trend has been
analyzed in terms of settlement structure, and changes in forest coverage, land use, cultivation,
and water bodies. The settlement area is increased by 3.15% in 11 years’ period. It is probably
due to the expansion of market area, natural increase of population and in-migration. Similarly,
cultivation land is in decreasing trend in different years (decreased by 6.672% in 12 years). Due
to the increment in settlement areas, it could have automatically resulted in decreasing in
cultivation area. The findings further reveal that the percentage of land covered by forest in
2005, 2010 and 2017 are 20.814%, 21.513% and 21.991% respectively. The changes in forest
cover is nominal and it should be further prioritized for forestation and plantation. Water body in
the municipality is decreased by 3.35% in the same period which is due to the encroachment
around the water bodies by different means.
Spatial analysis: The spatial analysis has been one of the impotant outcomes of this project. The
planners have endorsed different analytical components to make a comprehensive spatial analyis.
This include:
Easy Accessibility Analysis: Accessibility analysis has been done bringing together all
aspects of transport system as per distribution of population and road network along with
spatial distribution of various infrastructures such as education facilities, health facilities,
market places etc. in different land zoning.
Linkage Analysis: Linkage analysis of the municipality indicates adjacency of the
municipality with its hinterlands in terms of social mobility and movement of goods,
services and people in and out involving both inter and intra regional perspectives.
Site Suitability Analysis: The demand for new residential areas in the municipality is
rapidly increasing because of increasing population, migration and urbanization. The
identified suitable settlement sites can be delineated on map, which shows the spatial
distribution of topographically suitable and safe, climatically pleasant and environment
friendly area for settlement, based on topographical, hydrological and environmental
data. Similarly, flood & drought susceptibility analysis, forest fire analysis, stream order
analysis, buffer analysis, Population served analysis have been also included to
compliment the spatial analysis.
Gap analysis: On the basis of infrastructure and necessities, a demand analysis has been also
included involving the parameters of population size, space requirement, and road types, etc. as
defined by Planning Norms and Standard, 2013. The gap of infrastructures between existing
scenario and planning norms is studied which helps further for the planning of the municipality.
Multi-Sectoral Investment Plan (MSIP): Among all the development plans proposed with the
IUDP in this municipality, the MSIP has been a summarization of detail projects and investment
iv
attributes for different years both in short term and long-term. It comprises specific investment
plan with respect to defined sectoral goals, objectives, strategies and activities to fulfil the long-
term vision of the municipality. In total, the projected MSIP budget for 15 years in this
municipality is NPR 34805.80 million, which has been allocated for different plans and sectors.
For completion of most of the strategic projects, time frame ranges from 1-5 years to maximum
time frame of 1-15 years particularly for physical infrastructures.
Chapter outline:
Chapter 1 introduces the project “Integrated Urban Development Plan” with its goal and
objectives, scope; and expected outputs.
Chapter 2 provides the detail process of methodology involving data collection and analysis
tools and techniques.
Chapter 3 provides municipal profile of Khairahani municipality in summary, comprising
different dimensions of socio-economic, physical, institutional, land use, environmental and
existing livelihood conditions.
Chapter 4 provides the critical analysis of the existing situation using various analytic tools and
forecast a future need base demand by discussing Trend analysis, Spatial Analysis, Social
Analysis, Economic Analysis, Financial Analysis, Institutional Analysis, SWOT analysis and
Demand Analysis
Chapter 5 provides development framework for the municipality including development vision,
its goal, objective and Strategies.
Chapter 6 presents the Sectoral Development Plans along with Logical Framework Analysis
(LFA), viz. Physical Development Plan, Urban Infrastructure Plan, Urban Transport Plan, Social
Development Plan, Economic Development Plan, Tourism and Cultural Development Plan,
Financial Development Plan, Environment Management Plan, Disaster Management Plan and
Institutional Development Plan
Chapter 7 presents Multi Sector Investment Plan in different time period i.e. for short term (up
to 5 years), mid-term (up to 10 years) and long term (up to 15 years)
v
ACRONYMS/ABBREVIATIONS
vii
TABLE OF CONTENTS
1
PROJECT INFORMATION.........................................................................................................i
SUBMISSION INFORMATION..................................................................................................i
ACKNOWLEDGEMENTS..........................................................................................................ii
EXECUTIVE SUMMARY..........................................................................................................iii
ACRONYMS/ABBREVIATIONS..............................................................................................vi
CHAPTER I: INTRODUCTION.................................................................................................1
1.1 Background of Project.....................................................................................................1
1.2 Objectives of the Study....................................................................................................2
1.3 Understanding the Scope of Work...................................................................................2
1.4 Expected Output..............................................................................................................4
1.5 Structure of the Report.....................................................................................................7
CHAPTER II: METHODOLOGY..............................................................................................9
2.1 Conceptual Framework....................................................................................................9
2.2 Field Team Mobilization...............................................................................................10
2.3 Secondary Data Collection & Conducting Survey........................................................10
2.4 Public Consultation Plan................................................................................................10
2.5 Primary Data Collection................................................................................................13
2.6 Preparation of GIS Base and Preparation of Thematic Maps........................................13
2.7 Data Analysis.................................................................................................................19
2.8 Vision Setting................................................................................................................20
2.9 Sectoral Development Plans..........................................................................................20
2.10 Multi Sectoral Investment Plan.....................................................................................20
2.11 Preparation of DED.......................................................................................................20
2.12 Preparation of Building Bye-laws.................................................................................21
viii
2.13 Limitation of the Study..................................................................................................21
ix
4.8 Demand Analysis of Infrastructures..............................................................................69
4.9 Potential Lead Sector Identification..............................................................................77
x
6.5.5 Park and Open Space...........................................................................................113
6.5.6 Urban Social Service Centre................................................................................114
6.5.7 Social Development Issues and Problems...........................................................114
6.6 Economic Development Plan......................................................................................115
6.6.1 Industrial Development and Trade Promotion....................................................115
6.6.2 Employment Generation, Poverty Reduction......................................................115
6.6.3 Regional Competiveness of Municipality...........................................................115
6.6.4 Agriculture Development....................................................................................116
6.6.5 Strategic Location of Different Market Centre/Product Collect Centres............117
6.6.6 Possible Economic Zones Based on Local Economic Growth Potentials...........117
6.6.7 Potential and Problems of Economic Development Plan....................................118
6.7 Tourism and Cultural Development plan....................................................................119
6.7.1 Identification and Preservation of Cultural Heritages Sites................................119
6.7.2 Conservation of Both Material and Non-Material Cultures................................120
6.8 Financial Development Plan........................................................................................122
6.8.1 Municipality Revenue Improvement Plan(MRIP)...............................................123
6.8.2 Assessment of Possible Financial Resources......................................................123
6.8.3 Allocation of Development Budget.....................................................................124
6.8.4 Promotional Strategy for Private Sector and Civil Society.................................126
6.8.5 Economic and Financial Analysis.......................................................................126
6.8.6 Issues and Problems.............................................................................................127
6.9 Environment Management Plan..................................................................................129
6.9.1 Present Status.......................................................................................................129
6.9.2 Issues and Problems.............................................................................................129
6.9.3 Strategy of Environmental Management Plan.....................................................131
6.10 Disaster Management Plan..........................................................................................133
6.10.1 Present Status.......................................................................................................133
6.10.2 Issues and Problems.............................................................................................133
6.10.3 Adaptation Strategy for Disaster Management....................................................134
6.11 Climate Change Adaptation Plan.................................................................................136
6.11.1 Present Status.......................................................................................................136
6.11.2 Issues and Problems of Disaster..........................................................................137
6.11.3 Adaptation Strategy for Climate Change Mitigation...........................................138
6.12 Institutional Development Plan...................................................................................140
6.12.1 Issues and Challenges..........................................................................................141
CHAPTER VII: MULTI SECTOR INVESTMENT PLAN (MSIP)...................................143
7.1 MSIP Program/Projects for Short Term......................................................................148
xi
7.2 MISP Program/Projects for Mid term..........................................................................157
7.3 MSIP Program/Projects for long term.........................................................................167
ANNEXES..................................................................................................................................180
Annexes-1: DED Selection Matrix......................................................................................180
Annexes-2: DED Selection Matrix of Khairahani Municipality.........................................184
List of Figures......................................................................................................................189
List of Tables.......................................................................................................................189
List of Photos.......................................................................................................................191
List of Maps.........................................................................................................................191
xii
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
1 CHAPTER I: INTRODUCTION
Keeping in view of this context, the Government of Nepal has already enacted and has been
implementing National Urban Policy since 2007. The policy is conspicuous by prioritizing
investment to the lagging regions of the country, while fostering development of regional
cities and intermediate towns as well. Therefore, with an objective with and objective of
reducing migration to capital and other larger cities, encouraging planned development of
potential hill cities and building infrastructures that can facilitate about one thousand
populations in hilly cities. With the promulgation of new constitution of Nepal in September
2015, there has been subsequent changing in the local level unites in the federal context. The
Constitution has provisioned a three-tier of government: federal at the center, provincial at
the meso-level and the local at the bottom (Art. 56, Part 5). The elections of all levels were
held in 2017. Before that, the government of Nepal has set up 753 local units replacing old
municipalities and Village Development Committees (VDCs). There are 460 rural
municipalities and 293 municipalities, including 276 urban municipalities, 11 sub-
metropolitan cities and 6-metropolitan cities in different parts of country. However, as a
Nepal is experiencing a new political system of federalism, it is yet to be equipped with
appropriate Acts and policies to foster the spirit of development and constitution at large.
Nepal is urbanizing at a faster pace and this transformation is irreversible. However, in the
absence of coordinated planning and investment in urban sector, there is need to upscale the
level of innovation, impact and outcomes. Urbanization and urban development is influenced
and oriented by key policies of the state in sectors such as transport, agriculture, tourism,
industry etc. in addition to the policy pursued in the urban sector. A brief review of the extant
policies such as National Transport Policy 2001, National Agricultural Policy 2004, National
Urban Policy 2007, Industrial Policy 2011, Tourism Policy 2008, National Land Use Policy
2015 and National Urban Development Strategy 2017 provides the context for the Integrated
Urban Development Plan (IUDP). The NUDS 2017 has provided a set of informed strategic
set-up in Nepal’s urban development. However, the reflection is pronounced in sprawled
1
https://mof.gov.np/uploads/document/file/pdf
NREC-MCS-GI JV 1|Page
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
urban form, haphazard land use with environment degradation, congestion, deficit in water
supply and other basic services. With six decades of planning experience, it is a high time to
exercise coordinated, integrated, focused and strategic investments that promote harmonized
development to fulfill our urban intentions. The preparation of IUDP is significant in this
direction.
In the changing context of federalism, the Local Governance Operation Act (2074 BS) is now
operating in the local units. The main objectives of this act is to implement the powers and
rights of local level provisioned by Constitution of Nepal promoting co-operations, co-
existence and coordination between federal, province and local levels ensuring people
participation, accountability, transparency in cost effective and qualitative service delivery,
to strengthen democratic republican governing system from local levels, and to strengthen
local governance developing local leadership to institutionalize legislative, executive and
judicial practices at the local level. The act details out the definition of rural municipality its
criteria, municipality, its criteria, role of local level. Likewise, it presents different sector wise
function of then municipality and the rural municipality. It highlights powers and function
and jurisdiction of ward offices to ensure administrative convenience to the local people.
Moreover, as a long-term policy initiative, GoN is providing technical and financial supports
to facilitate the integrated development plan (IDP of the local units. Integrated Urban
Development Project (IUDP) is highly prioritized policy approach adopted by Department of
Urban Development and Building Construction (DUDBC), Ministry of Urban Development.
Following this context, the present report is based on the IUDP of Khairahani municipality,
which lies in the Chitwan District in Province no. 3
1.2 Objectives of the Study
The main objective of the proposed assignment is to prepare Integrated Urban Development
Plan including Building By-laws of Municipalities. The other objectives are as follows:
1. To set out Long-term Vision and overall Goal, Objectives and Strategies for
Municipalities (for 15 years’ period) defining the status of the municipality where it
could stand after 15 years’ period.
2. To prepare Physical development plan, Social, Cultural, Economic, Financial, and
Institutional Development Plan; Environment Sensitive Plan, Urban Transportation
Plan, Multi-Sectoral Investment Plan (MSIP) etc. on the basis of vision, objectives
and strategies.
3. To prepare building By-laws to regulate development in the municipalities integrating
Land Use and road network-plan and long-term vision of the municipalities.
4. To prepare Detail Engineering Design of prioritized 2 sub-projects in each
municipality amounting not less than 30 crores for each project.
the local government, support of the federal governments, identification of the problems/
challenges, creation of base maps, formulation of different kinds of planning, preparation of
DED for most potential two projects, and so on.:
Formulate state of vision of the municipality separately for the long run development
Identify potential area for urban development based on land suitability and other
factors
Conduct studies on present and future (5, 10 and 15 years) demand in infrastructures
Building and Planning By-laws; is prepared for the construction of building and other
infrastructures with land use zoning i.e.,
i. Residential zone
ii. Institutional zone
iii. Industrial zone
iv. Preserved zone
v. Airport zone
vi. Recreation zone (sport, cinema theatre, swimming etc.)
vii. Urban expansion zone
viii. Stream/river banks zone
ix. Green zone
x. Apartment housing
xi. Petrol pump/Electric line/Cinema theatres and
xii. Mixed zone and others as per requirement.
Executive summary of IUDP; for each municipality in Nepali and English language is
prepared for the purpose of approval from government of Nepal.
natural resource areas and also calamity prone areas. Such physical plan would be separately
supplemented by the relevant data and thematic maps of existing land use, environmentally
sensitive areas, and infrastructure services such as road network with parking spaces,
transportation, water supply and drainage system, sewerage network, solid waste
management including landfill site, telecommunication network and electricity distribution
network. A classification of the open space will also be justified within municipality areas.
Plan should also be supplemented by social and economic data and thematic maps revealing
the social and economic infrastructures of the Municipality. New concepts such low carbon
city, food green city, garden city etc. have been also recommended wherever it is required.
Social Development Plan: Social development plan significantly contributes to bring
qualitative improvement in the lives of the common people. Attention has been given focus
on social development program when social development program is getting priority in the
present context. The plan has been under formulation on the basis of the analysis of social
condition of municipal area. This essentially covers the different aspects of Education; Public
health; Security (physical as well as social); Cultural and Sports; Parks& open spaces; and
other urban social service centers (information, library, and space for social gathering, etc.).
Conservation, Cultural& Tourism Development Plan: Cultural development plan
significantly contributes to bring qualitative improvement in the conservation of local cultural
heritage, art and architecture. Similarly, more attention has been given to the preservation of
tangible and intangible cultures. This plan essentially covers the following aspect:
Identification and preservation of important Cultural heritage sites
Plan for conservation of both material and non-material cultures and linked them to
tourism development plan
Culture centers (local craft, paint, architecture, museum, culture exchange,
exhibition, etc.)
Economic Development Plan: Economic development plan may be based on the economic
potentiality of the municipalities. This has covered the following aspect:
Areas of comparative advantage
Industrial development as per comparative advantages
Employment generation and poverty reduction
Regional competitiveness of the municipality
Agricultural development
Rural urban linkage- strategic location of different market center/ product collection
centers
Micro/small industry and business promotion
Possible EZs based on local economic growth potentials (driving forces)
Financial Development plan: The following aspects are kept considered while formulation
the financial plan:
Analysis and projection of municipality’s income and expenditure, revenue
improvement action plan,
NREC-MCS-GI JV 5|Page
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Building By-laws: The complete planning and building By-laws should be formulated with
the overlay of cadastral map of the municipal area. This should be based on the municipal
vision and objectives. This may cover following;
General definition
Zoning classification and By-laws/ regulations
Implementation mechanism & procedures etc.
Multi-Sectoral Investment Plan (MSIP): Such plan should reveal short and long-term
programs/projects, tentative cost estimate, and probable financing sources prioritized in
sequential manner for the planning period of each five years. Such programs/projects should
be to cater to both the short-term, mid-term and long-term needs of the municipality and the
wards, and should be consistent with the long-term development plan, sectoral goals and
objectives, and the vision. Furthermore, MSIP should clearly reveal programs/projects for
each fiscal year for the first five years. Such MSIP should be pragmatic, and be consistent
with the financial resource plan. The municipal level plan/projects (Mega project) and the
projects that can be implemented exclusively by municipality also should be clearly
mentioned in MSIP. It is suggested that the plan/projects that have to be implemented by
different line agency in MSIP, included after thoroughly consultation with the concern
offices.
Detail Engineering Design of Prioritized Major Projects: In order to prepare reliable
project banks for the recent execution of different projects in municipality, consultants are
expected to prepare Detail Engineering Design of minimum 2 projects in different sector in
each municipality. It should contain detail engineering and architectural design, detail cost
estimate and BOQ. The prioritized project should be identified in consultation with
concerned municipalities but with the rationale and discussed and approved by DUDBC. The
NREC-MCS-GI JV 6|Page
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
cost estimate of each project should not be less than 30 crores. Soil test shall be conducted
for DED project as per necessity. Necessary details engineering drawings should be
submitted in separate volumes.
Urban Transportation Management Plan
The following parameters have been integrated with proposed land use plan:
Road classification with right of way.
Road network.
Traffic management plan.
Parking management.
Road safety.
NREC-MCS-GI JV 7|Page
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
The main report provides information about the methodology of the project, study and
analysis of the municipality and proposed integrated urban development plans with various
development plans with vision, mission, goal and DEDs.
Structure
of Report
NREC-MCS-GI JV 8|Page
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
This chapter briefly narrates the whole methodological approach and process adopted during
the data collection, analysis and planning for the IUDP. There was data collection (primary
and secondary data) and followed by field visit to validate the data and further information
acquisition. Meetings were conducted on municipality level for preparing a development plan
with participatory way. The data collected were analytically compared for identifying a gap
in the planning process. Finally, an integrated urban development plan was prepared based on
these findings. The figure below shows different phases for preparation of IUDP.
NREC-MCS-GI JV 9|Page
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 10 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 11 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
During the FGDs, different issues such as the economic potentialities, possibility of future
expansion of the settlements, rural-urban linkages, major problems facing/may face in the
future and key projects were focused during the focus group discussion. The information
from FGD and PRA were helpful to identify the potential sectors and major problems of the
settlements. Furthermore, such obtained information also suggested to choose DED projects
from all the selected projects of the particular settlement.
NREC-MCS-GI JV 12 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
works, potential sectors of the settlements, economic, social linkages etc. were collected
through this method.
Survey fill-up after the FGDs
After the completion of FGD, an Institutional Survey was conducted with a prepared set-up
of the questionnaire check-list. The information regarding educational, financial, social
institutions and others private and governmental agencies were collected using the checklist.
In addition, data related to open spaces, name of major settlements, touristic destinations,
agriculture practices, major market centers etc. were collected during the process.
2.5 Primary Data Collection
Preparation of Questionnaire and Checklists
The compilation of secondary data and maps was done after the Literature Review. Findings
of obtained secondary information were incorporated into larger database system and cross-
tabulated. On the basis of literature review and scope of work, checklists and questionnaires
were also prepared to collect primary data from field. The tools used for primary data
collection were Focus Group Discussion (FGD), Participatory Rural Appraisal (PRA),
Global Positioning System (GPS), Induction & Sectoral workshops etc.
Focus Group Discussion was held with different stakeholders like local people, local
leaders, Women group, Dalit, Janajati, Business community etc. Similarly, a Key Informant
Survey Questionnaire was also prepared to collect data from individuals, experts and
different institutions (i.e. municipalities/wards offices, DUDBC Division office,
NGO/INGO, municipality/district different line agencies etc.). These questionnaires and
checklists has been attached in annex section.
Consultation with Stakeholders
The consultants m a d e a n i n t e n s i v e consultation with the local stakeholders such as
representatives of municipalities, TDOs, user’s committee, concerned line agencies, local
people residing within the study area. An interaction was made with the local stakeholders
about the project being carried out by the consultant. They were fully informed about the
objective and the scope of the project. The consultant tried to eliminate any negative
rumors about the project during the discussion. Also, they tried to clarify the
ambiguities about project. The consultant not only expected the co-operation from
stakeholders but also tried to achieve participatory approach in execution of the project.
The objective of consultation was to gather information, sensitize local stakeholders and
identify problems which are done through.
2.6 Preparation of GIS Base and Preparation of Thematic Maps
A base map is a layout of the spatial data and/or orthorectified imagery which serves as
background settings for overlay, dissemination, analysis and delineation of spatial and non-
spatial data. The base map basically serves as background layout for the study of specific area
in terms of physical and temporal status of the ground features.
GIS Base Map
NREC-MCS-GI JV 13 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Geographic Information System (GIS) is a computer based database system that contains
location information along with other attribute information of the ground features. Various
open source and proprietary programs such as QGIS, ArcGIS, Grass etc. can be used to
retrieve information from data base, perform various spatial analysis and delineate the results
in graphical and/ or in tabular form as per the requirement of the user. A graphical
representation of the database system that serves as background layout is called GIS based
base map. It contains location information, feature type information and attribute information
in tabular form which can be accessed from any GIS program and delineated in graphical
form as digital map. This graphical form can be printed in required layout format and scale to
generate a paper map.
An urban area contains various features such as buildings, transportation network, cultivation
land, forest, industrial area, water bodies etc. In order to prepare a GIS based urban base map,
the ground features of the urban area must be classified and proper geometrical representation
of each class must be identified. A GIS based urban base map is an integrated database
system where ground features of urban area are stored by using suitable geometrical
representation and their non-spatial information are attached to them in tabular form in
systematic order. The location information, geometrical information and the attribute
information are stored together in a data base called Geo-database.
Data Models
Various data models are developed to store the location, geometrical and attribute data in
systematic order in geographic information system. Some of them are suitable for one
purpose and some of them are suitable for another purpose
Raster Data
The common features of any urban area are Buildings, Roads, Cultivation Land, Forest,
industrial area, Water bodies etc. These features can be represented by a surface divided into
a regular grid of cells having unique value to each cell. The value of each cell corresponds to
the ground feature. The GIS program interprets the value and represent the cell with different
cartographic variables such as color, texture, intensity, pattern etc. while displaying the data
in graphical form. This data storage format is called raster data format.
Vector Data
Each urban features have some geometrical shape associated with it along with its specific
non-spatial information. The geometry of the feature could be represented by set of point, line
and polygon and the non-spatial information could be attached to each geometric figure in the
form of attribute. Representation of ground feature using this method is called Vector data
model.
Geo-referencing
The image data from any satellite sensor contained error due to different factors such as
climate, perturbation of satellite orbit, topographic undulations etc. In order to rectify the
effects of these factors on the geometry of the ground features, Geo-referencing of the
satellite image has been completed using the geodetic ground control points and DGPs points.
NREC-MCS-GI JV 14 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
In Geo-referencing, several points of known coordinates with their known physical location
on the surface of the earth were collected. In GIS program, the points were identified on the
satellite image with the help of its D-Card and its coordinate is assigned. After assignment of
the coordinates of several points on satellite image, each pixel of the image re-defined its
coordinate on the basis of known coordinates. The detail of the coordinates of the ground
control points and its D-cards are attached in the Annex IV.
DGPS
Several Ground control points with high spatial accuracy were established using differential
global positioning system. These ground control points have been used for Geo-referencing
of the satellite image.
Datum and Projection System:
The datum, generally used in Nepal is Everest 1830 Spheroid datum. It is an
oblate ellipsoid of rotation formed by rotating an ellipse whose major axis and minor axis
were nearly equal to that of the equatorial axis and polar axis of the Earth.
Spatial data
The geometrical as well as attribute information of ground features has been stored in a
database called geo-database. GIS program has been used to retrieve the data and delineate it
in the form of map.
NREC-MCS-GI JV 15 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Satellite Image:
Satellite images of cell size (0.2820024, 0.2820024) m in WGS84 containing the bounding
box of Khairahani Municipality was secured in WGS84 coordinate system. In order to
identify the political boundary of this municipality, political map of Nepal has been secured
from cartographic division of Survey Department of Nepal. The datum of this GIS data was
Everest 1830 datum and the projection system was Modified Universal Transverse Mercator
(MUTM) system.
Datum Transformation:
In order to overlay the political boundary of municipality on the Image data, the spatial
reference system of both the data must be same. Several transformation parameters were
needed to transfer data from one datum to the other. For this purpose, we used 7-parameter
Helmert Transformation which involves 3 translations along 3-axeses, 3 rotations about 3-
axeses and one scale factor. The values of these parameter was obtained from geodetic
division of Survey department of Nepal and is listed below:
Table 1: Transformation Parameter from WGS84 Datum to Everest 1830 Datum
Projection:
After changing the datum, the data was to be projected in modified universal transverse
Mercator system. The parameters used to project Everest1830 datum into MUTM coordinate
system are as follows:
NREC-MCS-GI JV 16 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 17 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 18 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
SWOT Analysis
To identify the strength, weakness, opportunity and threat of municipality SWOT analysis
was conducted. SWOT analysis was carried out at FGD in ward level and induction
workshop at municipality level; to identify the lead sectors for vision setting.
Trend Analysis
Trend Analysis was done through the help of CBS data, maps and discussions. The data of
municipalities was provided through the sectorial workshop and induction report. The trend
of migration was identified according to the study of growing market areas. The land use
pattern of four different years was studied through maps and found out its land use changes.
The increasing pattern of settlement was seen and developing sectors were identified through
the land use map. The linkage of municipality and its market centers were studied through
both ways i.e. inter region and intra region. The actual trend of flow of goods and peoples
was studied during the analysis. Road network pattern was also analyzed. Developing
scenario of infrastructures were also analyzed. The various jobs and economic opportunities
from past and recent years; were also identified.
Spatial Analysis
Spatial analysis was conducted to identify and solve the complex location-oriented problems.
Spatial analysis helped decision makers to understand any event and its present and future
affects within its area of influence. Using spatial analysis, the information from many sources
were combined, overlaid and derived new sets of information by applying sophisticated set of
spatial operators. The spatial analysis has proven to be highly effective for evaluating service
area of some features, the most suitable geographic location for specific purposes, observing
accessibility of infrastructures and identifying new location, interpreting and understanding
change pattern, and much more.
Infrastructure and Necessity
Planning Norms & Standard, 2013 was studied to find out the necessities of infrastructure on
the basis of population.
NREC-MCS-GI JV 19 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
GAP Analysis
The number of required infrastructures about different sectors like education, health, city hall,
public library, security, movie hall, fire-station etc. were found on the basis of provided
norms and standards by using existing population and projected population of municipality.
The no. of existing infrastructures of municipality, were also calculated. On the basis of these
existing and desired numbers, difference i.e. gap was found. This gap analysis, helped to find
the required number of infrastructures to propose in plan. Similarly, others appropriate
indicators were used to find the gap about solid waste, open spaces, road etc.
2.8 Vision Setting
Selection of vision is done during the sectoral workshop which was conducted at Ashwin
24-25, 2075. on municipality level. The consultant facilitated the workshop to set a long
term vision for the municipality along with the identification of lead sectors.
2.9 Sectoral Development Plans
On the basis of various analyses (SWOT, Trend, Spatial, Gap, ward etc.) and the
identification of lead sectors, necessary activities of the different sectors were listed in Excel
sheet with their budget and different time frame. The prepared checklist format for MSIP was
filled at the field. This format became helpful to compile the important activities too.
Thereafter, the different Logical Framework Approaches (LFAs) of different sectors were
tabulated for the formulation of different development plans. The vision, goals, and strategies
were determined for all development plans after fixing the objectives. Eventually, the
consultants prepared different development plans, viz. physical development, social
development, economic development, financial development, conservation and tourism
development, institutional development, environmental management, disaster risk
management plan, climate change adaptation plan and multi-sectoral investment plan. Thus,
all these plans constitute an Integrated Urban Development Planning (IUDP) for this
municipality.
2.10 Multi Sectoral Investment Plan
Various important sectors and programs were selected during the sectoral workshop.
Investment plans were prepared for every programs. Such plans revealed short and long term
programs, tentative cost estimate and probable financing sources. Those plans and programs
were prioritized in sequential manner for the planning period of each five years. Multi
sectoral investment plan was prepared for prioritizing projects according to its importance
and estimating required budget and investing sectors for related projects.
2.11 Preparation of DED
After the meetings and discussions with local bodies, related NGO/INGO, local parties and
other stakeholders, various plans and programs were listed which will help for the long term
development of the municipality. By considering the vision of the municipality and the DED
selection criteria provided by DUDBC, the major projects for DED were selected. Further,
the DED selection matrix is attached in Annex-1.
NREC-MCS-GI JV 20 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 21 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Demographic Status: According to CBS 2011, the total household size is 12331. The total
population of the municipality is 56094 where 26075 (46.48%) are male and 30019(53.51%)
are female. The average household size is 4.54. The ward no. 10 is the largest in terms of
household (i.e. 1435 HHs) and also seems biggest in terms of the population size, i.e. 6716.
While as the smallest, ward no. 5 has only 589 HHs which has also the lowest population
size, i.e. 2726 in total.
Physical Status: The majority of total land area in Khairahani Municipality is covered by
cultivation 69.514%, 21.019% by forest, 2.193% by barren land. Similarly, 1.144% by
industrial area, 1.748% by river 2.253% by Built-up and remaining by Orchard, Tree cluster,
Grassland, Open space, Pond area, sand area etc. The majority of the road are gravel and
earthen road in the municipality whereas there is 24 blacktop road. Width of the road in the
municipality ranges from 4m to 20m width. 96.6% household of the municipality have access
to electricity facility however remaining household uses solar energy. The municipality have
the facility of different communication network such as NTC, NCELL etc. There is not
proper facility of drainage and sewerage in the municipality.
Social Status: Khairahani municipality has a mixed type of caste/ethnic composition
including Brahmin, Chhetri, tharu, magar, tamang, newar, Khas-Aryas and the Mongolians.
The presence of Tharu community is common in most of the wards. Majority of the
population follows the Hindu religion and speak Nepali language as their mother tongue,
which is then followed by Magar language. With regard to social institution, there are 12
aama samuha,15 women group, 29 youth clubs, 3 child club and 1 sports club. According to
CBS 2011, the literacy rate of the municipality is 74.25% where male literacy rate is 81.82%
and female literacy rate is 67.81%. There are 37 primary school in the municipality as well as
there is 4 higher secondary and 3 graduate and post graduate school. There is 3 government
health post at ward no. 2, 6 & 10 in the municipality as well as 1 government Khop Kendra
and 1 mental hospital at ward no. 11. There is 1 private health post at ward no. 12 and 15
private health clinics and medical hall.
Economic: The main market areas of the municipality include Malpani, Kumroj, Fulbari
Tole, Janachetana Tole, Kapiya, Bairiya, Gauwala, Bairiya and Harnari. There is linkage of
goods to nearby municipalities and districts. Most of the important goods are imported from
Kathmandu and distributed to other municipalities. Mainly goods are imported from
NREC-MCS-GI JV 22 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Bharatpur and Hetauda. Places inside the municipality like Gauwa, Phasera and Sisahani
depend on these market for goods and services.
Khairahani there are number of small, medium scale and cottage industries. Brick factory,
poultry, food, sand and stone and gas factories are growing day by day. Major employment of
the people residing in the municipality is agriculture and livestock followed by labor work
and foreign employment. The major crops produced in the municipality are rice, wheat,
mustard, seasonal vegetable, fruits, etc.
Environmental: The municipality lies in an altitude of 190 m. above from sea level. The
municipality consist of gentle and moderate slope. 97% of the area is gentle and 3% of area is
moderate.
The municipality consist of tropical climate. November-December and January are the
coldest months while May, June and July are the hottest months. Dry summer season begins
in the month of March. The maximum average temperature in the municipality ranges from
28ºC to 30ºC whereas the minimum average temperature ranges from 22ºC to 24ºC. The
annual average precipitation in the municipality ranges from 1758 mm to 1995 mm. The
annual average wind speed ranges from 1.15 m/s to 1.23 m/s. There are 12 community forest
in the municipality. The largest community forest in term of area is Kakali Community Forest
with the area of 760.7 Hectare which lies in ward no. 4.
Financial Status: There are 14 banks and 47 saving and credit cooperatives and
multipurpose cooperative in the municipality. The total expenditure of the municipality is Rs
438896000 out of which current year expenditure of the municipality is Rs 122300000
whereas capital expenditure is Rs 316596000. Similarly, the total revenue of the municipality
is Rs. 401027000 Out of which Rs 393817000 is transfer from government, Rs 7210000 from
internal taxes. Therefore, there is deficit in the budget of the municipality.
Institutional organizational structure: After the federalization, the local government
operation Act, 2017 was introduced which provides the legal framework for local
government to operate. Khairahani municipality is operating as per the duties, function and
responsibilities as provided by the Act.
Religious, Culture and Tourism: There are different castes and ethnic groups living in the
municipality. This municipality is blessed with sacred places like Harashwore temple,
Kankali temple, Cheemkya devi temple, Daraibota Lake, Shivalaya, Buddha Gumba etc. The
cultural home-stays of Tharu ethnic groups has added beauty to the glory of the municipality.
The main touristic site is Home Stay, Kumrose Madhya community Forest, Dharai botya
Lake, Tharu culture museum and home stay, Kankali Temple in the municipality.
NREC-MCS-GI JV 23 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Table 2: Ward-wise HHs and population structure in 2017 and projection (2018-2033)
Existing population
HHs Population (2011)
Projected Population (@2.06%)
Ward (2011
) Femal
Total Male 2018 2023 2028 2033
e
1 1121 4981 2363 2618 5745 6362 7045 7801
2 1044 4514 2086 2428 5207 5765 6384 7069
3 742 3553 1623 1930 4098 4538 5025 5564
4 872 3738 1680 2058 4311 4774 5287 5854
5 589 2726 1252 1474 3144 3482 3855 4269
6 1100 4893 2338 2555 5644 6249 6920 7663
7 630 3026 1339 1687 3490 3865 4280 4739
8 1370 5915 2933 2982 6823 7555 8366 9264
9 1073 4970 2293 2677 5733 6348 7029 7784
10 1435 6716 3067 3649 7746 8578 9499 10518
11 605 2980 1343 1637 3437 3806 4215 4667
12 848 3956 1799 2157 4563 5053 5595 6196
13 902 4126 1959 2167 4759 5270 5835 6462
5609
Total 12331 26075 30019 64700 71645 79334 87849
4
(Source: CBS, 2012; MoFALD, 2017)
NREC-MCS-GI JV 24 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
river 2.253% by Built-up and remaining by Orchard, Tree cluster, Grassland, Open space,
Pond area, sand area etc.
Table 3: Land cover of Khairahani municipality
Further, land use map of the municipality has been presented below:
NREC-MCS-GI JV 25 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
4.1.2.2 Housing
Haphazard settlement pattern is seen in Khairahani municipality. Buildings are concentrated
mainly at Purano Parsa. In some areas like Jyamire and around the main highway, there is
linear development of buildings. The main reason for haphazard development is due to the
market center and also due to the construction of buildings at the cultivation land of
respective land owner by their choice. Market area i.e. Purano Parsa is developed along the
main highway due to the easy accessibility. Settlements are dispersed along the municipality.
NREC-MCS-GI JV 26 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Figure 4: Changing area for forest and water bodies in three different years
In the above graph, it shows the changing land use pattern of Khairahani in years in terms of
percentage. The area of the municipality is 85.54 sq.km. The settlement area is increased by
3.15% in 11 years’ period. Due to the increasing market area and migration, we can see the
change in settlement pattern. Similarly, cultivation land is in decreasing trend in different
years (decreased by 6.672% in 12 years). So, we can see that settlement is increasing around
cultivation land which automatically results in decreasing in cultivation area.
Another graph shows the change in the forest area of the municipality which indicates
increasing in the forest area. The percentage of land covered by forest in 2005, 2010 and
2017 are 20.814%, 21.513% and 21.991% respectively. There is 1.177% increase in the
forest area in 12 years’ time period. Water body in the municipality is decreased by 3.35%. It
shows that area of water body is decreased and it is drying up and forest area is increased
around the water body. So, there is encroachment around the cultivation land and water body
by settlement and forest area.
Figure below shows the change in the settlement pattern of main market area of Khairahani
municipality.
NREC-MCS-GI JV 27 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
The figure below illustrates the change in the settlement, cultivation, forest and water body of
various settlements are also presented below:
Area in 2006 : 17169 sq.m Area in 2010: 26519 Sq. m Area in 2017 : 49954 Sq.m
Map 7: Settlement pattern of Chainpur
Area in 2006 : 142613 sq.m Area in 2010 : 193467 sq.m Area in 2017 : 271629 sq.m
Map 8: Settlement pattern of Kathar Bazar
NREC-MCS-GI JV 28 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Area in 2005 : 516530 sq.m Area in 2010 : 502648 sq.m Area in 2017 : 489019 sq.m
Map 9: Cultivation Land pattern of Kapiva
Area in 2005 : 1091757 Area in 2010 : 875924 sq.m Area in 2017 : 847074 sq.m
sq.m
Map 10: Cultivation Land pattern of Gauwa
Area in 2005 : 904263 sq.m Area in 2010 : 566921 sq.m Area in 2017 : 491883 sq.m
Map 11: Cultivation Land pattern of Siddhipur
NREC-MCS-GI JV 29 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 30 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Area in 2009 : 115548 sq.m Area in 2012 : 79894 sq.m Area in 2017 : 61391 sq.m
Map 15: Water body pattern of Patihani
Area in 2009 : 3834123 Area in 2012 : 1340822 Area in 2017 : 944633 sq.m
sq.m sq.m
Map 16: Water body pattern of Kumroj 6
Area in 2009 : 656445 sq.m Area in 2012 : 549573 sq.m Area in 2017 : 369946 sq.m
Map 17: Water body pattern of Kunaghari
NREC-MCS-GI JV 31 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Landslide risk analysis was done through GIS by analyzing various driving factors of
landslide, various data including Normalized Difference Vegetation Index (NDVI),
Precipitation data, Slope and elevation data were used to carry-out geo-spatial analysis to
identify the areas prone to landslide. No landslide prone areas were detected during GIS
analysis in Khairahani but precautions during construction works are advisable.
Flood Risk
The settlement areas located near to the river bank are more prone to flooding and river
cutting. Million tons of soil nutrients are lost annually from agricultural land as a result of
soil erosion and flooding. This has affected large number of households. Flood risk analysis
was done through GIS by analyzing various driving factors of flood, various data including
Normalized Difference Vegetation Index (NDVI), stream order, Slope and elevation data
were used to carry-out geo-spatial analysis to identify the areas prone to flood.
The total area susceptible to flood in the municipality is 2397.6 Ha, out of which 50.4 Ha of
land is found highly susceptible to flood, while remaining 2347.2 Ha of area in the
municipality has low susceptibility towards flood. All the wards are susceptible to flood but
the wards 3 and 10 seem to contain larger flood prone areas. Flood susceptible areas are
shown in the figure below.
NREC-MCS-GI JV 32 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Settlement
Major Disasters Displacement From Available Plan Or
Ward Risk Detail
(Name) Disaster/Risk Present Needs
(Yes/No)
Bhayar Khola 1 Flood Yes River Tiding
Laxmi Khola 1 Flood Yes River Tiding
2
3 Flood Yes River Tiding
Khola 4 Flood Yes River Tiding
Awareness Program
Forest Fire 4 Yes
To Local People
Dam Under
Construction By
Khola 5 Flood Yes Swiss Project,
Eastern Dam And
River Tiding
Houses,
Farming, River Tiding,
Flood 6 Land Duban Yes Rescue Team
And Human Needed
Risk
Land Create Disaster
Flood and Landslide
7 Cutting / Yes Management Fund
Fire In Forest
Duban In Municipality
River Tiding,
Human Risk Proper Road On
Flood And Fire 8
Low Village For Fire
Brigade Veihcle
Chanda And Pampha
9 Flood River Tiding
Khola Flood
Flood
20% Of Area
Heavy Windustries 10 River Tiding
Farming Lass
And Storm
Flood
Dam Under
Wild Animals Attack,
11 Construction By
Heavy Windustries
Swiss Project,
And Storm
Budi Rapti Khola
(3km)
Budi Rapti and
12 - River Tiding
Dhungha Khola (6km)
Umraha Khola ( 4.5
Km)
Flood
Risk From Wild 13
Animals
(Source: PRA/FGD, 2018)
Fire Risk
Khairahani Municipality consists of both communities managed as well as government
managed forests and thus the risk of forest fire as well. Other common uses of fire by farmers
NREC-MCS-GI JV 33 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
include burning crop residue and converting forest to agricultural land. Because fire removes
the organic matter and provides an ash bed, which facilitates the growth of grasses, local
people set fire to gather ash, which is locally used as manure. The risk of fire is mainly likely
to outbreak during the windy and the dry season e.g. Chaitra & Baisakh. The lack of
equipment and skilled human resources such as trained fire fighters pose serious challenges
in the municipality. Forest fire map of Khairahani produced using NASA's Fire Information
for Resource Management System (FIRMS) data and Department of Forest Research and
Survey`s forest type data is given below.
Other Risk
Loss of cultivated land, grass/grazing and forest land due to river encroachment is a common
problem, while in some parts abandoned by channels or old riverbeds have been brought into
cultivation or reused as grazing areas or used for tree plantations in hazard areas. The river
morphology is unpredictable i.e. increase bank cutting, bifurcation and flooding which one is
common problem and reoccur every year. Regarding this, sand extraction is also common in
some rivers for household purpose causing huge impact on riverine environment such as
destruction of aquatic habitat, flooding, change in river morphology etc. There is
NREC-MCS-GI JV 34 | P a g e
War Low
d no. Drought
Final Report:(Ha)
Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
1 61.10
2 136.73
deforestation and habitat degradation in all wards due to construction of rural roads. The big
3 140.16
settlement
4 areas
45.58 are located near to forest area causing further degradation of forest
Another
5 major41.82problem in the municipality is drought. Drought is a natural phenomenon that
6
has drastic 27.61
implications on human lives, food insecurity and natural resources degradation.
7 22.87
Due to drought peoples are suffering from water shortages affecting agriculture, with social
8 48.44
consequences
9
such as famine, hunger, and migration. Drought risk analysis was done through
127.50
GIS10by analyzing
89.52 various driving factors of drought; data including Normalized Difference
Vegetation
11 Index (NDVI) and Normalized Difference Water Index (NDWI) were used to
33.33
12 77.51
carry-out geo-spatial analysis to identify the areas prone to drought. In Khairahani
13 74.00
municipality, 926.18 Ha of total area has low risk of drought and all the wards are susceptible
Total 926.18
to drought as seen in the map below. Wards no 2, 3 and 9 seem to contain larger areas
susceptible to drought.
NREC-MCS-GI JV 35 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Months
S.N. Disasters
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
2 Fire
3 Soil
erosion
4 Flood
5 Drought
The disasters are found to occur mainly during the months of March to September.
NREC-MCS-GI JV 36 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
From the above map, it is found that there is lack of open space in areas like Chainpur,
Tungara, Badgaun, Ghogarela and Gauwa. For quality living, open spaces in these remaining
areas should be proposed.
4.2 Spatial Analysis
Any topographic feature or event on the earth surface is related with location information
and, hence, can be placed on the map. The Geographic Information System answers the
question, what is present and where it is. The real world can be represented as discrete data,
stored by its exact geographic location (called “vector data”), or continuous data represented
by regular grids (called “raster data”).
Spatial analysis allows to solve complex location-oriented problems and better understand
where and what is occurring in our world. Spatial analysis lends new perspectives to our
decision making. Using spatial analysis, we can combine information from many sources and
derive new sets of information by applying a sophisticated set of spatial operators. So, the
spatial analysis has proven to be highly effective for evaluating the geographic suitability of
certain locations for specific purposes, estimating and predicting service provided area,
interpreting and understanding change pattern, observing accessibility of infrastructures and
identifying new location, and much more.
NREC-MCS-GI JV 37 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Each citizen must not walk more than 30 minutes to reach the nearest health post.
Each citizen must not walk more than 45 minutes to reach the nearest Hospital.
The above mentioned criteria are set for walking distance. For citizen using a vehicle to reach
the facility, the travel time would be much lesser than mentioned above. Furthermore, the
walking speed of a normal citizen depends also upon the topography, road network and
surface type, rivers, streams and the cross drainage structures etc. of the municipality. For the
“Integrated Urban Development Plan” project, the following walking speed has taken for
spatial analysis.
In Terai region, the Walking Speed for a healthy citizen: 1.2 m/s
By feeding the above-mentioned criteria in GIS system and performing the buffer analysis,
the coverage area of the health facility is obtained as show below:
From above analysis, it seems that this municipality is not good at health facilities. Ward nos.
1, 2, 5, 6, 7 and 9 have got the health facilities, ward nos. 3, 4 and 10 are taking accessibilities
from them. however, ward nos. 11, 12, and 13 needs to provide with new health facilities.
Educational facility
For the education facility, maximum walking time and walking speed of the citizen are fed as
criteria for analysis in GIS system.
NREC-MCS-GI JV 38 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Analysis Criteria
Each citizen must not walk more than 30 minutes to reach the nearest school.
Each citizen must not walk more than 45 minutes to reach the nearest college.
The above mentioned criteria are set for walking distance. For citizen using a vehicle to reach
the facility, the travel time would be much lesser than mentioned above. Furthermore, the
walking speed of a normal citizen depends also upon the topography, road network and
surface type, rivers, streams and the cross drainage structures etc. of the municipality. For the
“Integrated Urban Development Plan” project, the following walking speed has taken for
spatial analysis.
In Terai region, the Walking Speed for a healthy citizen: 1.2 m/s
By feeding the above-mentioned criteria in GIS system and performing the buffer analysis,
the coverage area of the education facility is obtained and show below:
From the analysis, this municipality seems good at the education facilities. At least two
colleges need to be establish in this municipality.
Linkage Analysis
One of the important aspects of this IUDP is to grow the municipality with ambitious target
of making it physically, socially, culturally and economically benefited and also making the
municipality sustainable for long run. It also ensures equal opportunity for different sub-areas
NREC-MCS-GI JV 39 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
and different social and age groups. It is well known fact that it is only possible with induced
development plans. It is also necessary to understand that most of the people flowing to the
region are from the nearby wards or from nearby districts. Hence, study of the linkage has
been done with aspect of flow of good and flow of people. Basically, Malpani, Kumroj,
Fulbari Tole, Janachetana Tole, Kapiya, Bairiya, Gauwala, Bairiya and Harnari are the
market center for nearby rural municipalities.
Exchange of goods and services are common amongst the nearby districts or within districts.
Exchange of any of such has direct impact in economic development of the region. Some of
the linkages are explored in two different perspectives as mentioned below:
Inter-regional
Khairahani municipality lies on the closer proximity of Nawalparasi and Makawanpur district
and these region serves as the market center for the municipality. The main touristic site is
Home Stay, Kumrose Madhya community Forest, Dharai botya Lake, Tharu culture museum
and home stay, Kankali Tample in the municipality. These areas are the point of attraction for
tourist and may help in the development and publicity of the area.
There is linkage of goods to nearby municipalities and districts. Most of the important goods
are imported from Kathmandu and distributed to other municipalities and VDCs. Mainly
goods are imported from Bharatpur and Hetauda. The majority of the occupation are related
to agriculture and the agricultural products are also transported to other places.
NREC-MCS-GI JV 40 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 41 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
As we all know, Khairahani is not complete and sustainable on its own. There are still many
things that the town depends upon starting from basic higher education facilities and health
services. The trend of migration from the municipality is seen mostly in Kathmandu and
Bharatpur. Migration of students for higher education is common in the place where as
people also move to other districts for seeking better job opportunities. Growing number of
out migration is also one of the major problem either that be within the nation or out of
nation.
Intra- Regional
Majority of settlement is seen near Malpani, Kumroj, Fulbari Tole, Gauwala and Bairiya.
These areas are in closer proximity with the road network. Places inside the municipality like
Gauwa, Phasera and Sisahani depend on these market for goods and services. Due to the
good provision of roads and highway inside the municipality, there will be easy transport of
goods from the market.
NREC-MCS-GI JV 42 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
In order to make the new settlement free from the risk of land slide the slope of the suitable
site of settlement cannot be more than 300. From the flood risk analysis, we identified high
flood prone zone. The high flood risk zone must be excluded to identify the suitable
settlement area. Furthermore, the area must be out of Environment Sensitive Area and at least
100m far from the existing forest and 50m far from the edge of the river in order to protect
the environment, wild life, aquatic life and biodiversity of the municipality. Elevations above
2000m lies in the temperate, subalpine and alpine climatic zone is considered to be not
suitable for new town development. Hence the area above 2000m is excluded from suitability
analysis for settlement. After running all above mentioned criteria, GIS system identifies the
site suitable for settlement as shown in the map.
From the analysis, about 0.272 sq. km area has been found to be suitable for settlement in
Khairahani municipality.
As per above criteria, the suitable location should locate at ground slope less than 30°, within
the accessibility buffer of 1000m of road network and non-cultivated land use type. It
shouldn’t lie at the zone of settlement (500m buffer zone) and within the 500m buffer zone of
Water body, ESA and Archeological sites of the same municipality.
Thus, the above multi criteria spatial analysis helps to identify the available area of
municipality for best location for construction of landfill site, where all the waste disposal of
municipality should be dumped, recycle and further process. Solid waste collection points are
given at necessary locations near to settlement and road access with service radius of 200m as
per “Planning Norms and Standards 2013, DUDBC”. For Khairahani Municipality, the result
is shown below:
NREC-MCS-GI JV 44 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
From the analysis, about 0.147 sq. km area has been find suitable for landfill site.
A drainage basin is an area that drains water and other substances to a common outlet. Other
common terms for a drainage basin are watershed, basin, catchment, or contributing area.
This area is normally defined as the total area flowing to a given outlet, or pour point. In GIS,
drainage is extracted from DEM by using Arc Hydro tools. The drainage map of the
municipality is shown in the figure below.
From the analysis, total length of drainage in Khairahani municipality is about 119.52 km.
Watershed Analysis
A watershed is the upslope area that contributes flow, generally water, to a common outlet as
concentrated drainage in order to make a big river, streams, and Lakes. It can be part of a
larger watershed and can also contain smaller watersheds, called sub-basins. The boundaries
between watersheds are termed drainage divides. The outlet, or pour point, is the point on the
NREC-MCS-GI JV 45 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
surface at which water flows out of an area. It is the lowest point along the boundary of a
watershed. Important things to be noted is “Wherever we are, we are in watershed”
Watersheds can be delineated from a DEM (Digital Elevation Model) by computing the flow
direction and using it in the Watershed tool. In this Project, we acquired the watershed data
from the Department of Forest and Soil Conservation (DoFSC). The Watershed Map of the
Khaireni municipality is given on map shown below.
Network analysis becomes easier when there is interaction between databases and maps. For
the “Integrated Urban Development Plan”, wastewater from private households and
industries is connected to sewerage network lines which is collected in Sewerage Collection
Route and is finally transported to wastewater treatment plant. Sewer alignment is done by
taking into consideration the route selection, horizontal alignment and vertical alignment.
Horizontal alignment is determined in consideration of most economic alignment along-with
suitable contour differences whereas in vertical alignment first priority is given to gravity
NREC-MCS-GI JV 46 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
flow considering of terrain gradient. Outlets are given at necessary locations/ junctions of
“Sewerage Network Lines” and “Sewerage Collection Route” for proper periodic
maintenance. GIS finds application in sewer network design and analysis processes including
in delineation of watersheds, estimation of precipitation, flow direction, determination of
service area, selection of best route and treatment plant. The suitable location of wastewater
treatment plant is identified, so that the final treated wastewater could be disposed to stream
flow or irrigation purpose. For Khairahani Municipality, the map is shown below:
Ward no. Low Flood (Ha) High Flood (Ha) Total Flood (Ha)
1 78.3 5.04 83.34
2 186.66 0.63 187.29
3 433.44 16.47 449.91
4 121.86 2.25 124.11
5 116.19 0.45 116.64
6 138.33 1.62 139.95
7 181.53 2.52 184.05
8 61.2 14.94 76.14
9 205.02 1.26 206.28
10 594.99 3.96 598.95
11 25.92 0 25.92
12 131.67 0.99 132.66
13 72.09 0.27 72.36
Total 2347.2 50.4 2397.6
region. There are various factors that cause the drought. The criteria that was used to
determine the drought susceptibility is given on table below.
Table 10: Criteria for Drought Susceptibility Analysis
In Khairahani municipality, there high risk of forest fire possibility is in the south-east area of
ward no. 11, boundary area joining of ward nos. 2, 3 and 4.
These are the streams that flow into and "feed" larger streams but do not normally have any
water flowing into them. In addition, first and second order streams generally form on steep
slopes and flow quickly until they slow down and meet the next order waterway. First
through third order streams are also called headwater streams and constitute any waterways
in the upper reaches of the watershed.
Streams Order gives the idea behind the River Continuum Concept, a model used to
determine the number and types of organisms present in a stream of a given order. In GIS
Steam order is derived from Digital Elevation Model with the Flow Accumulation and Flow
Direction raster that are used to create a stream network by applying a threshold values with a
high accumulated flow. The Stream order map of Khairahani municipality is as follows:
NREC-MCS-GI JV 51 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Buffer Analysis
Buffer analysis is the process of identifying the area of influence of a Geographical
phenomenon in it longitudinal, lateral or both directions. The buffer tool of GIS can be used
to identify the coverage area of influence of point or line or polygon feature.
Forest Area
In Nepal, there are 37 forest types according to the Dobremez (1972). Distribution of each of
the forest types are governed by the Bioclimatic zonation, Geographic locations,
Physiognomy and structural parameters, and Floristic parameters. The GIS data of the Forest
types was obtained from the Forest Research and Training Centre, Babarmahal. The data is
acquired from the Lidar image processing with having high accuracy. In Khairahani
municipality, there are 20 % of the total area is covered by the forest.
Water Body
Buffer of water body, especially river that was digitized from the high-resolution satellite
imagery was conducted for proximity or buffer analysis. This Buffer was done in order to
know the distance from the center of the river to its surrounding areas for knowing the
potential flood prone areas. Generally, distance from the river line to another 200m of its
surrounding side are regarded to be as most vulnerable zone that are highly susceptible to
flood while it was also noted that next 100m to 300m after 200m could also be damaged by
the flood that depends upon the intensity and nature of the flood which differs in
physiography of the areas. The buffering area of rivers in Khairahani municipality is given on
map:
NREC-MCS-GI JV 52 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road Network
The transportation system of any municipality of Nepal is largely dependent upon the road
network. In order to set the priority for maintenance and upgrading of the transportation
network, the municipality must classify the road sections depending upon different criteria.
One major criteria for the classification of the road would be the number people, who are
being served by the road daily and directly. The people living adjacent to the road use the
road most, in their daily life. Geographic information system can be used to compute the
number of persons directly and daily using that particular road.
Road networks within a municipality are designed and constructed to connect the settlements,
the market places and infrastructures within the municipality to serve the overall population.
The analysis is based on that population served by minor roads finally incorporate by its
connected major road for the daily movement of peoples and goods. The thick road network
indicates the highly served road connected to major settlements. Gradually decrease thickness
of road network indicate lesser population served road. From the analysis, it is found that
highway, feeder road, district road and Class-A roads are highly population served roads.
NREC-MCS-GI JV 53 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
By buffering the centerline of the road, counting the number of households lying within the
buffer area and multiplying the number of house hold by population rate per house hold, the
number of people being directly served by the road can be computed. After computing the
number of population served by each road, the roads can be classified and delineated in the
map. For Khairahani Municipality, the result is shown below:
Table 13: Population Served by Roads
Road
Road House Population
S.N Name Length
Class Hold Nos. Served
(km)
1 Purano Parsa- Shanti Bajar A 3.357 4743 21533
2 Janaha chowk- Janakpur road A 6.574 1575 7150
Kapaiya-Badegau-Surtana-
3 Aadarsha tole A 5.979 4780 21701
District
Kathar-Shanti Bajar
4 Road 3.124 6448 29274
Bindabhasini chowk- Lekali
5 Chowk A 6.407 2011 9130
6 Siurenitole-Jyamire- Hajipur A 3.390 2575 11690
7 Khairahani- Majhui A 2.235 1923 8730
Bolrahani- Karaiya chowk-
8 Bipard Chowk A 2.315 2425 11010
Lhanepani chowk- Time pass
9 Chowk-Singapur Chowk A 8.356 5872 26659
10 Tungara- Dudhkoshi Khola A 2.865 903 4100
11 Chaubiskot Chowk- Beni Chowk A 3.466 3808 17288
12 Janakauli-Mahabir tole B 1.049 948 4304
Siyani chowk-Bhagwan-
13 Simaltadi chowk A 2.793 872 3959
14 Simltadi chwok road B 1.608 485 2202
15 Janakpost - Shivalaya Chowk B 1.637 542 2461
Janakpur-Peepal chowk- Sanpur
16 Chowk B 2.065 555 2520
17 Ghogharela-Magara Chowl B 1.124 617 2801
18 Kumartha-Milan chowk B 1.849 1349 6124
19 Tara chowk-Kushana B 4.522 3173 14405
Kathar-Tribeni chowk-Tara
20 chowk B 2.558 2035 9239
21 Kadel gaun road B 1.164 1188 5394
22 Hospital chowk-Badegaun B 2.694 1088 4940
23 Sundi-Pidrahanu B 3.290 1907 8658
24 Gaida-Kathar B 0.605 462 2097
25 Phapenigaun- Shantibazzar B 2.685 1437 6524
26 Sultana chowk-Baglunga B 1.370 1325 6016
27 Simaltadi road B 0.380 248 1126
NREC-MCS-GI JV 54 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road
Road House Population
S.N Name Length
Class Hold Nos. Served
(km)
28 Siddha chowk road B 1.308 940 4268
29 Surtana - Sulauli road B 1.664 1499 6805
30 Sundarbasti- Phaserni B 2.471 1710 7763
31 Phaseni Road B 0.402 380 1725
32 Chainpur-Siureni tole B 1.336 1036 4703
33 Tarkari chowk A 0.715 683 3101
34 Jyamire road B 1.743 2467 11200
35 Jyamire- Kashi gaun B 1.332 1378 6256
36 Kunaghari-Patihani B 3.712 1435 6515
37 Patihani road B 1.068 804 3650
38 Lekali chowk-Pun tole B 0.866 630 2860
39 Shavalaya chowk road B 1.031 867 3936
40 Chainpur road B 1.094 512 2324
Bindabhasini chowk- Loktrantik
41 chowk B 1.135 1126 5112
42 Time pass chowk- Phurba Chowk B 2.713 1614 7328
43 Muktinath chowk - Dada Gaun B 1.863 844 3832
44 Khaireni- Basyauli B 1.282 908 4122
45 Garda road B 0.999 864 3923
46 Kapiya- Muglin- Kumroj B 2.255 1151 5226
Highwa
Belsi-Simaltadi
47 y 7.076 12372 56169
48 Milan Chowk Road A 1.120 1269 5761
District
Kumroj- Salauli-Khairahani
49 Road 5.484 10981 49854
Harnaire-Bairiya-Dharampur-
50 Shivalaya Chowk A 4.017 2227 10111
51 Jahanachowk road C 0.722 1174 5330
52 Kumroj- Haranaire C 0.808 865 3927
53 Simreni-Harnaire C 1.754 1404 6374
54 Kumroj- Simreli C 1.133 594 2697
55 Simreni road C 0.515 371 1684
56 Janakpur- Kumroj C 0.810 378 1716
57 Harnaire road C 1.012 562 2551
58 Kumroj-Sisahani connecting road C 1.050 276 1253
59 Kapaiya- Simalghari C 2.390 1067 4844
60 Raj tole- Trinetra Chowk A 0.870 866 3932
61 Gauwa-Amrita Khola C 1.962 930 4222
62 Salauli-Garde C 1.550 702 3187
63 Japkauli- Phacorni C 1.884 1296 5884
NREC-MCS-GI JV 55 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road
Road House Population
S.N Name Length
Class Hold Nos. Served
(km)
64 Jyamire chowk road C 1.178 1831 8313
Jyamire- Siurenitol connecting
65 road C 0.801 1248 5666
66 Belsi toad C 0.794 1088 4940
67 Jyamire-Bahira road C 1.106 1332 6047
68 Urban Road C 0.952 1057 4799
69 Chainpur road C 0.760 494 2243
70 Urban Road C 1.027 818 3714
71 Chainpur-Ratomate C 0.776 726 3296
72 Ratomaate- Kunaghari C 1.537 1006 4567
73 Urban Road C 1.045 375 1702
74 Ratamata- Chainpur C 0.799 506 2297
75 Urban Road C 0.827 870 3950
76 Chiuntole road C 1.183 933 4236
77 Urban Road C 0.337 512 2324
78 Urban Road C 0.386 368 1671
79 Urban Road C 0.817 541 2456
80 Urban Road C 1.010 651 2956
Dudhkoshi khola to municipal
81 boundary C 2.060 673 3055
82 Ramkhola- CHainpur road C 0.766 2121 9629
83 Lodre- Ramkhola C 0.715 1311 5952
84 Naya parsa- Basyauli road C 2.822 2313 10501
85 Urban Road C 1.988 1177 5344
86 Urban Road C 1.293 1175 5334
87 Urban Road C 3.355 778 3532
88 Kathar-Kushana road C 1.344 1322 6002
89 Khadkhutte-Kathar C 1.282 1926 8744
90 Jivanpur-Kadelgaun C 1.859 1293 5870
91 Gaida-Khadkhutte C 1.390 963 4372
92 Urban Road C 1.415 1526 6928
93 Urban Road C 1.047 1045 4744
Simalghari-Shantibazzar
94 connecting road C 1.289 702 3187
95 Hajipur- Sundarbajar A 1.063 1571 7132
District
Khairahani- Parsa
96 Road 1.128 9383 42599
District
Ramkhola-Chainpur
97 Road 2.459 4675 21224
98 Chainpur road A 1.164 681 3092
NREC-MCS-GI JV 56 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road
Road House Population
S.N Name Length
Class Hold Nos. Served
(km)
99 Rai Chowk Road A 0.543 736 3341
100 Shivalaya Chowk- Rai Chowk A 1.314 931 4227
101 Milanchowk-Kathar B 2.686 2451 11128
NREC-MCS-GI JV 57 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
settlement and road network. Existing Market Center in Khairahani Municipality is shown in
the map.
4.3.1 Education
In every community, education plays a vital role as fundamental forces of the social
restructuring. The degree of education in a community indicates the standard of living. It is
also an instrument of change. More than 90% people are literate whereas 3.81% people can
only read and more than 5.7% of the people are illiterate who cannot read and write. Out of
total male, 79.6% are literate and 17.5 % are illiterate. Similarly, out of total female about
65% are literate.
In Khairahani municipality it is found that maximum no. of 6, 5 & 5 at ward no. 8, 3 & 11
respectively. There are 35 primary school, 4 higher secondary school & 3 graduate / post
graduate colleges.
4.3.2 Health
Health is social, physical, mental, physiological and psychological well-being of people. It is
known as fundamental thing for human life. However, education and awareness are
prerequisite for this purpose. It requires more government investment for health
infrastructure. There are six health posts and a number of private hospitals. People from all
wards can visit health post with half an hour but they need more time to reach the hospital for
NREC-MCS-GI JV 58 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
the treatment. People first visit health post for health problem. People also visit traditional
healer and health volunteers.
There are 3 government health post at ward no 2, 6 & 10, 1 government khop Kendra at ward
no. 11, 1 private health post at ward no. 12, 15 private health clinic/ medical hall & 1 mental
hospital at ward no. 11.
4.3.3 Recreation
There are various places on the municipality for recreation. There are groups such as Panche
Baja Samuha, Bhajan Samuha for musical entertainment. Similarly, the physical
infrastructure such as view tower, various trekking routs, Chautari are also regarded as
recreation places. Hill side, typical royal palaces, temples, church, caves, water fall and old care
center Greenery forest land.
4.3.4 Inclusion
Khairahani municipality has a mixed type of caste/ethnic composition, as also discussed in
the earlier section of settlement pattern. Virtually, it represents the colorful social structure of
caste and ethnicity, including Khas-Aryas and the Mongolians. The presence of Tharu
community is common in most of the wards, indicating occupational diversity and
heterogeneous community.
Politically Khairahani is a mixed type of political representation. In the elections held for
local levels in 2017. The following representatives are elected from different political parties
in the municipality. The name of the leaders, their designation and contact number has been
presented in the Table below.
NREC-MCS-GI JV 59 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
(Source: http://Khairahanimun.gov.np/)
The dominance of Bharaman and Chettri is found in the local level representatives in the
municipality. In terms of inclusion, the representation of Janajati such as Gurung and Newar
are found in very negligible number.
4.4 Economic Analysis
4.4.1 Agriculture
Agriculture is the main occupation and major source of livelihood in the municipality. The
agriculture system is subsistence and traditional. Commercialization in agriculture is
essential. Attraction towards agriculture has been decreasing day by day. The major crops in
Khairahani municipality comprises of paddy, wheat, maize, millet, sesame, mustard for
livelihood and gram, red lentils, lemon, cauliflower, cabbage, daikon, potato, ginger,
turmeric, lemon, pear for livelihood as well as commercial use. Organic farming is practiced
for ginger, turmeric, lemon, pear, banana, amilo and other fruits, etc.
4.4.2 Livestock
Along with the agricultural activities, recent trend in the municipality is seen as the
commercialization of livestock farming for the income generation and promotion of the
livelihood Buffalo, cow, chicken, goat, pig and fish are the major animal pocket areas of the
municipality. The farms have also been developed as the animal pocket center that Buffalo,
goat, pig, chicken and bee are the major animal pocket areas of this municipality
4.4.3 Mining
The minerals in the municipality is yet to be explored however the extraction of sand stone
and pebble are done from are Vyakur Khola, Laxmi Khola, Chanda Khola, Pampha Khola,
Budhi Rapti Khola, Chatri Khola, Chisapani Khola, Umraha Khola, Dhunga Khola, etc.
4.4.4 Industry
In Khairahani there are number of small, medium scale and cottage industries. Rice mill,
furniture and grill are major industries. Therefore, they are generating some employment
opportunities for local as well as for rural people. The necessary raw materials for furniture
and factories are found from same municipality and from other neighboring town areas. The
furniture industry makes tables, chairs, beds, cupboard, etc. Among them, furniture factory
and rice mills are very important in generating employment opportunities for local people.
Brick factory, poultry, food, sand and stone and gas factories are growing day by day.
NREC-MCS-GI JV 60 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
4.4.6 Commercial
The main market areas of the municipality include Malpani, Kumroj, Fulbari Tole,
Janachetana Tole, Kapiya, Bairiya, Gauwala, Bairiya and Harnari. Khairahani has different
kinds of financial organizations, which mainly include saving groups, co-operatives, Dairy
Firms, remittance exchange firms and banks of different categories. People are engage in
animal rearing and agriculture in this municipality. Due to availability of local market, these
goods are produced for the purpose of sale as well but all the people do not have larger area
of land for commercial cultivation of crops and animal rearing. Poultry farming and dairy
farming are also growing day by day due to extension of both market and transportation
access in this municipality.
4.5 Financial Analysis
The table shows the projected Revenue for 15 years generated from both external and internal
sources of Khairahani municipality shown in thousand rupee figure .It shows the total
revenue from different sources in FY 2018/19 is Rs. 401027 and the projected revenue for
next five year , ten year and fifteen year is projected as Rs. 442766, Rs.488850 and
Rs.539730 respectively.
NREC-MCS-GI JV 61 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 62 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
The inability on the part of municipality to spend development budget directly affects the
development and construction activities in the municipality which in turn affects the
provision of municipal services and facilities to its citizens. In other words, the low level of
expenditure for infrastructure and other development works means longer period for the
completion of development works which will directly lead to longer period in the provision
of services and facilities. This indicates that there is an urgent need to enhance the capacity
of municipal staff in order to increase their capacities to spend the allocated development
budget every year to avoid delay in the completion of the development projects and
programs.
Opportunities
Wider connectivity along with the various link roads
Market exposed to different areas and urban centers including Narayanghat,
Mungling, Butwal, Pokhara, and Kathmandu
Recently elected local government and representatives despite a huge turmoil of
vacant local bodies since 2002 to 2017
Public hearing, participatory planning, and platform of grassroots democracy
NREC-MCS-GI JV 63 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Challenges
Current local governance legislation is prescriptive in nature. Many communities feel
constrained by these specific requirements. Others feel that if an issue isn’t expressly
identified in law, they cannot take action. A balanced approach will be required going
forward
Institutional problems related to capacity building, offices infrastructures.
Lack of urban scale health institutions with basic facilities including maternity
services and other emergency services.
In many smaller rural areas, the population is declining as residents are moving to
more urban areas. This reduces the amount of property taxes collected, resulting in
less revenue coming in to support the delivery of services to the community
Lack of sufficient appointment of technical manpower in education and up-gradation
of existing infrastructure of existing schools and community schools.
SWOT Analysis
Weaknesses Threats
Internal forces
NREC-MCS-GI JV 64 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Internal factors of SWOT analysis consists two factors i.e. strength and weakness. Strength is
its positive factors while weakness is negative.
4.7.1 Strengths
The following table shows the strength of the Khairahani municipality:
Table 17: Strength Analysis of Khairahani Municipality
Indicator Strength
Transportation is good with the availability of 24 black-topped roads
Mahendra Highway passes through the municipality
Improving awareness among people about construction of earthquake resistance
building
Construction of bridge in most of the rivers and yearly irrigation in 9 nos. of
Physical
Infrastructure wards
Access to communication facility
Facility of NTC, NCELL for telecommunication are available
96.6% households have access to electricity
Available of cremation place
NREC-MCS-GI JV 65 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicator Strength
Emphasis for agriculture, fish farming, vegetable farming, poultry farming, bee
farming, dairy and horticulture by the municipality
Practice of agroforestry in municipality
Plantation of rice and wheat on irrigated land, cereals, mustard, banana and cash
crops on un-irrigated land
Crops like paddy, wheat, maize, millet, sesame, mustard are planted for
Livestock livelihood
Red lentils, lemon, cauliflower, cabbage, daikon, potato, ginger, turmeric and
pear are also planted for livelihood
Buffalo, cow, chicken, goat, pig, fish are considered pocket areas
Organic farming like ginger, turmeric, lemon, pear, banana and amilo are
planted
Availability of Rampur agriculture college
4.7.2 Weaknesses
The weakness of Khairahani municipality are presented in the table below:
Table 18: Weakness Analysis of Khairahani Municipality
Indicator Weakness
Having numerous low grad roads i.e. 58 gravel road and 20 earthen road
Unmanaged municipality notice on stopping the construction
Physical 45% of households does not have proper water facilities
Infrastructure No rain water harvesting except ward 12
Limited access to internet
Lack of conference hall, museum, old age home, exhibition centres, modern
NREC-MCS-GI JV 66 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicator Weakness
sport centres
Lack of water treatment plant for drinking purpose
Haphazard settlement growth
Poor by-laws implementation & very few earthquake resistance buildings
NREC-MCS-GI JV 67 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicator Weakness
Encroachment of historical property for development has reduced cultural sites
External forces
External factors of SWOT analysis consists two factors i.e. opportunity and threats.
Opportunity is its positive factors while threat is negative.
4.7.3 Opportunities
The following table shows the opportunities of Khairahani municipality:
Table 19: Opportunities Analysis of Khairahani Municipality
Indicator Opportunity
Upgradation of existing gravel & earthen roads
Development of infrastructures like bridges, homestays, and hotels
Physical Construction of underground drinking water
Infrastructure Development of pedestrian friendly roads and cycle tracks
Opportunity for industries establishment & its empowerment
NREC-MCS-GI JV 68 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicator Opportunity
Development of local and community parks
Maintenance of trekking routes
Promoting agro-tourism
Governance Power and authority of local governance to take decisions at local level;
System Allocation of financial budgets as per the vision of municipality.
(Source: Induction Workshop, PRA/FGD, 2018)
4.7.4 Threats
The threats of Khairahani municipality are presented below:
Table 20: Threats Analysis of Khairahani Municipality
Indicator Threat
Chances of accident is high on earthen roads and earthen roads are vulnerable
Physical during rainy season
Infrastructure Degradation of green areas due to haphazard construction
Complex structuring of new system may create chaos and confusions among
general people and administrative authority.
Governance
System Lack of will and commitment may undermine development potential of the
municipality.
NREC-MCS-GI JV 69 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
GAP Analysis
Gap analysis is one of the important tools for urban planning and analysis. It consists of all
the appropriate concepts and standards by making objectives, identifying lead sectors and
setting vision to achieve the goal for integral development. As there has been re-structuring
of the local levels in 2017 as per the Constitution of Nepal, there occurs vast gap between
existing conditions and desired outcomes in the municipalities. Desired outcomes are the
required infrastructures and services which are also defined by Planning Norms and
Standard 2013 on the basis of population size, space requirement, road types, etc. To fulfill
the desired outcomes, there needs analysis of gap between existing condition and proposed
items, which is known by “Gap Analysis” in short. The Gap analysis of the Khairahani
municipality is presented below:
NREC-MCS-GI JV 71 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
2 Water Supply 80% household have metered Quantity: 80-100 lpcd Tap/Pipe water is the main source of drinking Tap water facility
System house connection and Minimum diameter of water in each household
distribution distribution pipe: No tap water facility for each households Treatment Plant
Treatment Plant (lab, dosing 80mm There are different sources of drinking water Rain water
and guardhouse) with storage 10 X 106 l = 10 MLD supply tube well, covered well, uncovered well harvesting system
facility: Reservoir (24hrs (capacity) etc. in all wards
requirement) Storage Capacity: Drinking water purification facility in some Sufficient drinking
Provision of Rain Water 25% of the total wards water purification
Harvesting in Public Buildings treatment capacity There is no rain water harvesting except ward 12 facility
(Catchment area, Storage and
NREC-MCS-GI JV 72 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Treatment Facility)
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
Sanitation / Sewerage Public sewer Min diameter of trunk line: 200mm Proper drain
system system (septic Poor Sanitation facility
Storm Water tanks) No proper drain facility Proper
Drainage system Sewage 0.2 hectare/MLD – 0.75 Hectare/MLD No proper sewerage system Sewerage
Pumping Station system
3 7 outlets
Treatment plant 1/2000 passer-by at a distance of 2 Waste
500m Treatment
Plant
Provision of Provision of
public latrines public toilets
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
4 Integrated Solid Collection Point Separation of waste at household level Major techniques of waste
Waste Management (0.3 management are damping, Community
System kg/person/day) Community collection/ Door to Door burning, recycle, tractate and collection
collection. decompose 4 transfer &
Total waste = But lack of sufficient dumping recycle
Around 33 1 collection point/container/ roadside site station
tons/day pickup point serves a radius of 200m Irregularity of vehicle to collect 1 landfill
waste site
1 Transfer Station for 1 city if the final Lack of proper landfill
Transfer Station disposal is at distance of more than 10 km Less consciousness of people
about waste
Only 30% of the total waste generated Lack of proper no. of landfill site
Sanitary Landfill should go to landfill site. 70% = reduce, Lack of transfer station
Site reuse, recycle Sanitary Landfill Site:
NREC-MCS-GI JV 73 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Primary 1 per 20000 3 Health post (Governmental) in Existing Gap: 10 health post (at
Health Care populations (5- 15 ward 2, 6 & 10 (ward wise) ward 1, 3, 4, 5, 7, 8, 9, 11, 12 &
beds) 1 Government Khop Centre -11 13), 3 Primary Health care centre
Centre 1 Private health post -12 (5-15 beds) and 1 Centre District
District 1 per 50000 15 Private health clinic/medical Hospital (25-50 beds)
8 Health Institution Hospital population (25 – hall Projected Gap: 10 health post
50 beds) 1 Mental Hospital -11 (at ward 1, 3, 4, 5, 7, 8, 9, 11, 12
& 13), 4 Primary Health care
centre (5-15 beds) and 2 Centre
District Hospital (25-50 beds)
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
13 Museum/Art Gallery City Level 1/1 ( City level) Lack of museum 1 museum (City level)
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
Security Police Post 1 per 10,000 populations (Police Police force available Existing Gap: 6 police post, 2
Post) police station
15 Police Station 1 per 40,000 population (Police Projected Gap: 9 police post
Station) & 2 police station
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
18 Sport complex City level (football 1 per 50000 populations Kodhar Sport Area-10 Existing Gap: 1 city level
ground, volley ball, (City level) Jivanpur Chaur-10 sports centre and 1 district
swimming pool etc.) Badhgau Chaur -10 sport centre
1 per 100000 population Lack of modern sport centres Projected Gap: 2 city level
District Sports (District Sport Centre) sports centre and 1 district
Centre sport centre
S.N
Infrastructure Norms Standards Existing Scenario Gap
.
19 Movie Hall City and local 5 seats per 1000 population Existing Gap: 2 Movie Hall (160
NREC-MCS-GI JV 77 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
S.N Existing
Infrastructure Norms Standards Gap
. Scenario
Intra City Bus Terminal 1 parking lot for 100 buses & 100
(Linking with other cities) trucks (Intra City Bus Terminal)
22 Transportation system
Inter City Bus Terminal 1 parking lot for 100 buses (Inter
(within the city) City Bus Terminal)
Agriculture, Tourism, Health and Education and Industry are the major sector to be considered for the overall development of the municipality.
All these sectors should be given priority while formulating and implementing different kinds of development plans. On the basis of above-
mentioned lead sectors, vision setting of the municipality has been done with the consultation of municipal authorities, people representatives
and concerned stakeholders.
NREC-MCS-GI JV 79 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 80 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Construction of 15 bedded
25 15.2 11 24.2 75.4
hospital
Construction of ring road and
25 16.3 14 17.75 73.05
parking
NREC-MCS-GI JV 81 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Total 302699150.74
NREC-MCS-GI JV 82 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Total 390981102.98
DED-3: Road
The municipality recommends to construct the road as DED3 connecting from Jiwanpur –
Siddhartha Chowk-10, Kathar-10 to Barpipal Chowk) Khairini Municipality. By upgrading
the road, it will make easy accessibility to receive the municipal services. Further it is
presented in the map and the feature and cost estimation summary is presented below
respectively.
NREC-MCS-GI JV 83 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 84 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Features Description
Urban Road (Jiwanpur – Siddhartha Chowk-10,
Name of the Road Kathar-10 to Barpipal Chowk) Khairini Municipality
Chainage: [0+000 – 4+679.83] KM
Location
Province: 3
District: Chitwan
Municipality / Rural
Khairahani Municipality
Municipality
(Ratomate, Chainpur, Badgaun, Kathar, Simreni,
Major Settlements
Phasera)
Length 4.68 km
Starting Point Jiwanpur
End Point: Kathar
Geographical Features
Terrain Plain
Altitudinal Range m to m
Climate: Sub-tropical
Geology: Boulders, gravel, sand, silt and clay
Unevenly Distributed Precipitation Controlled by
Meteorology:
Monsoon
NREC-MCS-GI JV 85 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Features Description
Design Standard
Standard NRS 2070
Mostly Earthen surface, Partly metallic and gravel
Existing Surface:
surface
Proposed Pavement: Asphalt Pavement
Geometrics
Right of Way: 30 m (15 m on either sides of the Center line)
Formation Width: 10 m
Carriage Way Width: 7m
Shoulder Width: 1.5 m on either side
Maximum Gradient 7%
Minimum Gradient 0.5%
Lane Double
Structures (Qty/No.)
Drainage Structures
a) Side Drain RCC Rectangular Drain
b) Pipe Culvert 7 nos. (900mmdia), and 5 nos.(1200mm dia)
c) Slab Culvert 4 nos (4m span)
d) Causeway
Retaining Structures
a) Stone Masonry
3,611.38 m3
Retaining
Earth Work
Excavation / Cutting 654.75 m3
Embankment / Filling 13,324.12 m3
Pavement
Sub-Base 6,688.64 m3
Base 5,016.48 m3
Pavement Surface
Asphalt 50 mm
Cost Estimate (NRs)
Base Cost 355,556,293.60
(A+B+C+D+E+F+G+H)
Contingency @ 4% of Base 14,222,251.74
Cost
Price adjustment Contingency 35,555,629.35
@ 10% of Base Cost
Physical Contingency @ 10% 35,555,629.35
of Base cost
Total 440,889,804.04
VAT @ 13& of Total 57,315,674.53
Grand Total Cost 498,205,478.56
Cost Per Km of the road 106,458,029.15
NREC-MCS-GI JV 86 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
6.1 Introduction
The Sectoral Development Plans provide strategic directions of the sectors over their plan
period. They are consistent with the long term national development goals and objectives.
These plans help for the overall development of the municipality for short and long term.
6.2 Physical Development Plan
The long-term physical development plan aims to improve the urban physical amenities of
the Khairahani municipality. Physical Strategic Plans are prepared with the help of
national/municipal goals, various planning guidelines including National Urban Development
Strategy, planning norms & standards etc.
7 Elevation <2000m
Considering the road and settlements, residential and commercial area are proposed for the
easy accessibility and living standard of people. Those areas which carry importance from
touristic point of view, are also declared as the tourism zone. For the proper selection of site
for settlement and commercial area, certain indicators were considered i.e. slope, flood,
landslide, environment sensitive area, forest. River and elevation.
NREC-MCS-GI JV 87 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Map below shows the proposed land use map of Khairahani according to the site selection
map as discussed earlier. Residential, commercial, potential tourism area are proposed which
helps in the future planning.
Equitable, safe, adequate and affordable water supply facility to each households and
institutions and for municipal purpose
Sustainable water supply measures
Strategy:
Hence, to attend these objectives and goals, proper necessary activities have been
approached. The strategic vision of the water supply should be guided by safe, affordable and
NREC-MCS-GI JV 90 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
accessible water supply to all, as in the matter we should also be aware about the sustainable
need of water supply plans and conservation of the water sources.
Table 29: Logical Framework Approach(LFA) of water supply
Indicators Of Means Of
Descriptions Assumptions
Achievement Verifications
Report from Approval and
Safe, reliable and
DCC/Municipa implementatio
To provide clean affordable water
l office, DWSS, n of IUDP
Goals and safe water in supply
DWSSO and Availability of
adequate quantities Water supply
CBO’s, Self- water supply in
facility to all HH
help group, nearby areas
24 hours’ access to Prioritizing
clean hygienic projects and
Increasing water
water supply for Report from budget
availability
every households DCC/Municipa allocation
Reducing
Participation of l office, DWSS, Availability of
Objective incidences of water
individual HH and DWSSO and open space and
s borne diseases
community in rain CBO’s, Self- extensive
Prevention of water
water harvesting help group, public
contamination and
Ease for travellers HDI, I/NGO participation in
pollution
for drinking water rainwater
and washing harvesting
Adequate safe, 1000 (lpcd)
reliable and hygienic water Budget
affordable water supply (18-24 hours allocation and
supply facility per day) Report from project
Rain water Each household DCC/Municipa prioritizations
harvesting provision will have rain water l office, DWSS, Extensive
in HH and harvesting system DWSSO and public
Output community level and community will CBO’s, Self- contribution
Water supply for have water storage help group, and
private, institutional for community HDI, I/NGO, participation
and industrial purpose PRA, FGD, HH Connections of
purpose Public taps installed survey water supply
Public taps for on major junctions from nearby
drinking water and and important source
washing locations
Lab testing for water to determine quality of water (arsenic and purification test)
Promoting rainwater harvesting in household level by subsidizing on money and
technical support.
Adopt water recycling at a large scale through water treatment plant
Activities
Water harvesting directives to be included in planning for all city developments for
rain water to be stored in community and HH level
Public taps installed along necessary junctions
Application of drinking water plan
NREC-MCS-GI JV 91 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
goal of clean, safe and sustainable sanitation program within the reach of every citizen, some
of the focus sectors have been identified.
Objective:
To ensure proper sanitation facilities in each household and institutions.
Strategy:
Management of waste water and sanitation in every household
Strategic Projects:
The flow of waste water (grey water and black water) is along the gradient of the
municipality. It flows along the road network and road networks are connected to the river.
Various outlets are proposed in the municipality for the easy flow of waste water. The water
is collected to the river side and transferred to the waste water treatment plant. In the
municipality, outlets are proposed near Tungara, Jyamire, Simalghari, Sisahani and Gauwa.
Map below shows the flow of waste water and proposed sewerage network in Khairahani,
NREC-MCS-GI JV 92 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
6.3.3 Drainage
Management of drain in Khairahani helps for making the city clean and healthy. The problem
in the municipality is installation of unscientific drain system. For controlling of water to
collect in an area, management of drainage is necessary.
Objective:
Strategy:
Provision of drainage facility in every road side and its treatment for proper reuse
Strategic Projects:
Drainage and sanitation is day to day process, hence needs to have some certain level of
awareness in people. Apart from that there are some important large scale infrastructures
required to control the drainage mechanism for the city including some required treatment
plant. Some of the important projects are identified as:
Indicators Of Means Of
Descriptions Assumptions
Achievement Verifications
Provision of
Report from
sustainable Implementation
Clean, safe and DCC, Municipal
sanitation and of IUDP
Goals affordable, sustainable office, DWSS,
drainage Budget
sanitation RWSSP, NWSC,
system for all allocation
STWSSSP
HH
Efficient and effective All houses and
sewer and drainage institution with Availability of
networks in the city toilet and technology and
Toilet facility in every septic tank skilled
Report from manpower
households and Clean, green
DCC, Municipal
institution equipped and healthy Monitoring by
Objectives office, DWSS,
with septic tank city concerned
RWSSP, NWSC,
Make the city “Open People authority
STWSSSP
Defecation Free Zone” motivated Use of public
To aware people about toward toilets by
healthy sanitation and cleaning their people
drainage system own city
Output Each HH and institution 100% HH with Report from Monitoring by
with toilet and septic proper toilet DCC, Municipal concerned
tank and septic tank office, DWSS, authority
Drainage and sewerage Use of drain RWSSP, NWSC, Budget
lines installed along the water in STWSSSP, allocation
NREC-MCS-GI JV 93 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicators Of Means Of
Descriptions Assumptions
Achievement Verifications
road side of capacity as various
per demand purpose Availability of
Drain water treatment Open technology and
plant installed at the exit defecation free PRA, FGD, HH skilled
of drainage city survey technicians
Easily accessible public No collection Maintenance
toilets in public spaces of rainwater on issue
Storm water drainage road
Waste water treatment plants in ward 13 at south east of Simreni and north of
Gauwa
Construction of public toilet at Parsa Bazar in ward 6 and 8
Construction of drainage network connecting Siddhipur to Jyamire to Shanti
Bazar
Activities
Providing waste water treatment plan for reusing of treated water
Installation of drainage and sewerage pipe along the road side
Installation of water treatment plant before discharging from the outlet
Installations of sewer pipeline network and localize sewer treatment units
Programs on public awareness through radio/TV broadcasting/Publicity
Strategies:
Strategic Projects:
NREC-MCS-GI JV 94 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
For the proper solid waste management plan, collection point is proposed at 200m buffer
from the settlement area so that it will be accessible for people to collect waste at certain
point. These points are proposed around the road surface so that it will be easy for truck to
collect to the transfer station. The site for transfer station and land fill site is selected so that it
is at longer distance from settlement area, river and accessible through road. In the
municipality, area around Simreni is selected as a land fill site. Map below shows the area of
collection point and transfer station in Khairahani municipality,
Map 45: Proposed solid waste collection point and land fill site
6.3.5 Electricity
Electricity is one of the necessity of every individual. With the primary goal or providing,
electricity service to each individual in the town, the electricity plan is prepared. It basically
focused on optimization of resources in distribution of electricity. Target of affordable and
accessible electricity is to be backed up by some objectives as follows.
Objective:
Access of universal and affordable electricity services.
Promotion of alternative energy resources: Solar and wind energy
Strategies:
Strategic Projects:
NREC-MCS-GI JV 96 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
With those basic guidelines mentioned above promoting alternative energy and electrification
of each household with NEA national grid, some of the important strategic projects identified
are:
Map below shows the accessibility of electricity in Khairahani municipality. Almost every
wards of the municipality have access to electricity facility. It seems that forest areas are not
facilitated with electricity. Those areas which are important for tourism should also be
provided access.
Indicators Of Means Of
Descriptions Assumptions
Achievement Verifications
Connecting
national electricity
grid with the micro
hydro development
of Khairahani Availability of
Reports from
municipality and technology and
Exchange of MoIF, Nepal
nearby rural skilled
electricity with electricity
Objectives municipalities technicians
national and local authority (NEA),
Effectiveness of
Access of grids Municipal office,
renewable
universal and etc
sources
affordable
electricity
services.
Quality, affordable
and reliable Surveillance
Solar lighting on
internet and from concerned
roads and public Annual report authority
communication
spaces from Nepal
facility Operation on
Smart grid electricity
Sustainable energy adverse weather
infrastructure authority (NEA),
Output source for public Budget
Incentives for Municipal office
use allocation
renewable energy profile, DCC
Encouragement Availability of
usage profile, PRA,
for public in technology and
Involvement of FGD, HH survey
sharing extra skilled
private sector
generated technicians
electricity
Formulating energy policy for promoting renewable energy sources in public and
private usage
Activities Investing and planning for smart grid electricity infrastructure
Installation of solar lights on roads and other public spaces
Upgrading electricity infrastructure
6.3.6 Telecommunication
With the primary goal of providing communication service to each individual in the town,
target of affordable and accessible communication is to be backed up by some objectives as
follows.
Objective:
Access of universal and affordable communication services.
Techno friendly city development
Strategies:
Encouraging private and public sector to provide and upgrade the quality of internet
and communication services.
Map below shows the accessibility of electricity and telecommunication in Khairahani
municipality. Every settlement in the municipality have access to electricity and
telecommunication facility.
Indicators Of Means Of
Descriptions Assumptions
Achievement Verifications
facility center
Sustainable energy (AEPC), Operation on
renewable energy
source for public use Municipal adverse
usage
Public motivated for office weather
Involvement of
renewable energy profile, DCC Budget
private sector
FM station as the profile, allocation
Promotion of radio
source of Nepal Availability of
stations
entertainment and telecom, FM technology and
Wi-Fi hotspots in stations,
awareness skilled
public spaces PRA, FGD, technicians
Easily accessibility
for public HH survey
Promoting and monitoring FM stations
Encouraging private and public sector to provide and upgrade the quality of
internet and communication services.
Activities Promotion of FM, radio stations and other communication services through
private and community participation.
Wi-Fi hot-spots in the public spaces like bus parks, parks and other urban
squares.
Strategy:
Easy linkage of Khairahani with nearby districts like Nawalparasi and Makawanpur,
etc. with proper provision of pedestrian’s pathways
NREC-MCS-GI JV 100 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 104 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Accessibility Situation
The accessibility seems to be easy in Khairahani due to the presence of major roads. There is
main highway passing through the municipality. Most of the road in the municipality are
Gravel roads, twenty-four roads are black topped and others are earthen roads. Width of the
road in the municipality ranges from 4m to 20m width. These road serves for transporting
within wards and other wards and settlement through vehicles. Other 2m roads are used as
foot trail for travelling between two nearby settlements. Figure below shows the types of
roads and width in Khairahani municipality and it shows the linkage within the settlements.
The name of roads, its width and types are shown in the table below:
Table 35: Road surface type and its width of Khairahani municipality
Road Existing
Existing Road
S.N. Road Joining Settlements Length Width
Surface
(Km) (m)
NREC-MCS-GI JV 105 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road Existing
Existing Road
S.N. Road Joining Settlements Length Width
Surface
(Km) (m)
NREC-MCS-GI JV 106 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road Existing
Existing Road
S.N. Road Joining Settlements Length Width
Surface
(Km) (m)
Road Existing
Existing Road
S.N. Road Joining Settlements Length Width
Surface
(Km) (m)
NREC-MCS-GI JV 108 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Road Existing
Existing Road
S.N. Road Joining Settlements Length Width
Surface
(Km) (m)
Strategy:
NREC-MCS-GI JV 110 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Strategic projects:
NREC-MCS-GI JV 111 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicators Of Means Of
Descriptions Assumptions
Achievement Verifications
6.5.1 Education
There are 39 educational institutions in Khairahani municipality from basic to higher studies.
This number seems adequate in terms of existing growth rate of the population which is a
little bit floating in nature. The areas like Khairahani, Kathar, Chainpur, Parsa, Khumroj, and
Chainpur are more accessible for educational services. Moreover, educational dependency
has been increasing mostly to Chitwan/ Bharatpur, and even to Kathmandu and Pokhara. As
per the National census 2011, the literacy rate remains 74%, which accounts for 81% for the
male and 67% for the female. It could have been increased significantly in 2019. So,
increment in literacy rate does not seem a big problem. Moreover, promotion of quality
higher education with gender equity has been the major challenge for this municipality.
By analyzing this situational gap, the following LFA has been prepared for the development
of educational sector of Khairahani municipality in the long run.
NREC-MCS-GI JV 112 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
6.5.2 Health
There are six health posts/ centers, two medium-scale hospital and 31 private-owned medical
units including clinics, labs and pharmacies, and some governmental vaccination/ birthing
centers in Khairahani. These numbers are insufficient from infrastructural point of view.
However, the adjacent large city of Bharatpur may hold the pressure where many big
hospitals lies, including Bharatpur District Hospital, Chitwan Medical College and B. P.
Koirala Memorial Cancer hospital. The regions of Khairahani, Kathar, Chainpur, Parsa,
Khumroj, and Chainpur have easy access to health facilities. People used to visit Bharatpur
and even to Kathmandu and Indian cities in the extreme condition of treatment. The
population growth trend suggests that there is a pressure in terms of both how to increase in
the number of health services, and how to upgrade the health services. With this context, the
following LFA is proposed for the long term development of health sector in Khairahani
municipality.
NREC-MCS-GI JV 113 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 114 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
2.4 Health awareness program and free % increased to health access health for
health camp every citizens
3 Provision of facilities and infrastructures related to health
Create safe and secure environment for the citizen and participate in
Goals
community development activities
NREC-MCS-GI JV 115 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Create the leisure time of people fruitful, creative and productive with
pleasant environment for the citizen and participate in community
development activities
Celebrate the spirit of heritage and the multiculturalism of community
Increase awareness of the arts, culture and sports
Objectives Provide basic recreational services irrespective of the age, sex,
physical condition and other socio-economic attribute
Mobilize the youth and develop sports to prepare able, strong and
disciplined human resource required in the municipality
Develop a linkage of recreation, sports and tourism for the economic
and multi-sectoral development of the municipality in long-term
Municipal Progress Report & Municipality Profile
Means of
Community debt policy of the municipality
Verification
Provincial report
Assumption Implementation of IUDP; Budget allocation
Monitoring by concerned authority
NREC-MCS-GI JV 116 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 117 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
1.1 Land acquisition for open spaces and Accessed green parks and open spaces
green parks (in need) to all
1.2 Construction of Children/adult parks in Accessed green parks and open spaces
each wards to all
1.3.. Formation of community groups for Increase number and proportion of
managing parks and spaces active public participation
2 Facilitated the municipality having the structures design about amusement &
recreational activities
2.1 Establishment of municipal level Flourishing the traditional art and
museum/Art Gallery cultures
2.2 Establishment of Municipal level Increased status of local market and
exhibition centre entrepreneurship
2.3 Establishment of City hall Increased status of local market and
(Multipurpose hall) entrepreneurship
3 Development of sports and yoga facilities
Formulation and management of ward- % of increase players and spectators,
3.1 wise team for games (Volleyball, including stakeholders
Football, Cricket etc.)
Establishment of youth and sports
3.2 development centre in each wards of the % of increased trained players
municipality
3.3 Establishment of City level Sport
Promoted sport tourism
Complex
3.4 Construction of Play Ground in each
Promoted sport
wards
Establishment of yoga and meditation Enhanced the spiritual growth of the
3.5
centre with registered doctor municipality
NREC-MCS-GI JV 118 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
In Khairahani there are number of small, medium scale and cottage industries. Rice mill,
furniture and grill are major industries. The necessary raw materials for furniture and
factories are found from same municipality and from other neighboring town areas. The
furniture industry makes tables, chairs, beds, cupboard etc. Among them furniture factory and
rice mills are very important to generating employment opportunities for local people. Brick
factory, poultry, food, sand and stone and gas factories are growing day by day. The
remittance from abroad is used in productive enterprises these days have also helped to make
people self-reliant.
The roads of Khairani are graveled and pitched and earthen but in ward no.6 there are mixed
types of road which clarifies that import and export of the industries is not a problem. Being
neighbor with Khairani municipality, a proposed industrial area, will be of a great boon for
the municipality for importing cheaper goods as well as employment opportunities.
NREC-MCS-GI JV 119 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Availability of electricity and telecommunication sector will further aid in this sector.
Linkage to big cities like Kathmandu, Pokhara, Narayangadh, Bharatpur, Tulsi will be good
for the enterprises. Presence of different cooperatives and organizations makes it easy for the
capital arrangement for enterprises.
Open Boarder will make it challenging for the domestic market to sustain it sale and black
marketing of products may result in shutting down of industries as well. As Kalika is a
proposed industrial area, budget of this municipality for industry sector in this municipality
might not be sufficient.
6.6.2 Employment Generation, Poverty Reduction
The poverty of the municipality was reduced from 10% to 4% with the rate of 64% in the
year 2003 to 2011. The data were taken from Small Area Estimates of Poverty 2003 and
2011. Assuming blockade to have directly affected the municipality and earthquake indirectly
in 2015, for 2018, poverty is assumed to be reduced by 38% rate to 2.2%. With the economic
activities continuing accordingly, the rate is assumed to reach 2.1% in 2023, 1% in 2028 and
0.3% in 2033. But this assumption has not considered the fact that remittance has slowly
started to show voluntary unemployment in the country as a whole and this municipality will
not be an exception.
This will be a reality assumed that the activities mentioned in the LFA are run smoothly
along with the assumptions put forward for each indicator are not hindered in any form
throughout the years.
6.6.3 Regional Competiveness of Municipality
Along with the support of local government, Khairani has developed in livestock farming and
slowly specifically developing in bee farming but not enough to compete with other
municipalities in the region. It still has a lot to improve for stopping the import of livestock
goods. Likewise, Kalika is proposed industrial area making Khairani weaker in Trade and
commerce too. With tourist’s sites being recently explored the place is not in travelers’ to
visit site due to presence of touristic area in near proximity like Sauraha, Upardangadi. But
the flow of tourists to its proximity area has helped the small hotels and lodges increase its
revenue.
6.6.4 Agriculture Development
The major crops in Khairahani municipality comprises of paddy, wheat, maize, millet,
sesame, mustard for livelihood and gram, red lentils, lemon, cauliflower, cabbage, daikon,
potato, ginger, turmeric, lemon, pear for livelihood as well as commercial use. Organic
farming is practiced for ginger, turmeric, lemon, pear, banana, amilo and other fruits, etc. In
this municipality, Prime Minister Agricultural Fund has also been allocated. Both organic and
inorganic vegetables are cultivated in different seasons.
Opportunities
With markets being slowly developed, the development can aid the commercialization of
agricultural products which can help the agricultural products its place, identification of
major agricultural products, pocket areas and research on opportunity of organic farming and
NREC-MCS-GI JV 120 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
alternate farming technologies will further improve the quality of food. Due to agricultural
and commercial area, increment in income generation among people and Opportunity for
commercial activities due to the presence of highway is present in the municipality.
Opportunity for agricultural tourism is also visible in the municipality. Sufficient agricultural
land and increasing interest of youth in modern agricultural production are the major
opportunities of this filed.
Challenges
Unplanned plotting of agricultural land and growing trend of urbanization is the major
challenge of the municipality. Insufficient Irrigation system and insufficient electric power
backups has been the hindrance. Irrigation is a primary source for the agriculture to promote
its productivity and commercialization. It is however partly developed in Khairani. Lack of
skill and training among people and unmanaged farming system is big challenge. Increment
in plotting of agricultural land and substituting the traditional agricultural process with
modern one will be a big challenge.
Livestock
Along with the agricultural activities, recent trend in the municipality is seen as the
commercialization of livestock farming for the income generation and promotion of the
livelihood. Buffalo, cow, chicken, goat, pig and fish are the major animal pocket areas of
Khairahani municipality. The farms have been also developed as the animal pocket center
that have Buffalo, goat, pig, chicken and bee are the major animal pocket areas of Khairahani
municipality
Opportunities
Khairani municipality has been serving as the market center for nearby settlements and even
areas like Kathmandu, Pokhara, Narayangadh, Bharatpur, Tulsi. With the advantage of being
in a zone along with Chitwan district. It has got tremendous opportunity to serve as the
commercial town where it can serve as the supply center for nearby settlements and districts.
Due to the good provision of roads and highway inside the municipality, there will be easy
transport of goods from the market.
Challenges
If there’s no modern form of rearing, the livestock products may be expensive and the market
is bound to be filled with higher priced products from the other side of the border or even
from the other municipalities of Nepal. Investment for storage of the livestock product isn’t
much attractive as there’s no extensive livestock assuring the profit to the storage.
6.6.5 Strategic Location of Different Market Centre/Product Collect Centres
In Khairahni municipality, there are six market center which is connected with existing and
proposed road network due to which there is accessibility for people. Those market centers
include Jyamire, Naya Parsa, Purano Parsa, Simaltadi, Kathar and Kumroj. The municipality
has to separate budget to make more market centers especially on the north side of the
municipality for trading on the northen side of the municipality with Khairani which is import
based economy. Following map shows the market area and its linkage with road roads,
NREC-MCS-GI JV 121 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 123 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 124 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Forest Cock, Monkey, Peacock, Leopard, Tiger, Rabbit, Boar, Deer, Monkey, Rhino
etc.
d) Public Service Delivery and Economy:The main market areas of the municipality
include Malpani, Kumroj, FulbariTole, JanachetanaTole, Kapiya, Bairiya, Gauwala,
Bairiya and Harnar. More than 90% people in this municipality are literate. There are
45 educational institutions here. People are getting health services from different
clinics, health posts, medical halls, pharmacies and so on. Agriculture is the major
source of livelihood here followed by foreign employment. People are also engaged in
livestock farming like cow, pig, bee, buffalo, poultry, fish, which have supported the
micro economy. Khairahani has different kinds of financial organizations, which
mainly include saving groups, co-operatives, Dairy Firms, remittance exchange firms,
and banks of different categories
Components Categories
Accessibilities -Availability of air and road transportation
-Trekking routes located in Churia (Siwalik) range to Mahabharat
range
Accommodations -Small hotel, restaurant and tea stall in few numbers
Attractions -Greenery forest land, agriculture and pasture land
-Hill side, river streams, ponds, typical royal palaces, temples, church,
caves, water fall and old care center
-Hinduism and diverse ethnic cultural norms and values
Amenities -Traditional musical instruments Panche Baja and Bhajan Samuha (A
group of people singing a religious song with traditional musical
instruments)
-Religious and cultural feasts and festivals as well as trade fares
Activities -Cultural home-stays of Tharu ethnic groups, organic local food,
sightseeing, trekking and hiking
-Commercial vegetable, fruits, bee honey, fish and dairy products
Actors -Youth club, fathers group, mothers group, cultural groups, saving
groups, government and non-government organizations
Affinities -Mutual understanding among villagers belong to all the religious
groups
Advertisements -Descriptive information through maps and magazines
-Hosts request guests to visit again in the villages
-Networking with tour and travel agents
NREC-MCS-GI JV 125 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
For the conservation of material and non-material cultures, following policy options are
presented below:
Integrated and facilitative infrastructure development in already available and newly
explored touristic sites.
Developing and differentiating the tourism sector and attracting foreign investors as well
as Non Residential Nepali.
Developing local level tourism development and management committee for planning,
implementing and monitoring tourism related projects providing tourism services.
Making arrangement for Tourist Police to advise and assist tourists in safety and security
during traveling, trekking, and other adventurous sports and night staying.
Promotion of sustainable livelihood program linking with tourism by commercialization
of rural products and providing training to them as of such.
Proper marketing of the tourism related services in national and international tourism
market.
Establishment of cultural museum, fun parks, view towers and learning resource centers.
Establishment of research cell for the conservation, culture and tourism development in
the Municipality.
Table 45: Logical Framework Approach (LFA) of Tourism Development
NREC-MCS-GI JV 126 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 127 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 128 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Schedule 8 of the Constitution of Nepal elaborates the sole jurisdiction, powers and functions
of the local government. As per this Schedule, the local government are assigned to collect
wealth tax, house rent tax, land and building registration fee, motor vehicle tax, service
charge, tourism fee, advertisement tax, business tax, land tax (land revenue), penalty, and
entertainment tax. Similarly, the Schedule has also provided 21 expenditure responsibilities
of the local government.
NREC-MCS-GI JV 129 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Infrastructure:
It is estimated that the total budget allocation for Infrastructure sector in FY2018/19 is Rs.
63600.Similarly the projected expenditure required for infrastructure in FY 2019/20, FY
2020/21, FY 2021/22, FY 2022/23 and FY 2023/24 will be Rs. 64872, Rs.66169, Rs.67493,
Rs.68843 and Rs.70220 respectively.
Agriculture:
It is estimated that the total budget allocation for agriculture sector in FY2018/19 is Rs.
12000. Similarly, the projected expenditure required for agriculture in FY 2019/20,
FY2020/21, FY 2021/22, FY 2022/23 and FY 2023/24 will be Rs. 12240, Rs.12485 ,
Rs.12734, Rs 12989 and Rs.13249 respectively.
NREC-MCS-GI JV 130 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 131 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Khairani Municipality lies in Chitwan District in Narayani Zone in Province no.3 of Nepal.
Being a part of Chitwan District, a major tourist destination, the municipality has the
possibility of increasing its tourist by promoting the sites here. Ripple effect of touristic
economy in terms of hospitality and knowledge based economic gain can be seen the place.
The roads of Khairani are graveled and pitched and earthen but in ward no.6 there are mixed
types of road which clarifies that import and export of the industries is not a problem. Being
neighbor with Kalika municipality, a proposed industrial area, will be of a great boon for the
municipality for importing cheaper goods as well as employment opportunities. Availability
of electricity and telecommunication sector will further aid in this sector. Linkage to big
cities like Kathmandu, Pokhara, Narayangadh, Bharatpur, Tulsi will be good for the
enterprises. Presence of different cooperatives and organizations makes it easy for the capital
arrangement for enterprises.
The projected revenue and expenditure of Khairahani municipality suggests that there will
always be always fiscal deficit for next 15 years as per the projection. Khairahani
municipality requires that each year’s budget be balanced. Balancing the budgets will require
a combination of expenditure reduction and/or increment in revenues.
Pollution from urbanization, solid waste refusals and climate change are slowly
deteriorating the municipality. It will be challenging for the municipality to attract
people enough to choose it over any other place related to Chitwan National Park and
Shauraha. Unmanaged solid waste is the biggest challenge to the municipality and its
domestic and foreign tourists.
With only semi-skilled and unskilled population being the majority of working
population, the municipality may have a problem with proper running of the various
large scale industries. Open Boarder will make it challenging for the domestic market
to sustain it sale and black marketing of products may result in shutting down of
industries as well.
lack of modern technologies and skilled manpower are considered as major
challenges for agriculture in this municipality. Unplanned plotting of agricultural land
and growing trend of urbanization is a big challenge for sustainable development
The projected revenue and expenditure of Khairahani municipality suggests that there
will always be always fiscal deficit for next 15 years as per the projection. Therefore,
there is a need to increase the tax base so that the budget gets balanced.
NREC-MCS-GI JV 132 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 133 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 134 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 135 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Water Resources
This municipality endowed with many streams and running water bodies. Vyakur Khola,
Laxmi Khola, Chanda Khola, Pampha Khola, Budhi Rapti Khola, Chatri Khola, Chisapani
Khola, Umraha Khola, Dhunga Khola, etc. are the major streams flowing in the municipality.
Besides there are many rivulets flowing in the area. Drinking water supply and poor
sanitation is the main environmental issue in the municipality. There are different sources of
NREC-MCS-GI JV 136 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
drinking water in Khairahani municipality but tap or pipe water is the main source of
drinking water, however no water purification methods are in practiced in the municipality.
There is 100% pipe water supply in ward no 11, 12 and 13. However, most of the people use
tap water for drinking purpose. Use of unpurified water is the main causative agents for water
borne diseases in the municipality.
NREC-MCS-GI JV 138 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Disaster Management Plan are needed, not only for responding to the impacts of disaster, but
also to maintain the continuity of livelihood of people while managing the crisis, and to guide
recovery and reconstruction effectively. Dealing with disaster in Nepal requires public
support for planning initiatives and participation by a wide variety of responders, technical
NREC-MCS-GI JV 139 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
experts and citizens. It needs to be sustainable in the light of challenges posed by non-
renewable resource utilization, climate change, population growth, and imbalances of wealth.
Flood Risk
The settlement areas located near to the river bank are more prone to flooding and river
cutting. Million tons of soil nutrients are lost annually from agricultural land as a result of
soil erosion and flooding. This has affected large number of households. Flood risk analysis
was done through GIS by analyzing various driving factors of flood, various data including
Normalized Difference Vegetation Index (NDVI), stream order, Slope and elevation data
were used to carry-out geo-spatial analysis to identify the areas prone to flood.
The total area susceptible to flood in the municipality is 2397.6 Ha, out of which 50.4 Ha of
land is found highly susceptible to flood, while remaining 2347.2 Ha of area in the
municipality has low susceptibility towards flood. All the wards are susceptible to flood.
Fire Risk
Khairahani Municipality consists of both communities managed as well as government
managed forests and thus the risk of forest fire as well. Other common uses of fire by farmers
include burning crop residue and converting forest to agricultural land. Because fire removes
the organic matter and provides an ash bed, which facilitates the growth of grasses, local
people set fire to gather ash, which is locally used as manure. The risk of fire is mainly likely
to outbreak during the windy and the dry season e.g. Chaitra & Baisakh. The lack of
equipment and skilled human resources such as trained fire fighters pose serious challenges
in the municipality.
Other Risk
NREC-MCS-GI JV 140 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Loss of cultivated land, grass/grazing and forest land due to river encroachment is a common
problem, while in some parts abandoned by channels or old riverbeds have been brought into
cultivation or reused as grazing areas or used for tree plantations in hazard areas. The river
morphology is unpredictable i.e. increase bank cutting, bifurcation and flooding which one is
common problem and reoccur every year. Regarding this, sand extraction is also common in
some rivers for household purpose causing huge impact on riverine environment such as
destruction of aquatic habitat, flooding, change in river morphology etc. There is
deforestation and habitat degradation in all wards due to construction of rural roads. The big
settlement areas are located near to forest area causing further degradation of forest.
Another major problem in the municipality is drought. Drought is a natural phenomenon that
has drastic implications on human lives, food insecurity and natural resources degradation.
Due to drought peoples are suffering from water shortages affecting agriculture, with social
consequences such as famine, hunger, and migration. Drought risk analysis was done through
GIS by analyzing various driving factors of drought; data including Normalized Difference
Vegetation Index (NDVI) and Normalized Difference Water Index (NDWI) were used to
carry-out geo-spatial analysis to identify the areas prone to drought. In Khairahani
municipality, 926.18 Ha of total area has low risk of drought and all the wards are susceptible
to drought. Wards no 2, 3 and 9 seem to contain larger areas susceptible to drought.
Table 49: Logical framework Approach (LFA) of Disaster Risk Management Plan
Indicators of Means of
Descriptions Assumptions
achievement verifications
Goals
Safe, secured and Safe building Report from MoUD, Approval and
resilient urban construction MoHA, DWIDP implementation
people and areas practices (Water induced of IUDP
Emergency disaster), Daibi Effectiveness of
response team Prakop Uddar local
and evacuation Samiti, District government and
zones within Administration active
the reach of Office, Department community
community of Soil Conservation participation
(DoSC), Department
of Hydrology and
NREC-MCS-GI JV 141 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicators of Means of
Descriptions Assumptions
achievement verifications
Meteorology
(DoHM) and Reports
of I/NGOs
Participatory
Evidence based
approach of
Report from MoUD, planning with
Focus on reducing disaster risk
MoHA, DWIDP information
loss caused by reduction and
(Water induced regarding
flood, river cutting mitigation plan
disaster), Daibi disaster history
and drought Local people
Prakop Uddar and possibilities
Prepare well educated
Samiti, District Availability of
communities about dealing
Administration skilled
Objectives against disasters with disasters
Office, Department manpower to
through capacity Open spaces of Soil Conservation train others
building and and disaster (DoSC), Department Availability of
awareness evacuation of Hydrology and evacuation
Establish disaster zones within Meteorology areas, safe
resilient the (DoHM) and Reports shelters and
infrastructure neighbourhood of I/NGOs water source for
fire station
Safe
infrastructure
and ultimately
reduced loss of
Conservation Budget
property
structures Report from MoUD, allocation and
Prepared
including bio MoHA, DWIDP project
hazard maps
engineering (Water induced prioritizations
and use in land
measures used in disaster), Daibi Effectiveness of
use plans
disaster risk areas Prakop Uddar local
Implementation
Plan of action to Samiti, District government
of RSLUP
cope with flood, Administration Community
Reduced loss
Output river cutting and Office, Department involvement
due to disasters
drought. of Soil Conservation and local
Identified open 100% easy and (DoSC), Department government
spaces and disaster timely access of Hydrology and Willingness and
to designated Meteorology
evacuation zones participation of
in each emergency area (DoHM) and Reports public
in case of of I/NGOs, PRA,
neighbourhoods
disaster
Safe building code FGD, HH survey
Effective
implementation
integration of
byelaws in
building
practices
Indicators of Means of
Descriptions Assumptions
achievement verifications
retaining walls, breast walls to control flood, river cutting, other forms of erosion
and flood
Afforestation in the bare lands
Preparation of plan of action in case of disaster emergencies
Establish mechanism of EWS (Early Warning System) in major hazards
NREC-MCS-GI JV 143 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 144 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
watershed management and security of existing water sources should be prime objective of
the municipality to adapt and minimize the impacts of climate change.
Human health
The socioeconomic costs of health problems caused by climate change are considerable. The
government is financially unable to provide required health services particularly in the rural
areas, but on the other hand effects of climate change are bringing new health issues with it.
Health problems which were previously not seen are effecting the area. Many of the common
health issues are largely related to the climatic situations of the area such as diarrhea, malaria
etc. These issues if not addressed properly can cause serious health problems in the near
future.
Table 50: Logical Framework Approach (LFA) Climate Change Adaptation Plan
NREC-MCS-GI JV 146 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
The service delivery and good governance system in the municipality could be promoted
along with the increment of this number along with the widening of sectoral services and
workforces. It would thus contribute the proper execution of Local Government Operation
Act, 2017 in the changing context of federalism.
service deliveries
Increased People’s
Separate authority for monitoring and
7 participation
evaluation of public services and
Rate of project completion
projects
increased
NREC-MCS-GI JV 148 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Local government and leadership incepted since 2017 in the federal context
along with the issues of children, women, youth, elderly people and marginalized
communities/ groups
Abundant of natural resources in the municipality to foster socio-economic
development of the municipality
Institutional problems related to capacity building and offices infrastructures.
NREC-MCS-GI JV 149 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
As we’ve already discussed in earlier sections of financial plan and economic development
plan, a city development of 15-year plan with ambition of one lakh population needs lots of
investment. With model of public private partnership modality of infrastructural Investment,
it is also expected to have investment of private sector in city infrastructure projects. Apart
from security and major strategic roads, in most of the sector we can expect the investment
from private sectors and from other donor agencies. We have to understand that this entire
budget should be funneled down through the single channel of local project implementation
body, which could be TDC or any other new autonomous body. For this projects are
identified under different sections, which could be new construction, upgrading existing
scenario or upgrading the existing quality or capacity. With some standard rate of similar
contemporary projects, under different headings, cost estimation is allocated. As we know
that these development plans have target period of 15 years, we’ve divide into 3 major
milestones, short term, midterm and long term projects. Depending upon the priority of the
project and possible budget required, different projects are put under different time frame.
Some longer term projects may fall under different time period and some of the projects are
continuous process throughout the development, like: training and updating the institutional
capacity.
Highest investment is done under health and physical infrastructures. Apart from the road,
health and education are the most prioritized sector under social development plan to increase
the dependency of the town within RM and between the cities. In yearly basis, budget will be
spent on training and awareness campaigns on various issues on longer term. It is also
important to consider that large amount of investment is under the recreation, where as that
will be spent on buying chunk of lands on urban areas, as the city is already grown or cost is
very high. Good investment is allocated on improving the institutional capacity of the
different service oriented institutions in the form of institutional development plan, financial
plan or in terms of security as well by making citizen friendly city.
Large investment is expected from private sectors as well, especially in the field of housing,
job opportunities, entertainments, recreations and others. Private sectors are obvious to focus
on profit oriented investment such as in industries, economic field along with some well-
known field like education and health. In the field of solid waste management, disaster risk
mitigation plan, environment conservation plan or in the field of climate change, non-
governmental organizations are expected to be in good part. Such national and international
organizations will help to improve the institutional capacity as well as promote the awareness
regarding the topic. Finally, it is expected that more participatory model of investment is
promoted which not only eases the investment burden of central government but also helps to
build the ownership among the resident of that city. Basic summary of the MSIP is shown
below:
NREC-MCS-GI JV 150 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Line Agencies (Water, Health, forest, irrigation etc.) Current Year’s Implementation Projects (Nrs. 000)
Source
S.N Programs and Activities Projected(RS.)
1 Physical Development
1.1 Building
1.1.1 Construction of red cross society building at ward 11 300,000.00
1.1.2 Maintenance of divya jyoti school building 280,500.00
1.1.3 Construction of bus stop in milan chowk 100,000.00
1.1.4 Maintenance of police office building at ward 13 100,000.00
Total 780,500.00
1.2 Road & Bridge
1.2.1 Gravelling different road at ward 8 700,000.00
1.2.2 Gravelling the road of ward 6 325,000.00
1.2.3 Construction of pitch road from sultana chowk to east 800,000.00
1.2.4 Construction of pitch road from mel chowk to gaucharan 700,000.00
1.2.5 Construction of bridge in tanahi river 400,000.00
Total 2,925,000.00
1.3 Drinking Water and Irrigation
1.3.1 irrigation & boring project at patihani tole ward 2 500,000.00
Total 500,000.00
Grand Total Physical Development Plan 4,205,500.00
2 Social Development
2.1 Education
2.1.1 Organizing child awareness program 100,000.00
2.1.2 Training for teachers at ward 13 100,000.00
Total 200,000.00
2.2 Health & Sports
2.2.1 Organizing mayor cup football program at ward 1 50,000.00
2.2.2 Awareness program about communicable disease 100,000.00
NREC-MCS-GI JV 151 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Line Agencies (Water, Health, forest, irrigation etc.) Current Year’s Implementation Projects (Nrs. 000)
Source
S.N Programs and Activities Projected(RS.)
2.2.3 Free health checkup camp 100,000.00
2.2.4 Sports development program at ward 8 50,000.00
2.2.5 Ward wise sports program 200,000.00
Total 500,000.00
Grand Total Social Development Plan 700,000.00
3 Economic Development
3.1 Skill development program for women in every ward 400,000.00
3.2 Skill development program for youth 150,000.00
3.3 Mushroom farming training 100,000.00
3.4 Self-employment training for youth 200,000.00
3.5 Animal husbandry training 100,000.00
Total Economic Development Plan 950,000.00
5 Culture and Tourism
5.1 Conservation of sultana damphu samuha 50,000.00
5.2 Homestay construction 300,000.00
Total Culture and Tourism Plan 350,000.00
6 Disaster Management
6.1 DRM management fund 105,500.00
Total Disaster Management Plan 105,500.00
Grand Total 6,311,000.00
NREC-MCS-GI JV 152 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Summary
Multi Sectoral Investment Plan (MSIP) 15 Years
Anticipated Budget on Thematic Urban Development Program
S.N Description 2018-19 2019-20 2020-21 2021-22 2022-23 (1 2023-2028 2028-2033
Existing Total
(1Year) (1 Year) (1 Year) (1Year) Year) (5 Years) (5 Years)
Physical 84.19% 13.37% 13.15% 12.75% 12.75% 12.61% 22.40% 12.98% 100.00%
1
Development Plan 29302.09 3916.25 3854.49 3736.49 3734.79 3694.29 6563.10 3802.67 29302.09
Social 6.57% 23.02% 18.05% 13.72% 12.33% 12.49% 11.83% 8.56% 100.00%
2
Development Plan 2285.30 525.99 412.54 313.54 281.79 285.44 270.46 195.54 2285.30
Economic 3.33% 22.75% 18.06% 12.31% 8.44% 7.90% 16.23% 14.32% 100.00%
3
Development Plan 1160.68 264.00 209.55 142.92 97.95 91.65 188.37 166.23 1160.67
Financial 0.07% 11.70% 13.63% 10.20% 9.13% 11.70% 16.45% 27.18% 100.00%
4
Development Plan 23.30 2.72 3.18 2.38 2.13 2.73 3.83 6.33 23.30
Conservation, 0.60% 8.09% 6.86% 6.38% 5.96% 7.72% 32.16% 32.83% 100.00%
Culture and
5
Tourism 208.40 16.85 14.30 13.31 12.42 16.09 67.02 68.42 208.40
Development plan
Institutional 0.51% 9.14% 9.17% 10.83% 10.86% 10.95% 28.38% 20.66% 100.00%
6
Development Plan 177.48 16.22 16.28 19.23 19.28 19.43 50.37 36.67 177.48
Environment 0.33% 7.84% 7.41% 7.40% 7.41% 7.41% 32.88% 30.53% 100.87%
7
Management Plan 114.70 7.98 8.50 8.49 8.50 8.50 37.71 35.02 114.70
Disaster Risk 1.50% 9.91% 11.90% 13.83% 15.72% 17.58% 24.19% 6.87% 100.00%
8
Management Plan 522.60 51.76 62.18 72.28 82.18 91.88 126.41 35.91 522.60
2.90% 6.66% 6.66% 6.66% 6.66% 6.66% 33.34% 33.34% 100.00%
Climatic Change
9
Adaptation Plan 1009.85 67.30 67.30 67.30 67.30 67.30 336.68 336.68 1009.85
100%
Total Budget 34804.40 4869.07 4648.32 4375.94 4306.34 4277.31 7643.95 4683.48 34804.40
NREC-MCS-GI JV 153 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRs: Million)
Summarized Budget and responsible agencies
Central Province
SN Activities Total Cost Municipality I/NGO Community
Government Government
1 Physical Development Plan 29302.09 14651.04 7325.52 2930.21 2930.21 1465.10
1.1 Road 15536.00 7768.00 3884.00 1553.60 1553.60 776.80
1.2 Others 6427.00
1.3 Water Supply 1307.93 653.96 326.98 130.79 130.79 65.40
1.4 Drainage and Sanitation 5398.11 2699.06 1349.53 539.81 539.81 269.91
1.5 Solid Waste Management 613.01 306.50 153.25 61.30 61.30 30.65
1.6 Electrical and Communication 20.04 10.02 5.01 2.00 2.00 1.00
2 Social Development Plan 2285.30 1142.65 571.33 228.53 228.53 114.27
2.1 Education 560.05 280.03 140.01 56.01 84.01 0.00
2.2 Health 875.95 437.98 218.99 87.60 131.40 0.00
2.3 Security and Safety 551.30 275.65 137.83 55.13 82.70 0.00
2.4 Recreation 298.00 149.00 74.50 29.80 44.70 0.00
3 Economic Development Plan 1160.68 580.34 290.17 116.07 116.07 58.03
4 Financial Development Plan 23.30 11.65 5.83 2.33 2.33 1.17
5 Conservation, Culture and Tourism 208.40 104.20 52.10 20.84 31.26 0.00
6 Institutional Development Plan 177.48 88.74 44.37 17.75 26.62 0.00
7 Environment Development Plan 114.70 57.35 28.68 11.47 17.21 0.00
8 Disaster Risk Management Plan 522.60 261.30 130.65 52.26 78.39 0.00
9 Climatic Change Adaptation Plan 1009.85 504.93 252.46 100.99 151.48 0.00
Total 34781.10 17390.55 8695.27 3478.11 3579.76 1637.40
NREC-MCS-GI JV 154 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
1.Physical Development Plan
1.1 Road And Bridge
Nu 100
1.1. 1.0
Construction of bridges mbe 1000 00.0 5 2000.0 1000
1 0
r 0.0 0 years 0 2000.00 2000.00 2000.00 2000.00 0.00
Construction of road
Nu
1.1. connecting Khairahani 1.0 100.
mbe
2 municipality and to all 1.0 0 100.0 00 100.0
r
nearby RMs 0 0 5years 20.00 20.00 20.00 20.00 20.00 0
Construction of cycle Lum
1.1.
friendly road networks with psu 3.00
3
minimum width of 2 meter m 3.00 3years 1.00 1.00 1.00 3.00
Construction of pedestrian
pathways on each local,
Lum
1.1. collector and sub-arterial 10.0
psu
4 road, width varying as per 0
m
requirement but not less than 5
2 meter on each side 10.00 years 2.00 2.00 2.00 2.00 2.00 10.00
101 2023.0 1011
Total 13 0 2023.00 2023.00 2022.00 2022.00 3.00
Others 0.00
Lum
1.1. Management of auto- tempo
psu 2.00 5
11 parking
m 2.00 years 0.40 0.40 0.40 0.40 0.40 2.00
construction of separate Lum
1.1.
parking area/building for psu 5.00
12
auto and tempo m 5.00 5years 1.00 1.00 1.00 1.00 1.00 5.00
NREC-MCS-GI JV 155 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
Nu
1.1. Construction of culverts in 1.0 10.0
mbe 10. 5
13 ward 9, 10, 11 and 12. 0 0
r 00 1.00 years 2.00 2.00 2.00 2.00 2.00 10.00
17.0
total 0 3.40 3.40 3.40 3.40 3.40 17.00
Tota
l 0.00
1.2 Water Supply
0.00
Nu 260.00 260.00 260.00 260.00 260.00
Drinking water facilities in 13. 130
1.2. mbe 1.0 100.0 5 1300.
each ward 00 0.00
1 r 0 0 years 00
Lab testing for water to Lum 0.50 0.10 0.10 0.10 0.10 0.10 0.50
1.2. determine quality of water psu 0.50 5
2 (arsenic and purification test) m years
Nu 0.02 0.20 0.20 0.20 0.20 0.20 0.98
Public taps installed along 13.
1.2. mbe 5.0 0.98 5
necessary junctions 00
3 r 0 years
1.2. Programs on public 1.0 5
0.05
4 awareness 0 0.50 years 0.01 0.01 0.01 0.01 0.01 0.05
130 1301.
Total 1.53 260.31 260.31 260.31 260.31 260.31 53
1.3 Drainage and Sanitation
0.00
Nu 5.00 5years 20.00 15.00 10.00 15.00 5.00 65.00
1.3. Construction of drainage mbe 1.0 13. 65.0
1 r 0 00 0
Programs on public Lum 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
1.3. awareness through radio/TV psu
2 broadcasting/Publicity m
NREC-MCS-GI JV 156 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
Lum
Installation of storm water
1.3. psu
drain
3 m 4.00 4.00 5years 0.80 0.80 0.80 0.80 0.80 4.00
Promotion of organic Lum
treatment plant in psu
institutional level for m
1.3. drainage treatment- Reed
4 Bed Treatment Plant 3.00 3.00 5years 0.60 0.60 0.60 0.60 0.60 3.00
72.5
Total 0 21.50 16.50 11.50 16.50 6.50 72.50
1.4 Solid Waste Management
0.00
Nu
1.4. Solid waste collection points mbe 5.0 13.
1 r 0 00 0.02 1.30 5years 0.26 0.26 0.26 0.26 0.26 1.30
1.4. Construction of landfill site Sq. 1.0 0.1
2 in ward 13 Km 0 5 1.00 0.15 1years 0.15 0.15
Provision of separate dustbin Nu
1.4. for HH for degradable and mbe 6.0 13. 5
3 non-degradable waste r 0 00 0.02 1.56 years 0.31 0.31 0.31 0.31 0.31 1.56
Awareness campaign and Lum
1.4. program on 3R’s and psu 5
4 segregation of solid waste m 0.50 0.50 years 0.10 0.10 0.10 0.10 0.10 0.50
Strict laws for the reuse and Lum
1.4. recycling with proper SWM psu 5
5 unit in the municipality m 0.50 0.50 years 0.10 0.10 0.10 0.10 0.10 0.50
Total 4.01 0.92 0.77 0.77 0.77 0.77 4.01
115
Grand total physical 08.0 2309.1 1150
development plan 3 0 2 2303.98 2298.98 2302.98 2292.98 8.03
NREC-MCS-GI JV 157 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
2. Social Development Plan
0.00
2.1 Education
0.00
Lum
Guardians awareness
2.1. psu 0.05 5
program
1 m 0.05 years 0.01 0.01 0.01 0.01 0.01 0.05
Lum
Management of good
2.1. psu 0.50 5
playground
2 m 0.50 years 0.05 0.05 0.05 0.05 0.30 0.50
Nu
Running english medium 13.
2.1. mbe 1.0 1.30 5
classes 00
3 r 0 0.10 years 0.26 0.26 0.26 0.26 0.26 1.30
Lum
2.1. Awareness campaign psu 0.50 5
4 m 0.50 years 0.10 0.10 0.10 0.10 0.10 0.50
Nu
2.1. Technical education mbe 3.0 100.0 300. 5 300.0
5 r 0 0 00 years 60.00 60.00 60.00 60.00 60.00 0
302. 302.3
Total 35 60.42 60.42 60.42 60.42 60.67 5
2.2 Health
0.00
In existing heath institution, lum
2.2. well facilities mind service psu 2.00 5
1 will be provided m 2.00 years 0.40 0.40 0.40 0.40 0.40 2.00
Nu
Management of Ambulance 13.
2.2. mbe 1.0 6.50
facility 00
2 r 0 0.50 2years 3.50 3.00 6.50
2.2. Conducting awareness lum 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
NREC-MCS-GI JV 158 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
programs and training related psu
3 to heath m
Nu
Management of ward clinic 13.
2.2. mbe 1.0 0.65
and vaccination clinic 00
4 r 0 0.05 5years 0.13 0.13 0.13 0.13 0.13 0.65
Nu
2.2. Primary health care center mbe 1.0 13. 5
5 r 0 00 0.20 2.60 years 0.52 0.52 0.52 0.52 0.52 2.60
12.2
Total 5 4.65 4.15 1.15 1.15 1.15 12.25
2.3 Security and Safety
0.00
Lum
Skill development
2.3. psu 0.30
programme
1 m 0.30 5years 0.06 0.06 0.06 0.06 0.06 0.30
Lum
Education for Children
2.3. psu 0.20
program
2 m 0.20 5years 0.04 0.04 0.04 0.04 0.04 0.20
Program related to education Nu
13. 16.9
2.3. on awareness & adolescence mbe 1.0 5
00 0
3 topic r 0 1.30 years 4.00 2.00 2.50 2.00 6.40 16.90
Employment facility to
Lum
differently able person
psu 0.20
2.3. according to their capacity to 5
m
4 make them self-dependent 0.20 years 0.04 0.04 0.04 0.04 0.04 0.20
Lum
Establishment of Old age 200.
2.3. psu 200.0 5 200.0
home 00
5 m 0 years 60.00 60.00 20.00 30.00 30.00 0
2.3. Improvement of surveillance Lum 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
6 by strengthen and broaden psu
safer cities program and local m
NREC-MCS-GI JV 159 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
security management
mechanisms
218. 218.1
Total 10 64.24 62.24 22.74 32.24 36.64 0
2.4 Recreation
0.00
lum
2.4. Children fun park`` psu 100.0 100. 100.0
1 m 0 00 5years 15.00 25.00 15.00 20.00 25.00 0
Formation of community lum
2.4. groups at wards for psu
2 managing parks and spaces m 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
lum
2.4. movie Complex psu 100.0 100. 5 100.0
3 m 0 00 Years 20.00 20.00 20.00 20.00 20.00 0
200. 200.5
Total 50 35.10 45.10 35.10 40.10 45.10 0
Grand total Social 733. 733.2
development plan 20 0 164.41 171.91 119.41 133.91 143.56 0
3. Economic Development Plan
0.00
lum
Extension of fishery pocket
psu 10.0 5
area in ward (9,10,11,12,13)
3.1 m 10.00 0 years 3.70 1.00 2.50 0.80 2.00 10.00
Management of soil and lum
developing pocket area for psu 5.00 5
3.2 organic farming m 5.00 years 1.00 0.80 0.90 2.20 0.10 5.00
Nu
Buffalo/goat husbandry 13.
mbe 1.0 1.30
pocket area 00
3.3 r 0 0.10 5years 0.26 0.26 0.26 0.26 0.26 1.30
NREC-MCS-GI JV 160 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
Nu
13.
Grant in milk production mbe 1.0 1.30
00
3.4 r 0 0.10 5years 0.26 0.26 0.26 0.26 0.26 1.30
Nu
Grant in advance grass 13.
mbe 3.0 0.78
cutting machine 00
3.5 r 0 0.02 5years 0.16 0.16 0.16 0.16 0.16 0.78
lum
Nursery establishment of 100.
psu 100.0 100.0
branch and ground grass 00
3.6 m 0 5years 20.00 15.00 25.00 30.00 10.00 0
Conducting training and
lum
programme related to
psu 0.50
diseases and pest of different
m
3.7 crops 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
Prepare and conducting lum
program related to youth psu 0.50
3.8 self-employment m 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
Create designated business lum
premises for garages, stalls, psu
3.9 etc. m 0.50 0.50 3year 0.17 0.17 0.17 0.50
lum
Construction of
psu
export/import transfer station
3.10 m 2.50 2.50 2year 1.25 1.25 2.50
Provide necessary access to lum
markets for local business & psu 15yea
3.11 businessmen and clients m 0.20 0.20 r 0.04 0.04 0.04 0.04 0.04 0.20
Nu
Establishment of modern 5.0
mbe 100.0 500. 500.0
animal breeding center 0
3.12 r 0 00 5year 200.00 150.00 75.00 25.00 50.00 0
622. 622.5
Total 58 227.03 169.13 104.48 58.92 63.02 8
4. Financial Development Plan 0.00
NREC-MCS-GI JV 161 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
Nu
E- Taxation for increasing
mbe 2.0 2
transparency
4.1 r 0 1.25 2.50 years 1.00 1.50 2.50
Nu
Implementation of combined
mbe 1.0 15.
property tax
4.2 r 0 00 0.10 1.50 5years 0.30 0.30 0.30 0.30 0.30 1.50
Nu
GIS mapping within the city mbe 1.0 5.0
4.3 r 0 0 0.50 2.50 5year 0.50 0.25 0.75 0.30 0.70 2.50
Total 6.50 1.80 2.05 1.05 0.60 1.00 6.50
5. Conservation, Culture and
Tourism
0.00
Conducting program related
Lum
to conservation of different
psu 0.10
caste, cultures and their
m
5.1 tradition 0.10 5years 0.02 0.02 0.02 0.02 0.02 0.10
Preparing implementation
guidelines and monitoring Lum
framework of tourism psu
5.2 development plan m 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
Organizing
workshops/training for
tourism development Ann 1.0
5.3 planners and policy makers ual 0 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
5.4 Organizing hospitality Lum 0.80 0.80 5years 0.16 0.16 0.16 0.16 0.16 0.80
management, handicraft psu
making and awareness m
raising on natural and
NREC-MCS-GI JV 162 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
cultural conservation
trainings to the local people
Developing the roster of
local youths highlighting
their academic and Lum
professional expertise in psu
5.5 tourism sector m 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
Lum
Celebrating the Tourism
psu 1Year
Visit Year-2020
5.6 m 3.00 3.00 s 3.00 3.00
NREC-MCS-GI JV 163 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
employment to poor and psu
backward women training m years
Maintenance of all Lum
20.0
community buildings present psu 5
0
6.6 in municipality m 20.00 years 4.00 4.00 4.00 4.00 4.00 20.00
25.6
Total 5 5.13 5.13 5.13 5.13 5.13 25.65
7. Environment Development Plan
0.00
Plan 1.0 5
Plant nursery production 0.50
7.1 t 0 0.50 years 0.10 0.10 0.10 0.10 0.10 0.50
Wor 1.0 5
Environmental Management 0.10
7.2 k 0 0.10 years 0.02 0.02 0.02 0.02 0.02 0.10
Management and Wor 1.0 5
0.10
7.3 preservation of public land k 0 0.10 years 0.02 0.02 0.02 0.02 0.02 0.10
Nu
1.0
Soil management mbe 0.10 5
0
7.4 r 0.10 years 0.02 0.02 0.02 0.02 0.02 0.10
Nu
13.
One ward one park campaign mbe 1.0 2.60
00
7.5 r 0 0.20 5years 0.52 0.52 0.52 0.52 0.52 2.60
Training programs,
establishment of library in num 13.
1.30
each school, distribution of ber 1.0 00
7.6 necessary equipment 0 0.10 5years 0.26 0.26 0.26 0.26 0.26 1.30
Total 4.70 0.94 0.94 0.94 0.94 0.94 4.70
8. Disaster Risk Management Plan
0.00
Preparation of multi hazard Wor 1.0
8.1 map and RSLUP k 0 5.00 5.00 5years 1.00 1.00 1.00 1.00 1.00 5.00
NREC-MCS-GI JV 164 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
lum
Byelaws preparation psu 1.0 1Year
8.2 m 0 1.00 1.00 s 1.00 1.00
Proper infrastructure
development with proper lum
design with respect to land psu 1.0 10.5
8.3 availability m 0 10.50 0 5years 2.10 2.10 2.10 2.10 2.10 10.50
Enhance human resource and Lum
institutional capacity psu 1.0 13.
8.4 programme m 0 00 0.20 0.20 5years 0.04 0.04 0.04 0.04 0.04 0.20
Construction of conservation Lum
ponds, water collection psu 10. 1.0
8.5 ponds m 00 0 0.50 0.50 5years 0.10 0.10 0.10 0.10 0.10 0.50
Nu
Training on disasters Event mbe 1.0 13.
8.6 r 0 00 0.10 1.30 5years 0.26 0.26 0.26 0.26 0.26 1.30
Coordinate with the DDRC
to return the disaster lum
displaced persons to their psu 1.0
8.7 respective places m 0 2.00 2.00 5years 0.40 0.40 0.40 0.40 0.40 2.00
20.5
Total
0 0 4.90 3.90 3.90 3.90 3.90 20.50
9. Climatic Change Adaptation
Plan
0.00
Lum
Water sources conservation psu 1.0 500.0 500. 500.0
9.1 m 0 0 00 5years 100.00 100.00 100.00 100.00 100.00 0
500. 500.0
Total 00 100.00 100.00 100.00 100.00 100.00 0
Grand Total 134 0 2816.8 2757.52 2634.37 2606.85 2611.00 1342
NREC-MCS-GI JV 165 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 5 Years ( NRPS: Million)
2018-
Tot Time 2019-20 2020-21 2022-23
No Qt 19 2021-22
SN Activities Unit Rate al (Year (1 (1 (1 Total
s. y. (1Year (1Year)
Cost ) Year) Year) Year)
)
26.5
6 2 6.56
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
1.Physical Development Plan
1.1 Road And Bridge
Reconstruction of Nu
1.1. 500
affected bridges in ward mbe 3.00 5000. 10 500.0 500.0 5000
1 0.00
(9,10 and 2), r 00 years 0 500.00 500.00 0 500.00 2500.00 .00
Road status Lu
1.1. 200.
improvement in ward mps 200.0 10 200.
2 00
(12,13,10,11,5) um 0 years 20.00 20.00 20.00 20.00 20.00 100.00 00
520 520.0 520.0 5200
Total 0 0 520.00 520.00 0 520.00 2600.00 .00
Others 0.00
1.1. Extraction management Lu 200.0 200. 10 20.00 20.00 20.00 20.00 20.00 100.00 200.
11 of canal should be done mps 0 00 years 00
NREC-MCS-GI JV 166 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
in roads um
Nu
1.1. Construction of dam 10.0
mbe 1.0 1.00 10year 10.0
12 as a river training 0
r 0 10.00 s 2.25 2.25 1.00 1.00 1.00 2.50 0
210.
total 210 22.25 22.25 21.00 21.00 21.00 102.50 00
Tot
al 0.00
1.2 Water Supply
0.00
Lu
Pure drinking water and
1.2. mps 2.00 10
sanitation
1 um 2.00 years 0.20 0.20 0.20 0.20 0.20 1.00 2.00
Lu
1.2. Maintenance of existing
mps 2.00 10
2 tap and well
um 2.00 years 0.30 0.30 0.30 0.30 0.30 0.50 2.00
Lu
Conservation of water
1.2. mps 2.00 10
source
3 um 2.00 years 0.30 0.30 0.30 0.30 0.30 0.50 2.00
Total 6 0.80 0.80 0.80 0.80 0.80 2.00 6.00
1.3 Drainage and Sanitation
0.00
Nu
Public toilet at Parsa
1.3. mbe 5.0 1.00 2.00 10
bazar in ward 6 and 8
1 r 0 0.40 years 0.85 0.50 0.20 0.05 0.10 0.30 2.00
1.3. Installation of Sewerage 190. 381. 10year 381.
Km
2 Network 61 2.00 21 s 70.00 70.00 70.00 70.00 70.00 31.21 21
383. 383.
Total 21 70.85 70.50 70.20 70.05 70.10 31.51 21
1.4 Solid Waste Management 0.00
NREC-MCS-GI JV 167 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
Promote biogas
installation and Lu
1.4. penalties on public mps 10year
1 disposal of solid waste um 1.00 1.00 s 0.50 0.10 0.10 0.10 0.10 0.10 1.00
Formation of capable
SWM committee on Lu
1.4. Khairahani Municipality mps 10year
2 and surrounding RM um 1.00 1.00 s 0.50 0.10 0.10 0.10 0.10 0.10 1.00
Total 2 1.00 0.20 0.20 0.20 0.20 0.20 2.00
1.5 Electrical and
Communication
0.00
1.5. Sq. 20.4 10year
Expansion of electricity
1 Km 2 0.05 1.02 s 0.11 0.11 0.11 0.11 0.11 0.47 1.02
1.5. Expansion of Sq. 20.4 10year
2 telecommunication Km 2 0.05 1.02 s 0.11 0.11 0.11 0.11 0.11 0.47 1.02
Solar lights installed on lum
1.5. roads and other public psu 10year
3 spaces m 8.00 8.00 s 2.00 2.00 1.00 0.50 1.00 1.50 8.00
Promotion and lum
1.5. monitoring of FM psu 10year
4 stations m 0.50 0.50 s 0.20 0.10 0.10 0.05 0.01 0.05 0.50
Wi-Fi hot-spots in the
public spaces like bus lum
1.5. parks, parks and other psu 10year
5 urban squares m 1.00 1.00 s 0.50 0.10 0.10 0.10 0.10 0.10 1.00
11.5 11.5
Total 4 2.92 2.42 1.42 0.87 1.33 2.59 4
Grand total physical 581 0 617.8 616.17 613.62 612.9 613.43 2738.80 5812
NREC-MCS-GI JV 168 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
development plan 2.75 2 2 .75
2. Social Development Plan
0.00
2.1 Education
0.00
Lu
Management of
2.1. mps 2.00 10
building
1 um 2.00 years 0.85 0.50 0.20 0.05 0.10 0.30 2.00
Lu
Management of E-
2.1. mps 1.00 10
library
2 um 1.00 years 0.50 0.10 0.10 0.10 0.05 0.15 1.00
Nu
Conducting training 13.0
2.1. mbe 1.0 1.30 10
about quality education 0
3 r 0 0.10 years 0.13 0.13 0.13 0.13 0.13 0.65 1.30
Lu
Management of child 13.0 26.0
2.1. mps 1.0 10 26.0
friendly school 0 0
4 um 0 2.00 years 10.00 4.00 3.00 2.00 2.00 5.00 0
Lu
Management of pure
2.1. mps 1.00 10
drinking water and toilet
5 um 1.00 years 0.10 0.10 0.10 0.10 0.10 0.50 1.00
Identification and Lu
2.1. management of private mps 0.80 10
6 school and colleges um 0.80 years 0.08 0.08 0.08 0.08 0.08 0.40 0.80
32.1
Total 32.1 11.66 4.91 3.61 2.46 2.46 7.00 0
2.2 Health
0.00
Nu
Establishment of heath 13.0
2.2. mbe 1.0 6.50 10
post in each ward 0
1 r 0 0.50 years 0.65 0.65 0.65 0.65 0.65 3.25 6.50
2.2. By improving the status lum 1.00 2.00 2.00 10 0.70 0.50 0.30 0.20 0.20 0.10 2.00
NREC-MCS-GI JV 169 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
of primary health
center, they should be psu
transfer as well facilities m
2 hospital years
Total 8.50 1.35 1.15 0.95 0.85 0.85 3.35 8.50
2.3 Security and Safety
0.00
Regulation of education Lu
2.3. program to differently mps 0.50 10
1 able people um 0.50 years 0.05 0.05 0.05 0.05 0.05 0.25 0.50
Establishing police
station/booths in city
pockets and establish
crime prevention
strategy and emergency Lu
2.3. response team for mps 1.0 10year
2 disaster um 0 0.40 0.40 s 0.04 0.04 0.04 0.04 0.04 0.20 0.40
Establishment of at least
one Early Childhood
Development Center in Nu
2.3. each ward of mbe 1.0 13.0 26.0 10 26.0
3 municipality r 0 0 2.00 0 years 11.00 7.00 2.00 2.00 1.00 3.00 0
26.9
Total 26.9 11.09 7.09 2.09 2.09 1.09 3.45 0
2.4 Recreation
0.00
lum
Develop proper trekking
2.4. psu 10
route
1 m 1.50 1.50 years 0.10 0.10 0.10 0.10 0.10 1.00 1.50
Formation of ward-wise
2.4. lum 2.00 2.00 10 0.14 0.14 0.14 0.14 0.14 1.30 2.00
NREC-MCS-GI JV 170 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
team for specific games
(football, volleyball and psu
2 cricket) m years
Total 3.5 0.24 0.24 0.24 0.24 0.24 2.30 3.50
Grand total Social 71.0
development plan 71 0 24.34 13.39 6.89 5.64 4.64 16.10 0
3. Economic Development
Plan
0.00
Extension of food crops lum
and vegetables pocket psu 30.0 10 30.0
3.1 area m 30.00 0 years 3.00 4.00 2.00 2.00 4.00 15.00 0
Training about different lum
diseases and pest psu 10
3.2 control m 1.00 1.00 years 0.10 0.10 0.10 0.10 0.10 0.50 1.00
Construction and lum
maintenance of small psu 5.00 10
3.3 irrigation canal m 5.00 years 0.50 0.50 0.30 0.70 0.50 2.50 5.00
lum
Construction of cold 10.0
psu 5.0 10 10.0
store 0
3.4 m 0 2.00 years 0.70 0.70 0.70 0.70 0.70 6.50 0
Establishment of Lu
refining industries mps 1.00 10
3.5 (sauces, chips) um 1.00 years 0.07 0.07 0.07 0.07 0.07 0.65 1.00
lum
Production and storage
psu 2.00 10
of seed
3.6 m 2.00 years 0.13 0.13 0.13 0.13 0.13 1.34 2.00
Nu
Cow husbandry pocket 13.0
mbe 1.0 2.60 10
area 0
3.7 r 0 0.20 years 0.17 0.17 0.17 0.17 0.17 1.73 2.60
NREC-MCS-GI JV 171 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
Grant in transportation lum
in milna esnaalaizer, psu 5.00 10
3.8 chilingtar m 5.00 years 0.50 0.50 0.50 0.50 0.50 2.50 5.00
Training and
programmer for lum
1.00
commercial animal psu 10
3.9 husbandry m 1.00 years 0.10 0.10 0.10 0.10 0.10 0.50 1.00
lum
Improvement in fishery
psu 2.50 10
and dairy shop
3.10 m 2.50 years 0.25 0.25 0.25 0.25 0.25 1.25 2.50
By identification of
lum
Tourism place
psu 5.00
necessary infrastructure 10
m
3.11 should be managed 5.00 years 0.50 0.50 0.50 0.50 0.50 2.50 5.00
65.1 65.1
Total 0 6.03 7.03 4.83 5.23 7.03 34.97 0
4. Financial Development
Plan
0.00
Lu
Asset management mps 10year
4.1 um 0.20 0.20 s 0.02 0.02 0.02 0.02 0.02 0.10 0.20
Total 0.20 0.02 0.02 0.02 0.02 0.02 0.10 0.20
5. Conservation, Culture and
Tourism
0.00
Management of Ann 15.0 10
5.1 homestay ual 0 0.50 7.50 years 0.50 0.50 0.50 0.50 0.50 5.00 7.50
5.2 Management of proper Ann 15.0 0.70 10.5 10 0.70 0.70 0.70 0.70 0.70 7.00 10.5
infrastructure in tourism ual 0 0 years 0
NREC-MCS-GI JV 172 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
places
Preparing/updating lum
tourism development psu 10
5.3 plan m 0.50 0.50 years 0.03 0.03 0.03 0.03 0.03 0.34 0.50
Offering jungle safari
activities at Kankali
community forest,
Devithan community
forest, Jabisavari
community forest, 10
2.00 2.00 0.13 0.13 0.13 0.13 0.13 1.34
Kumrose madhya years
community fores, Sulali
budhauli community
forest and Kutakoti Lu
public forest (Green mps
5.4 Park) um 2.00
Forming the national
and international Lu 10
1.00 1.00 0.07 0.07 0.07 0.07 0.07 0.67
“Youth Samparka mps years
5.5 Manch” um 1.00
Preparing the visual
documentary of the
10
touristic sites and Lu 1.00 1.00 0.07 0.07 0.07 0.07 0.07 0.67
years
uploading it in websites mps
5.6 and social sites um 1.00
Keeping the Tourism
Information Desk
10
nearby Municipality NU 0.50 7.50 0.50 0.50 0.50 0.50 0.50 5.00
years
office with digital MB 1.0 15.0
5.7 information boards ER 0 0 7.50
Total 30 2.00 2.00 2.00 2.00 2.00 20.00 30.0
NREC-MCS-GI JV 173 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
0
6. Institutional Development
Plan 0.00
Orientation about Nu
judicial formulation to mbe 1.00 2.00 10
6.1 judicial officer r 2.00 years 0.14 0.14 0.14 0.14 0.14 1.28 2.00
Preparation of Nu
13.0
integrated citizen ward mbe 1.0 1.30 10
0
6.2 letter r 0 0.10 years 0.13 0.13 0.13 0.13 0.13 0.65 1.30
Service companion
should be paid by Nu
responsible person, such mbe 1.00 0.05
rules and regulation r 3.0 10
6.3 should be forwarded 0 0.02 years 0.00 0.00 0.00 0.00 0.00 0.02 0.04
Ward and government
Lu
office should be
mps 0.01
constructed disable- 1.0 10
um
6.4 friendly (Apanga maitri) 0 0.01 years 0.00 0.00 0.00 0.00 0.00 0.00 0.01
Every institution should
prepare their monthly Lu
financial particular and mps 0.03
move towards um 10
6.5 publishing process 0.03 years 0.00 0.00 0.00 0.00 0.00 0.01 0.02
Conduct program Lu
related to make children mps 0.05 10
6.6 -friendly municipal um 0.05 years 0.00 0.00 0.00 0.00 0.00 0.05 0.05
Provide education and
capacity building for num 13.0
5.00
participatory integrated ber 1.0 0 10
6.7 development plan 0 5.00 years 1.00 0.05 1.00 0.05 1.20 1.70 5.00
NREC-MCS-GI JV 174 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
Create an active
interactive website and
software to minimize Lu
paper work and single mps 1.50
window system for um
similar or interlinked 10
6.8 works 1.50 years 0.10 0.10 0.10 0.10 0.10 1.00 1.50
Establish information
and intelligence
Lu
gathering systems for
mps 1.00
regular trainings and
um
knowledge exchange 10
6.9 workshops 1.00 years 0.10 0.10 0.10 0.10 0.10 0.50 1.00
num 1.0 15.0 22.5 10 22.5
Strengthening TDOs
6.10 bers 0 0 1.50 0 years 2.25 2.25 2.25 2.25 2.25 11.25 0
Human resource for num 2.0 15.0 10
6.11 IUDP Implementation ber 0 0 0.04 1.05 years 0.07 0.07 0.07 0.07 0.07 0.70 1.05
Institutional Lu
coordination and mps 10
6.12 networking um 0.05 0.05 years 0.00 0.00 0.00 0.00 0.00 0.04 0.05
34.5 34.5
Total 3 3.81 2.86 3.81 2.86 4.01 17.20 2
7. Environment Development
Plan 0.00
Control animal attack Wor 10
1.00 0.10
7.1 and preserve them k 0.10 years 0.01 0.01 0.01 0.01 0.01 0.05 0.10
Forest management and Wor 10
1.00 0.10
7.2 preservation k 0.10 years 0.01 0.01 0.01 0.01 0.01 0.05 0.10
Construction of park Wor 10
1.00 0.10
7.3 and resting places k 0.10 years 0.01 0.01 0.01 0.01 0.01 0.05 0.10
7.4 Environmental and Wor 1.00 0.10 0.10 10 0.01 0.01 0.01 0.01 0.01 0.05 0.10
NREC-MCS-GI JV 175 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
forest management k years
For environmental
conservation Nu
afforestation and mbe 1.00 0.10
sanitation program r 10
7.5 should be conducted 0.10 years 0.01 0.01 0.01 0.01 0.01 0.05 0.10
Scientific land Use wor 1.0 10
7.6 Planning k 0 0.50 0.50 years 0.03 0.03 0.03 0.03 0.03 0.34 0.50
Afforestation and
reforestation of all types
of classes of depleted
and denuded forest
lands, waste lands and Nu
range land through mbe 1.0 10.0 10
7.7 people’s participation r 0 0 0.50 5.00 years 0.50 0.50 0.50 0.50 0.50 2.50 5.00
Total 6.00 0.58 0.58 0.58 0.58 0.58 3.09 6.00
8. Disaster Risk Management
Plan 0.00
Wor 10.0 10 10.0
Flood control programs 1.00
8.1 k 10.00 0 years 1.00 1.00 1.00 1.00 1.00 5.00 0
Programs related to Wor 10
1.00 5.00
8.2 wind/storm risk control k 5.00 years 0.33 0.33 0.33 0.33 0.33 3.35 5.00
Measuring earthquake Wor 10
1.00 0.50
8.3 risk k 0.50 years 0.03 0.03 0.03 0.03 0.03 0.34 0.50
Controlling natural Wor 20.0 10 20.0
1.00
8.4 disaster k 20.00 0 years 1.33 1.33 1.33 1.33 1.33 13.35 0
Awareness and pre-
Wor
planning from disaster 1.00 0.50 10
k
8.5 risk 0.50 years 0.03 0.03 0.03 0.03 0.03 0.34 0.50
8.6 Development of Nu 1.0 0.50 0.50 10 0.50 0.50
watershed management mbe 0 years
NREC-MCS-GI JV 176 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
plan r
Effective
implementation of Lu
forest management mps 10
8.7 plans um 0.50 0.50 years 0.03 0.03 0.03 0.03 0.03 0.33 0.50
Lu
Restoration of degraded
mps 10
and denuded slopes
8.8 um 0.50 0.50 years 0.03 0.03 0.03 0.03 0.03 0.33 0.50
lum
Plantation in soil
psu 10
erosion risk areas
8.9 m 1.00 0.50 0.50 years 0.03 0.03 0.03 0.03 0.03 0.34 0.50
Building of
embankment and (river) Lu
spur in high risk mps 1.0 500.0 500. 10 500.
8.10 locations um 0 0 00 years 50.00 60.00 70.00 80.00 90.00 150.00 00
Lu
Mitigate hazard with
mps 1.0 10
appropriate technology
8.11 um 0 1.00 1.00 years 0.10 0.10 0.10 0.10 0.10 0.50 1.00
Tota 503. 503.
l 00 50.20 60.20 70.70 80.20 90.20 151.50 00
9. Climatic Change
Adaptation Plan
Programs related to Wor 1.0 10
0.50
9.1 climate change k 0 0.50 years 0.03 0.03 0.03 0.03 0.03 0.34 0.50
Public awareness wor 1.0 13.0 10
9.2 campaign k 0 0 0.15 1.95 years 0.13 0.13 0.13 0.13 0.13 1.30 1.95
Lu
Updating the climate
mps 1.0 10
data
9.3 um 0 8.00 8.00 years 0.53 0.53 0.53 0.53 0.53 5.35 8.00
9.4 Develop pedestrian Lu 1.0 13.0 10.00 130. 10 8.66 8.66 8.66 8.66 8.66 86.70 130.
friendly roads mps 0 0 00 years 00
NREC-MCS-GI JV 177 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 10 Years ( NRPS: Million)
2018- 2021-
Tota 2019- 2020- 2022- 2023-
Nos Time 19 22
SN Activities Unit Qty. Rate l 20 (1 21 (1 23 (1 2028 (5 Total
. (Year) (1Yea (1Yea
Cost Year) Year) Year) Years)
r) r)
um
Training on climate
change adoption Lu
agriculture farming as mps 1.0 13.0 10
9.5 well as cattle farming um 0 0 0.15 1.95 years 0.13 0.13 0.13 0.13 0.13 1.30 1.95
Activities promoting off Lu
season vegetable mps 1.0 10
9.6 farming system um 0 2.00 2.00 years 0.13 0.13 0.13 0.13 0.13 1.34 2.00
Lu
Plantation in road side mps 30.0 10 30.0
9.7 um 30.00 0 years 2.00 2.00 2.00 2.00 2.00 20.00 0
Nu
Awareness programme mbe 1.0 13.0 10
9.8 r 0 0 0.15 1.95 years 0.13 0.13 0.13 0.13 0.13 1.30 1.95
176. 176.
Total 35 11.75 11.75 11.75 11.75 11.75 117.62 35
669 716.5 721.1 6698
Grand Total 8.93 0 4 713.99 714.19 9 733.64 3099.37 .93
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
NREC-MCS-GI JV 178 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
blacktopped 00 0 years
Improvement of road
Lum
1.1.3 networks and preparation 6.00 15
psum
of MTMP 6.00 years 0.50 0.50 0.50 0.50 0.50 1.75 1.75
Construction and
expansion of road system Lum
1.1.4 5.00
by land pooling and GLD psum 15
roads 5.00 years 0.40 0.40 0.40 0.40 0.40 1.50 1.50
Urgent construction of
road structures and road Lum
1.1.5 10.00
furniture including bicycle psum 10.0 15
lanes and foot paths 0 years 0.70 0.70 0.70 0.70 0.70 3.25 3.25
Maintain and synchronize
traffic lights through Lum
1.1.6 2.00
government and private psum 15
sectors 2.00 years 0.20 0.20 0.20 0.20 0.20 0.50 0.50
Total 223 19.80 19.80 19.80 19.80 19.80 62.00 62.00
Others
Ring road parking for long Lum 200. 200.0 15
1.1.11
term planning psum 00 0 years 14.00 14.00 14.00 14.00 14.00 65.00 65.00
Construction of bridges in Num 500. 6000. 15
1.1.12 1
ward 2, 3, 7, 9, 10 and 12 ber 12.00 00 00 years 400.00 400.00 400.00 400.00 400.00 2000.00 2000.00
6200.
total 00 414.00 414.00 414.00 414.00 414.00 2065.00 2065.00
Total
1.2 Water Supply
All wards facilitated with Num 15
1.2.1 drinking water ber 1.00 0.20 0.200 years 0.01 0.01 0.01 0.01 0.01 0.07 0.07
Promoting rainwater Num 15
1.2.2 harvesting in household ber 1.00 0.20 0.200 years 0.01 0.01 0.01 0.01 0.01 0.07 0.07
NREC-MCS-GI JV 179 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
level by subsidizing on
money and technical
support.
Total 0.40 0.03 0.03 0.03 0.03 0.03 0.13 0.13
1.3 Drainage and Sanitation
Waste water treatment
plants in ward 13 at south Lum
east of Simreni and north psum 15yea
1.3.1 of Gauwa 5.00 5.00 rs 0.40 0.40 0.40 0.40 0.40 1.50 1.50
Mandatory toilet with
septic tank in every Num 1 123 4932. 15yea
1.3.2 buildings ber 31 0.40 40 rs 330.00 330.00 330.00 330.00 330.00 1641.20 1641.20
Lum
Set up public toilet in
psu 15yea
public zone
1.3.3 m 5.00 5.00 rs 0.40 0.40 0.40 0.40 0.40 1.50 1.50
4942.
Total 40 330.80 330.80 330.80 330.80 330.80 1644.20 1644.20
1.4 Solid Waste Management
Waste transfer and recycle
station one each in ward 2
(south west of Chainpur),
9 (east of Purano Parsa),
10 (north of Kathar) and
ward 13 (south east of Num 300. 300.0 15yea
1.4.1 Gauwa) ber 1.00 00 0 rs 120.00 100.00 25.00 25.00 10.00 10.00 10.00
Use moderns technology
and adopt the 3Rs
(reducing, recycling and Lum 15yea
1.4.2 reuse of waste) psum 5.00 5.00 rs 0.40 0.40 0.40 0.40 0.40 1.50 1.50
1.4.3 Privatization of SWM Lum 2.00 2.00 15yea 0.15 0.15 0.15 0.15 0.15 0.63 0.63
NREC-MCS-GI JV 180 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
psum rs
Discouraging of roadside
storage of solid waste by
constructing a transfer 1
station within the radius of Num 200. 200.0 15yea
1.4.4 5 KM. ber 00 0 rs 80.00 50.00 20.00 20.00 10.00 10.00 10.00
Efficient use of landfill
site and guiding with
principle of zero waste to Lum 100. 100.0 15yea
1.4.5 land fill site. psum 00 0 rs 25.00 20.00 15.00 10.00 5.00 20.00 5.00
607.0
Total 0 225.55 170.55 60.55 55.55 25.55 42.13 27.13
1.5 Electrical and
Communication
ST and LT program for
promoting private and
government sector for
qualitative internet and lump 15
1.5.1 communication facility sum 0.50 0.50 years 0.04 0.04 0.04 0.04 0.04 0.14 0.16
Formulating energy policy
for promoting renewable
energy sources in public lump 15
1.5.2 and private usage sum 3.00 3.00 years 0.20 0.20 0.20 0.20 0.20 1.00 1.00
Investing and planning for
smart grid electricity lump 15yea
1.5.3 infrastructure sum 5.00 5.00 rs 0.40 0.40 0.40 0.40 0.40 1.50 1.50
Total 8.50 0.64 0.64 0.64 0.64 0.64 2.64 2.66
Grand total physical 1198
development plan 1.30 0 990.82 935.82 825.82 820.82 790.82 3816.10 3801.12
2. Social Development Plan
2.1 Education
NREC-MCS-GI JV 181 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
Lum 15
Computer lab 0.60
2.1.1 psum 0.60 years 0.04 0.04 0.04 0.04 0.04 0.20 0.20
Cost free education for Lum 15
5.00
2.1.2 inter level (+12) psum 5.00 years 0.40 0.40 0.40 0.40 0.40 1.50 1.50
Establishment of primary,
secondary and higher Lum 100. 100.0 15
2.1.3 secondary schools psum 00 0 years 25.00 20.00 15.00 10.00 5.00 20.00 5.00
Establishment of goods
college for higher
education by government Lum 120. 120.0 15
2.1.4 and private sector psum 00 0 years 50.00 15.00 20.00 5.00 10.00 10.00 10.00
225.6
Total 0 75.44 35.44 35.44 15.44 15.44 31.70 16.70
2.2 Health
Purchasing of medicine to
lump
distribute from heath 0.20 15
sum
2.2.1 institution 0.20 years 0.01 0.01 0.01 0.01 0.01 0.07 0.07
Construction of building
lump
for vaccination center in 5.00 15
sum
2.2.2 wards (1,3,4,5,9,11 ) 5.00 years 0.40 0.40 0.40 0.40 0.40 1.50 1.50
Num 400. 400.0 15
Construction of Hospital 1
2.2.3 ber 1.00 00 0 years 100.00 75.00 60.00 50.00 45.00 50.00 20.00
15 bedded community
hospital with all Num 200. 200.0 15
2.2.4 emergency services ber 1.00 1 00 0 years 80.00 40.00 20.00 10.00 15.00 20.00 15.00
Community-based health
lump
care clinic with maternal 100. 100.0 15YE
sum
2.2.5 care, lab and pharmacy 00 0 ARS 25.00 20.00 15.00 10.00 5.00 20.00 5.00
2.2.6 Yoga and meditation numb 3.00 50.0 150.0 15 20.00 20.00 20.00 20.00 20.00 25.00 25.00
center with registered er 0 0 years
NREC-MCS-GI JV 182 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
doctor
855.2
Total 0 225.41 155.41 115.41 90.41 85.41 116.57 66.57
2.3 Security and Safety
Num 15yea
Awareness program 13 2.60
2.3.1 ber 1.00 0.20 rs 0.18 0.18 0.18 0.18 0.18 0.85 0.85
Women empowerment Num 15yea
13 2.60
2.3.2 program ber 1.00 0.20 rs 0.18 0.18 0.18 0.18 0.18 0.85 0.85
Conduction of program Lum 15yea
0.10
2.3.3 against women violence psum 0.10 rs 0.01 0.01 0.01 0.01 0.01 0.03 0.03
Create employment for the
youth and establish
Lum
registration centres for the 1.00
psum
jobless youth – cottage 15yea
2.3.4 industries 1.00 rs 0.07 0.07 0.07 0.07 0.07 0.33 0.33
CCTV surveillance to be Lum
installed in the city and psu 300. 300.0 15yea
2.3.5 firefighting facility m 00 0 rs 30.00 30.00 30.00 30.00 30.00 75.00 75.00
306.3
Total 0 30.43 30.43 30.43 30.43 30.43 77.07 77.07
2.4 Recreation
Management of children
parks, and gardens and
recreational parks (at the lump 15
2.4.1 wards level) sum 3.00 3.00 years 0.20 0.20 0.20 0.20 0.20 1.20 0.80
Construction of
community halls (with
library, convention and
musical facility)- in each numb 15
2.4.2 ward er 1.00 13 5.00 65.00 years 4.40 4.40 4.40 4.40 4.40 21.50 21.50
NREC-MCS-GI JV 183 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
Establishment of youth
and sports development
center in each wards of the numb 15
2.4.3 municipality er 1.00 13 2.00 26.00 years 1.75 1.75 1.75 1.75 1.75 8.63 8.63
Total 94.00 6.35 6.35 6.35 6.35 6.35 31.33 30.93
Grand total Social 1481.
development plan 10 0 337.64 227.64 187.64 142.64 137.64 256.66 191.26
3. Economic Development Plan
Fertilize uterus of lump 20.0 15yea
20.00
3.1 cow/buffalo(Vetrinary) sum 0 r 1.33 1.33 1.33 1.33 1.33 6.68 6.68
Distribution of he-goat
breed improvement lump 2.00 15
3.2 facility sum 2.00 years 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Extension of potato pocket lump 15
2.00
3.3 area sum 2.00 years 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Construction and
lump
management of irrigation 10.0 10.00 15
sum
3.4 canal 0 years 0.67 0.67 0.67 0.67 0.67 3.34 3.34
Block construction for lump 15
2.00
3.5 food crops sum 2.00 years 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Block construction for lump 15
3.00
3.6 vegetables sum 3.00 years 0.20 0.10 0.20 0.30 0.20 1.00 1.00
lump 15
Market management 2.00
3.7 sum 2.00 years 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Construction of irrigation
lump
infrastructure (boring , 10.0 10.00 15
sum
3.8 gravity type irrigation) 0 years 0.67 0.67 0.67 0.67 0.67 3.33 3.33
Establishment of farmer lump 15
1.00
3.9 community network sum 1.00 years 0.07 0.07 0.07 0.07 0.07 0.33 0.33
Industrialization should be lump 100. 100.0 15yea
3.10 done by maintaining sum 00 0 rs 6.67 7.00 8.00 9.00 2.00 33.67 33.67
NREC-MCS-GI JV 184 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
equilibrium with the
environment
Management of high
lump 200.0
voltage electricity for 200. 15yea
sum 0
3.11 Industrial development 00 rs 13.33 13.33 13.33 13.33 13.33 66.68 66.68
Land should be available lump 15yea
1.00
3.12 for parking sum 1.00 rs 0.07 0.07 0.07 0.07 0.07 0.33 0.33
Management of Home stay lump 15yea
1.00
3.13 (according to cast ) sum 1.00 rs 0.07 0.07 0.07 0.07 0.07 0.33 0.33
Establish/strengthen the
links between informal
and formal (e.g. garbage
collection, prevention of
communicable diseases, Num 15yea
3.14 water and sanitation) ber 1.00 15 0.50 7.50 rs 0.50 0.50 0.50 0.50 0.50 2.50 2.50
Promote new technology
and techniques in lump 100. 100.0 15yea
3.15 agricultural activity sum 00 0 r 6.67 9.00 8.00 7.00 2.00 33.67 33.67
Upgrade existing
lump
market/build open air 15yea
sum
3.16 market 0.50 0.50 r 0.03 0.03 0.03 0.03 0.03 0.17 0.17
Introduce modern urban
Num
farming, greenhouses, 1.00 15 15
ber
3.17 poultry 0.50 7.50 years 0.50 0.50 0.50 0.50 0.50 2.50 2.50
Monitoring for control of Annu 15yea
1.00 15
3.18 illegal market al 0.20 3.00 r 0.20 0.10 0.20 0.30 0.20 1.00 1.00
lump 15yea
Training to the farmers
3.19 sum 0.50 0.50 rs 0.03 0.03 0.03 0.03 0.03 0.17 0.17
473.0
Total 0 31.53 33.99 34.19 34.39 22.19 158.35 158.35
4. Financial Development Plan
NREC-MCS-GI JV 185 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
Borrowing, grants and
funds for different Num 15yea
4.1 stakeholders ber 1.00 1 1.50 1.50 r 0.10 0.10 0.10 0.10 0.10 0.40 0.60
Government security and numb 15yea
4.2 provision of easy loan. er 1.00 15 1.00 15.00 r 1.00 1.20 1.40 1.60 1.80 3.00 5.00
Celebrating & award for annu 15yea
4.3 good tax payer al 0.10 0.10 r 0.01 0.01 0.01 0.01 0.01 0.03 0.03
Total 16.60 1.11 1.31 1.51 1.71 1.91 3.43 5.63
5. Conservation, Culture and
Tourism
Formation of Tourism
Development and
1
Management Committee numb 15yea
5.1 (TDMC) in every wards er 13 0.50 6.50 rs 0.43 0.43 0.43 0.43 0.43 2.17 2.17
Maintenance of Cheemkya
Devi Temple, Kankali
Tample and Bharmathan
Tample for developing as Lum 10.0 15yea
5.2 religious touristic site psum 0 10.00 rs 0.66 0.66 0.66 0.66 0.66 3.35 3.35
Developing sports stadium
at ward no 05, to promote Lum 100. 100.0 15yea
5.3 the sports tourism psum 00 0 rs 6.67 6.67 6.67 6.67 6.67 33.33 33.33
Advancing the facilities at
homestays at ward number Num 4 15yea
5.4 7, 8, 10 and 12 ber 0.50 2.00 rs 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Conserving Darai bote
Lake and promote tourism lump 15yea
5.5 activities sum 2.50 2.50 rs 0.17 0.17 0.17 0.17 0.17 0.83 0.83
Offering Rapti river
boating and crocodile Lum 15yea
5.6 viewing activities psum 2.00 2.00 rs 0.15 0.22 0.20 0.20 0.33 0.10 0.80
NREC-MCS-GI JV 186 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
Assessing the disaster
prone sites in the tourist Lum 15yea
5.7 places psum 2.00 2.00 rs 0.15 0.20 0.22 0.33 0.20 0.10 0.80
Offering diploma level
hotel management and
agriculture related
program in selected Lum 15yea
5.8 secondary schools psum 8.00 8.00 rs 0.53 0.53 0.53 0.53 0.53 2.67 2.67
Establishing the Travel
and Tours Companies in NU
5
central level by the local MBE 15yea
5.9 entrepreneurs R 8.00 40.00 rs 2.67 3.00 2.00 1.00 4.67 13.33 13.33
173.0
Total 0 11.56 12.01 11.01 10.12 13.79 56.55 57.95
6. Institutional Development Plan
Orientation program about Num 15
13 1.30
6.1 notice to process ber 1.00 0.10 years 0.09 0.09 0.09 0.09 0.09 0.43 0.43
Construction of Lum 50.0 15
1 50.00
6.2 community building psum 0 years 3.33 3.33 3.33 3.33 3.33 16.68 16.68
Old age friendly park and
Lum
religious place should be 30.0 30.00 15
psum
6.3 constructed and improved 0 years 2.00 3.00 5.00 6.00 5.00 3.00 6.00
Establish communication
.
centers for common
numb 13 26.00
information sharing 15yea
er
6.4 platform 1.00 2.00 rs 1.73 1.73 1.73 1.73 1.73 8.67 8.67
Separate authority for
monitoring and evaluation
of government works for
quality and timely Num 15yea
6.5 completion ber 1.00 15 0.60 9.00 rs 0.60 0.60 0.60 0.60 0.60 3.00 3.00
NREC-MCS-GI JV 187 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
Appropriate and optimum
use of local technologies,
local food products and
indigenous cultural lump 15
6.6 products sum 1.00 1.00 years 0.07 0.07 0.07 0.07 0.07 0.33 0.33
117.3
Total 0 7.82 8.82 10.82 11.82 10.82 32.11 35.11
7. Environment Development
Plan
Afforestation should be 15
Work 1 0.50
7.1 done (per year) 0.50 years 0.03 0.03 0.03 0.03 0.03 0.17 0.17
Plantation along the road
side and buffer zone along 15yea
7.2 the rivers work 1.00 2.00 2.00 rs 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Sufficient buffer zone
development in forest 15yea
7.3 areas work 1.00 2.00 2.00 rs 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Protect agricultural land Annu 15yea
7.4 by Laws al 15 0.50 7.50 rs 1.00 0.50 0.50 0.50 0.50 2.25 2.25
Lum 20.0 15yea
Proper zoning of the lands
7.5 psum 1.00 0 20.00 rs 1.33 1.33 1.32 1.33 1.33 6.68 6.68
Provide park and plant tree Lum 15yea
7.6 in open spaces psum 1.00 13 5.00 65.00 rs 4.33 4.33 4.33 4.33 4.33 21.68 21.68
Development of
sustainable Land use Lum 15yea
7.7 management psum 1.00 5.00 5.00 rs 0.33 0.33 0.33 0.33 0.33 1.68 1.68
Inventory of Degraded Lum 15yea
7.8 Land psum 1.00 1.50 1.50 rs 0.10 0.10 0.10 0.10 0.10 0.50 0.50
Lum
Providing seeds to farmers
psum 15yea
and establishing nurseries
7.9 p 1.00 1.00 1.00 rs 0.07 0.07 0.07 0.07 0.07 0.33 0.33
NREC-MCS-GI JV 188 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
Promotion of public lump 15yea
7.10 electric vehicles sum 1.00 0.50 0.50 rs 0.03 0.03 0.03 0.03 0.03 0.17 0.17
105.0
Total 0 7.49 6.99 6.99 6.99 6.99 34.77 34.77
8. Disaster Risk Management
Plan
Awareness campaign & Lum 15
8.1 Disaster management psum 1.00 13 0.10 1.30 years 0.09 0.09 0.09 0.09 0.09 0.43 0.43
Establishment of disaster
risk management
unit/focal
person/desk/coordinator at Num 15yea
8.2 municipal level ber 15.00 1 0.10 1.50 rs 0.10 0.50 0.10 0.50 0.20 0.05 0.05
Effective implementation
of forest management
plans as well as develop
mechanism to control
shifting cultivation or
slash burning as well as to
encourage improvised
stove (Sudhariyako chulo) Lum 15yea
8.3 system psum 1.00 1.00 rs 0.07 0.07 0.07 0.07 0.07 0.33 0.33
Promote use of organic
fertilizer and organic lump 15yea
8.4 farming system sum 1.00 13 0.10 1.30 rs 0.09 0.09 0.09 0.09 0.09 0.43 0.43
Promotion of rain water Lum 10.0 15yea
8.5 harvesting technology psum 0 10.00 rs 0.67 0.67 0.67 0.67 0.67 3.33 3.33
Managing the relief and
rescue material in each lump 15yea
8.6 vulnerable areas sum 1.00 2.00 2.00 rs 0.13 0.13 0.13 0.13 0.13 0.67 0.67
Tot 17.10 0.00 1.14 1.54 1.14 1.54 1.24 5.24 5.24
NREC-MCS-GI JV 189 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Detail Budget of Multi Sectoral Investment Plan (MSIP) 15 Years ( NRPS: Million)
Total Time 2018-19 2019-20 2020-21 2021-22 2022-23 2023-2028 2028-2033
SN Activities Unit Nos. Qty. Rate
Cost (Year) (1Year) (1 Year) (1 Year) (1Year) (1 Year) (5 Years) (5 Years)
al
9. Climatic Change Adaptation
Plan
Water recharging Lum 1.00 70 70 15 4.66 4.66 4.66 4.66 4.66 23.35 23.35
9.1 pavements psum years
Land use zoning with
buffer around the Lum 30.0 15
9.2 industrial zone psum 1.00 0 30.00 years 2.00 2.00 2.00 2.00 2.00 10.00 10.00
Promotion of energy Lum 20.0 15
9.3 efficient architecture psum 1.00 0 20.00 years 1.33 1.33 1.33 1.33 1.33 6.68 6.68
Promotion of alternative Lum 130. 130.0 15
9.4 energy psum 1.00 00 0 years 8.67 8.67 8.67 8.67 8.67 43.33 43.33
Organic fertilizer and
pesticide manufacture Lum 15
9.5 training psum 1.00 3.50 3.50 years 0.23 0.23 0.23 0.23 0.23 1.17 1.17
Control of soil erosion,
landslide and river bank
cutting through application Lum 80.0 15
9.7 of bioengineering method psum 1.00 0 80.00 years 5.33 5.33 5.33 5.33 5.33 26.68 26.68
333.5
Total 0 22.22 22.22 22.22 22.22 22.22 111.19 111.19
1469 1411.3 1052.2
Grand Total 7.90 0.00 2 1250.34 1101.33 5 1007.62 4474.41 4400.63
NREC-MCS-GI JV 190 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
8 ANNEXES
Annexes-1: DED Selection Matrix
Step I: All the projects guided by Development Plans were prioritized. These projects were
municipality level projects.
Step II: The prioritized projects were evaluated on following four criteria proposed by DUDBC:
Congruence with prevalent policies & strategies (NUP 2007, NUDS 2017 etc.)
Overall viability of the proposed project
Capacity of the proponent to implement the project, and
Benefits and positive impact of the project
Each of these four criteria is weighted equally with a maximum score of 25. Each criterion are
evaluated using different indicators and weightages. Each indicators or sub-criteria is evaluated
using rating scale from 0 to 1—where 1 denotes desired condition, while 0 denotes undesired
condition. Any other condition in between is rated using interpolation and best judgement. Value
of each indicator is then calculated by multiplying the given rating and maximum score attached
to an indicator.
Evaluation criteria
(i) Congruence (Weightage = 25)
Fit with the consistent with
Consistent with Government’s prioritized
Fit with Consistent with
activities catalytic economic
corridor Sustainable
outlined in investment areas sectors (service, Total
strategy Development
NUDS outlined in policy industry, and Value
(15) Goals (SDGs)
(2.5) and program for agriculture) of
(2.5)
2018-2019 Graduation Plan
(2.5) (2.5)
Rating Value Rating Value Rating Value Rating Value Rating Value
NREC-MCS-GI JV 191 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Rating Value Rating Value Rating Value Rating Value Rating Value
NREC-MCS-GI JV 192 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
3) Social:
Unlikely displacement of households (max rating 0.5), and households of
peripheral areas are also served by the project (max rating 0.5) = 1
Potential displacement of households (rating = 0), and households of peripheral
areas also not served by the project (rating = 0) = 0
4) Environmental:
Unlikely detrimental effect on natural resources and wildlife habitat = 1
Potential effect on natural resources and wildlife habitat = 0
5) Economic:
Potentiality to add to income from taxation, user’s fees-- leading to widening and
increase in revenue base of municipality = 1
Lacks potentiality to add to income from taxation, user’s fees-- leading to
widening and increase in revenue base of municipality = 0
5
Competitiveness score of the municipalities used for the purpose is the measure of four variables: physical,
economic, social, and institutional. Physical is measured by indicators: connectivity, and basic urban infrastructure
condition. Economic is measured by indicators: market potential, and industrial activities. Social is measured by
indicators: human development, and ethnic/cultural diversity. Institutional capacity is measured by indicators: pass
or fail in Minimum Conditions evaluated by then Local Body Fiscal Commission.
NREC-MCS-GI JV 193 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Indicators:
1) Geographical Extent
2) Population Extent
NREC-MCS-GI JV 194 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
From the above criteria, those two projects which gained the highest marks were selected as the
DED.
Each of these four criteria is weighted equally with a maximum score of 25. Each criterion is
evaluated using different indicators and weightages. Each indicators or sub-criteria is evaluated
using rating scale from 0 to 1—where 1 denotes desired condition, while 0 denotes undesired
condition. Any other condition in between is rated using interpolation and best judgement. Value
of each indicator is then calculated by multiplying the given rating and maximum score attached
to an indicator.
NREC-MCS-GI JV 195 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Hence, the upgrading of road with drainage and river training has gain the highest number due to
which they are selected as major projects. Following table shows the criteria and weightage
gained by every selected projects,
NREC-MCS-GI JV 196 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 197 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 198 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
Experience of
S.N Overall collaborative project Total
Projects Experience of IFI (8)
. Competitiveness (12) (with national agencies) Value
(5)
Benefits Including
Assets (4) Agglomeration Benefits
(13)
Rating Value Rating Value Rating Value Rating Value
0-1 0-1 0-1 0-1
Upgrading of road along with
1 provision of drainage and its 0 4 1 4 1 4 0.75 13 17.75
management
2 River training works 0 4 1 4 1 4 1 13 21
Construction and management of
3 0 4 0.8 4 0 4 0.5 13 9.7
irrigation canal
Construction of health post in every
4 0 4 1 4 0 4 1 13 17
wards
5 Afforestation and sanitation program 0 4 0.8 4 0 4 0.5 13 9.7
NREC-MCS-GI JV 200 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
List of Figures
Figure 1: Flow chart of Structure of the report................................................................................8
Figure 2: Methodological Flow Chart During IUDP Project..........................................................9
Figure 3: Spatial data of municipality...........................................................................................15
Figure 4: Changing area for forest and water bodies in three different years...............................27
Figure 5: Cross section for non- settlement , Terai.......................................................................82
Figure 6: Cross Section for settlement , Terai..............................................................................82
List of Tables
Table 1: Transformation Parameter from WGS84 Datum to Everest 1830 Datum......................16
Table 2: Ward-wise HHs and population structure in 2017 and projection (2018-2033).............24
Table 3: Land cover of Khairahani municipality...........................................................................25
Table 4: Status of disaster in Khairahani municipality..................................................................33
Table 5: Disaster calendar of Khairahani Municipality.................................................................36
Table 6: Selection criteria for suitable site for settlement.............................................................42
Table 7: Selection criteria for Landfill Site...................................................................................44
Table 8: Criteria for flood susceptibility analysis..........................................................................47
Table 9: Ward wise extent of Flood Susceptibility.......................................................................48
Table 10: Criteria for Drought Susceptibility Analysis.................................................................49
Table 11: Drought area of the Municipality..................................................................................49
Table 12: Stream Order Analysis..................................................................................................52
Table 13: Population Served by Roads..........................................................................................54
Table 14: List of the elected representatives in Khairahani municipality.....................................59
Table 15: Revenue projection for 15 years....................................................................................61
Table 16: Expenditure projection for 15 years..............................................................................62
Table 17: Strength Analysis of Khairahani Municipality..............................................................64
Table 18: Weakness Analysis of Khairahani Municipality...........................................................66
Table 19: Opportunities Analysis of Khairahani Municipality.....................................................67
NREC-MCS-GI JV 201 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 202 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
List of Photos
Photo 1: Consultation with Municipal Authorities at Khairahani Municipality............................11
Photo 2: FGD at Ward Level of Khairahani Municipality............................................................12
List of Maps
Map 1: Modified Universal Transverse Project system of Nepal.................................................17
Map 2: High Resolution Satellite Image of Khairahani Municipality...........................................18
Map 3: Digitization of Satellite Image of Khairahani Municipality..............................................18
Map 4: Land use map of Khairahani Municipality........................................................................25
Map 5: Settlement pattern in Khairahani Municipality.................................................................26
Map 6: Settlement pattern of Khairahani.......................................................................................28
Map 7: Settlement pattern of Chainpur.........................................................................................28
Map 8: Settlement pattern of Kathar Bazar...................................................................................28
Map 9: Cultivation Land pattern of Kapiva...................................................................................29
Map 10: Cultivation Land pattern of Gauwa.................................................................................29
Map 11: Cultivation Land pattern of Siddhipur............................................................................29
Map 12: Forest pattern of Kathar...................................................................................................30
Map 13: Forest pattern of Simreni.................................................................................................30
Map 14: Forest pattern of Kankaidanda........................................................................................30
Map 15: Water body pattern of Patihani........................................................................................31
NREC-MCS-GI JV 203 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
NREC-MCS-GI JV 204 | P a g e
Final Report: Preparation of Integrated Urban Development Plan (IUDP) of Khairahani Municipality
3.
NREC-MCS-GI JV 205 | P a g e