Project Name - Up-gradation to 4-Lane with Paved Shoulder of Jammu-Akhnoor road section of NH-144A from Canal head (Km 0.800) to Ganesh Vihar (Km 6.000) of 5.2 Km length in
the state of Jammu and kashmir to be executed on EPC basis (Pkg-II).

Client : NHIDCL

Contractor : SP. SINGLA CONSTRUCTION PVT LTD.

Authorty Engneer : TPF GETINSA EUROESTUDIOUS SL, in association with Segmental Consulting & Infrastructure Advisory (P) Ltd.
Distance from Hindrance Effective
S. NO Chainage Side Description of Hindrances Present Status Remarks
Center Line Length length

910 To 960 LHS 5.00 Boundary Wall 50.00 50.00 Assessment Under Process

Machine is Being Dismantled ,land to be


3 1618 To 1658 LHS 9.00 Himalaya Timbers 40.00 40.00 Machine Dismantled on 11.06.2020
provided by administration for shifting

4 1769 To 1784 LHS 13.20 Temple 15.00 To be Shifted by Contractor __

5 1786 To 1825 LHS 11.00 Bharat Petrol Pump 39.00 To be cleared Dismantling in Progress

6 1825 To 1825 LHS 11.50 Timber shop of Manohar Lal 0.00 Cleared Cleared on 10.06.2020
140.00
7 1844 To 1860 LHS 6.00 Patel House 15.70 To be cleared Dismantling in Progress

8 1860 To 1876 LHS 13.00 Workshop 15.80 To be cleared Dismantling in Progress

9 1888 To 1908 LHS 14.00 Timber shop 20.00 To be cleared __

10 2626 To 2626 LHS 9.90 Boundary Wall of Subhash Auto Mobile 0.00 0.00 Cleared Cleared on 10.06.2020

11 2697 To 2709 LHS 5.10 Structure of Triple" s Farms 11.50 To be cleared Reassessment under process
60.00
12 2750 To 2755 LHS 10.80 Gate of Triple" s Farms 5.00 To be cleared Reassessment under process

16 2932 To 2932 LHS 10.50 Structure of Vijay Timber 0.00 0.00 Cleared Cleared on 08.06.2020

18 3016 To 3024 LHS 10.00 Structure of Lehra Funiture Works Building 8.00 20.00 To be cleared Reassessment under process

19 3154 To 3162 LHS 12.00 Structure of Thoru Ram 8.00 Partially cleared Dismantling in Progress
60.00
20 3196 To 3212 LHS 9.20 4 Nos Shops of Vishal Tyre 16.00 Partially cleared Dismantling in Progress

22 3930 To 3940 LHS 13.00 Structure Of RamLal 10.00 To be cleared Dismantling in Progress

23 3940 To 3965 LHS 11.00 Structure 25.00 To be cleared Dismantling in Progress

24 3997 To 4000 LHS 9.50 Structure 3.00 To be cleared Dismantling in Progress


25 4010 To 4013 LHS 9.00 Structure 3.00 To be cleared Dismantling in Progress

26 4020 To 4032 LHS 2.50 Structure 12.00 To be cleared Dismantling in Progress

27 4040 To 4045 RHS 9.50 Temple 5.00 To be cleared Dismantling in Progress

28 4052 To 4074 RHS 7.50 Structure 22.00 To be cleared Dismantling in Progress

LHS &
29 4035 To 4080 0.00 Structure 45.00 To be cleared Dismantling in Progress
RHS
LHS &
30 4115 To 4140 0.00 Structure 25.00 To be cleared
RHS

31 4160 To 4180 RHS 9.00 Structure 20.00 To be cleared

32 4250 To 4260 RHS 10.00 Structure 10.00 To be cleared

33 4325 To 4355 LHS 0.50 Structure 30.00 To be cleared

LHS &
34 4490 To 4510 0.00 Structure 20.00 To be cleared
RHS

35 4490 To 4508 RHS 6.00 Structure 18.00 To be cleared


650.00
36 4520 To 4535 LHS 9.00 Structure 15.00 To be cleared

LHS &
37 4510 To 4558 0.00 Structure 48.00 To be cleared
RHS

EXISTING ROAD PORTION

38 4055 To 4060 LHS 3.00 Shop 5.00 To be cleared Existing Road

39 4090 To 4114 LHS 2.20 4 Nos Shops 23.50 To be cleared Existing Road

40 4135 To 4165 LHS 5.60 Structure of Green Chilly Rest. 30.00 To be cleared Existing Road

41 4165 To 4175 LHS 7.70 Iseland & Boundary Wall of Petrol Pump 10.00 To be cleared Existing Road

42 4220 To 4220 LHS 2.40 4 Nos Shops of Mahindra First Choice 0.00 cleared cleared

43 4265 To 4300 LHS 11.90 T.N. Gupta Timber 35.00 To be cleared Existing Road

44 4355 To 4400 LHS 9.10 Boundary Wall Suraj Palace 45.00 To be cleared dismantling in Progress

45 4448 To 4469 LHS 7.10 4 Nos Shops of Vikash Motors 21.00 To be cleared Existing Road

46 4495 To 4500 LHS 3.70 Gate & Wall of K.C. Emporia 5.00 To be cleared Existing Road

48 4570 To 4595 LHS 9.70 Iseland & Boundary Wall of Petrol Pump 25.00 To be cleared Existing Road

49 4595 To 4607 LHS 6.30 Structure 12.00 To be cleared Existing Road


50 4615 To 4636 LHS 13.60 Boundary Wall & Structure of Shish Mahal Banquet Hall 21.00 30.00 To be cleared

51 5035 To 5060 LHS 17.60 Boundary Wall 25.00 30.00 To be cleared

53 5300 To 5312 LHS 7.70 Leather Factory 12.00 30.00 To be cleared Dismantling in Progress

54 5462 To 5506 LHS 5.50 Boundary Wall & Residence of PHE Tubewell Station Muthi 43.50 To be cleared

55 5506 To 5516 LHS 4.50 Structure Being of Sadotra Hardware Store 10.00 90.00 To be cleared Dismantling in Progress

56 5525 To 5545 LHS 8.20 Temple & one Room 20.00 To be cleared

58 5792 To 5804 LHS 5.00 Shop of Sharma Cement Traders 12.00 To be cleared

59 5854 To 5870 LHS 4.10 Structure of Sharma Cement Store, Ramlal & Bhagat Ram 16.00 110.00 To be cleared

60 5893 To 5898 LHS -2.30 Shop 5.00 To be cleared

TOTAL HINDERANCE & EFFECTIVE LENGTH 931.00 1310.00