Professional Documents
Culture Documents
Field Measurement Sheet: Total
Field Measurement Sheet: Total
Project Name :
Project Location : Date:05.10.2019
Item Name :
1 0.00 cum
2 0.00 cum
3 0.00 cum
4 0.00 cum
5 0.00 cum
6 0.00 cum
7 0.00 cum
8 0.00 cum
9 0.00 cum
10 0.00 cum
11 0.00 cum
12 0.00 cum
13 0.00 cum
14 0.00 cum
15 0.00 cum
16 0.00 cum
17 0.00 cum
18 0.00 cum
19 0.00 cum
20 0.00 cum
21 0.00 cum
22 0.00 cum
Total= 0.00 cum
Site Engr. /Project Engineer Project In-charge Client Engineer Consultant Engr.
Field Measurement Sheet
Project Name :
Project Location :
Item Name :
1 0.00 sqm
2 0.00 sqm
3 0.00 sqm
4 0.00 sqm
5 0.00 sqm
6 0.00 sqm
7 0.00 sqm
8 0.00 sqm
9 0.00 sqm
10 0.00 sqm
11 0.00 sqm
12 0.00 sqm
13 0.00 sqm
14 0.00 sqm
15 0.00 sqm
16 0.00 sqm
17 0.00 sqm
18 0.00 sqm
19 0.00 sqm
20 0.00 sqm
21 0.00 sqm
22 0.00 sqm
Total Quantity = 0.00 sqm
Site Engr. /Project Engineer Project In-charge Client Engineer Consultant Engr.
Field Measurement Sheet
Project Name : Date : 05.10.2019
Project Location :
Item Name :
Length Breadth Height Total
Sl No. Description Nos. Unit Remarks
(m) (m) (m) Area(Sqm)
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
0.00 Sqm
Total Quantity= 0.00
Site Engr. /Project Engineer Project In-charge Client Engineer Consultant Engr.
Field Measurement Sheet
Project Name : Date : 11.10.2019
Project Location :
Item Name :
1 15 0.00 cum
2 4 0.00 cum
3 4 0.00 cum
4 5 0.00 cum
5 1 0.00 cum
6 1 0.00 cum
7 1 0.00 cum
8 1 0.00 cum
9 1 0.00 cum
10 1 0.00 cum
11 1 0.00 cum
12 1 0.00 cum
13 1 0.00 cum
14 5 25.06 0.00 cum
15 1 20.18 0.00 cum
16 1 24.24 0.00 cum
17 1 15.29 0.00 cum
18 1 72.53 0.00 cum
Total= 0.00 cum
Deduction Pile Cap Casting Quantity= 1080.98 cum
Total= -1080.98
Sand filling Pile Cap top to PL Grid-A- M /1-7 1 55.225 42.45 1.425 3340.63 cum
Sand filling Pile Cap top to PL Grid-F- M /7-9 1 31.914 5.825 1.425 264.91 cum
Total= 2524.56
Deduction Grade Beam Casting Quantity= 168.80 cum
Deduction Short Column Casting Quantity= 78.98 cum
Total Quantity = 2276.78 cum
Representative Signature: Client/Consultant Representative Signature:
Site Engr. /Project Engineer Project In-charge Client Engineer Consultant Engr.
Field Measurement Sheet
Site Engr. /Project Engineer Project In-charge Client Engineer Consultant Engr.
Field Measurement Sheet
Project Name :
Project Location :
Item Name :