Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

E17 E16 E15 E14 E13 E12 E11 E10 E9-1 E9 E9-2 E8 E7 E6 E5 E4 E3 E2-1 E2 E1-1 E1

SHOP DRAWING
GSV3 GSV3 GSV3 GSV3 GSV3 GSV3 GSV3

PROJECT TITLE
M

ADDIS ABABA BOLE INTERNATIONAL AIRPORT


F&B F&B

DEPARTURE GATE LOUNGE OWNER


L

SECURITY CHECK DEPARTURE CONCOURSE

K
AUTO WALK MS6

SPR

CLEANER
FFL= +7782
SFL= +7732
CM1 SP
M/V CW1 FFL= +7782 DATA
ST10 FFL= +7832
SFL= +7732 FFL= +7832
FFL= +7832 SFL= +7732
MALE TOILET CS SP SFL= +7782
SFL= +7732 CS FRB TD FEMALE M/V PP CS FRB
M/V PP
CS FRB FFL= +7782 TOILET UTILITY M/V PP
M/V PP FFL= +7732 SFL= +7732 FFL= +7832
CM1 CSB

ALV1
SFL= +7732 SFL= +7732
WCS -
M/V BCON
M/V CW1
MAR CSB
M/V PP
FFL= +7782

FFL= +5222
SMOKING LOUNGE TOILET 6 SFL= +7732
CM1 CSB
FFL= +7832
SFL= +7782
CS FRB
M/V CW1
SFL= +5172 M/V PP
CS FRB ELECTRICAL
M/V PP INVALID RM. PARENT RM. ROOM
FFL= +7782 FFL= +7782 FFL= +7832
SFL= +7732 SFL= +7732 SFL= +7782
CM1 CSB CM1 CSB CS FRB
M/V M/V PP

J
M/V CW1 CW1

20mm THK POLISHED


GRANITE DUCT COVER
(REMOVABLE)

ETHIOPIAN AIRPORT ENTERPRISE


DATA ELECT'L
UTILITY
FFL= +7832

CONTRACTOR
ROOM FFL= +7832 FFL= +7832
FFL= +7832 SFL= +7732 SFL= +7732 SFL= +7732
CS FRB FRB
SFL= +7732 CS MAR CSB
M/V PP M/V PP
CS CSB M/V PP
M/V PP

EY PLAN H

PARENT RM.
FFL= +7782
SFL= +7732
CLEANER
FFL= +7782
INVALID RM.
FFL= +7782
SFL= +7732

SCALE NTS.
CM1 CSB CM1 CSB
M/V CW1
SFL= +7732 M/V CW1
CM1 CSB
M/V CW1

FFL= +7732
SFL= +7732
WCS -
M/V BCON

TD
TOILET 7

G FEMALE
MALE
TOILET
TOILET
FFL= +7782 FFL= +7782
SFL= +7732 SFL= +7732
CM1 CSB CM1 CSB
M/V CW1 M/V CW1

CHINA COMMUNICATIONS CONSTRUCTION COMPANY (LTD)


F

CHECKED BY DU ZHI QIANG


APPROVED BY SHI LIN Charles

E ENGINEER

E12 E11

GSV1
D

GSV1
Aéroports de Paris
C

CHECKED BY

GSV1
B

GSV1
FOR ENGINEER
A

APPROVAL BY

E2 E1

FOR ENGINEER
SHS
PRINCIPAL CONSULTANT
SHS 03 SHS 03 SHS 03 SHS 03 03
1 GATEWAY DRIVE, #21-01
WESTGATE TOWER
GP1 SINGAPORE 608531
TEL: 65 65475080 FAX: 65 65420406

PROJECT DIRECTOR LEE NGAI HUNG


TECHNICAL DIRECTOR ANG LEOW LIM
SNR PRINCIPAL ARCHITECTURAL ASSOCIATE HAN SU LENG
DESIGN REPRESENTATIVE

BC01

SMOKING LOUNGE SHS 03

GP1 FFL= +7832


SFL= +7732
MAR ACC
M/V PP
CONSTRUCTION
BC01 NOTES:
1) All required cutting A
REV.
2018-01-09
DATE
ISSUED FOR APPROVAL
DESCRIPTION
and patching on
concrete and block CP02
works (e.g. SUPERSTRUCTURE-INTERIOR DESIGN
concealed conduits,
J GP1
SHS MEP fixtures and KEY PLAN

03 fittings) shall be in
SHS 03 SHS 03 SHS 03 SHS 03
SHS 03
accordance with
N
final and approved
MEP drawings. T1

Refer to MEP final MAIN TERMINAL

LEGEND: and approved


2-HR FIRE RATED WALL drawings for exact
location of such
1-HR FIRE RATED WALL cuttings.
JOB TITLE :

NORMAL CHB WALL 2) Exact floor drain DEVELOPMENT OF ADDIS ABABA BOLE INTERNATIONAL AIRPORT
ETHIOPIA, AFRICA
locations shall be in TERMINAL 2 EXPANSION
BC01 STIFFENER accordance with DRAWING NO : REV.
SMOKING LOUNGE approved drawings. AA/BOLE/SH/E/D/03-02
02 STIFFENER SETTING OUT PLAN BC02 STIFFENER Concrete removal
DRAWING TITLE :

S
O
N
P
FA
E
M
LG
N
S
U
O
E
LTIR
G
U
K
N
IGE
E/D/03-02 SCALE 1:75 MTS. and penetrations DEPARTURE FLOOR (GRID E11~E12/J)
BC03 STIFFENER
shall conform to
SIGN BAR
SHS 02 STEEL COLUMN MEP approved ARCHITECTURAL
drawings. STRUCTURURAL
RHS 03 STEEL COLUMN ELECTRICAL
MECHANICAL

NOTES LEGEND DRAWING REFERENCES DRAWN BY MYLA GADOR

BARE CONCRETE 300 x 300 x 9 THK POLISHED HOMOGENEOUS DRAWING NO. REV. DATE CHECKED BY BEN CARAS
FFL ±0000 - FINISHED FLOOR LEVEL BCON SP SKIM COAT & PAINTING CW1 VL VINYL TILES
PORCELAIN WALL TILES IC INSPECTION CHAMBER CPGairport/AA/BOLE/AF/03-02 E1 2017/05/05 EDBERT Z. MOSTOLES
1. FOR MEP FIXTURES AND FITTINGS REFER TO MEP DRAWINGS. SFL -0050 - STRUCTURAL FLOOR LEVEL APPROVED BY
CS CEMENT SAND SCREED 100 SQUARE x 50 DEEP x 0.7 THK MFB 600 x 600 x 19 THK MINERAL
ACC SAP SKIM COAT & ANTI-DUST PAINTING FIBRE BOARD CEILING POWER SOCKET OUTLET CPGairport/AA/BOLE/AC/03-02
2. SUSPENSION SYSTEM TO SUBMIT SAMPLE FOR APPROVAL. FLOOR FINISH - CM1 MFB - CEILING FINISH ALUMINIUM CELL CEILING E1 2017/05/05 SCALE: 1:75MTS
CEMENT SAND SCREED WITH LIQUID
VENTILATION - A/C CW1 - WALL FINISH CSA 9 THK CALCIUM SILICATE BOARD WITH SUPPORT GD GLASS SWING DOOR ACP 4 THK ALUMINIUM COMPOSITE CPGairport/AA/BOLE/AF/DFS/SH/03-02 A 2016/09/02 PRINTED ON:
3. ALL FIXTURES TO SUBMIT SAMPLE FOR APPROVAL. APPLIED ANTI-DUST COATING CSB PANEL CLADDING SWITCH SOCKET OUTLET
FRAMING AND FINISHED WITH EMULSION PAINT CPGairport/AA/BOLE/FIRE/FC/03-01 E 2017/05/05
4. ALL DOOR DETAILS TOGETHER WITH ITS IRONMONGERY & GRILLES WILL BE IN SEPARATE R.C. STRUCTURE CM1 300 x 300 x 12 THK NON-SLIP HOMOGENEOUS MD STEEL DOOR Design Basis Sheet No.
GSV1 6 THK HEAT-STRENGTHENED
PORCELAIN FLOOR TILES PP PLASTER WITH EMULSION PAINT COLOUR-TINTED GLASS TOILET IDENTIFICATION SIGN
DRAWING SUBMITTAL. BLOCKWALL CG CORNER GUARD ( Ø15 SS. ROD OF HT. 900 )
+ 1.52 THK PVB LAYER + 6 THK CLEAR
WCS WATERPROOF CEMENT SAND SCREED PLASTER WITH LIQUID APPLIED ANTI-DUST FLOAT GLASS
SOP PA N/V NATURAL VENTILATION
TILE SETTING POINT
STORM PROOF ALUMINIUM LOUVRES IN PVDF
PAINTING
ALV1 STORM PROOF ALUMINIUM
02
ALV1 MAR 20MM THK. POLISHED MARBLE M/V MECHANICAL VENTILATION LOUVRES IN PVDF FINISH
FINISH

You might also like