Job Safety Analysis Sheet

Job Description:
To carried out scaffolding erection, modification and dismantling for JSA Ref. No. EF 1931-O&G-JSA-02
civil work including transportation of scaffolding materials. (REV-00, 22.2.20)

Work Area / Equipment:


KOC
Facility: NEW NEW GATHERING CENTRE GC-32 Permit No.
Emergency-160
GC-32 AREA-1 Date:
90030980 (PIL)
Personal Protective Equipment & Tools: Hard Hat, Safety Shoes, Safety Goggles/Face shield, Hand Gloves, Overall with
reflective stripes, Hand tools & Power tools
Sequence of
Potential Hazards Precautions
Basic Job Steps
Pre - work
 Project HSE Induction and EOD training other job related
Non-compliance with KOC awareness training.
HSE Procedures  Permit to Work and Excavation Notification controls in place.
(Confined Space Permit for all excavations >1.2m).
 Pre-task TBT relevant to job hazards for every activity daily.
 Project Trainings & Safety induction / Visitor induction shall be
attended
Inexperienced / New  Ensure Heavy equipment operators, riggers and flagman
Employees/ Visitors completed third party competency training.
 Only trained and competent personnel are allowed to perform
the activities.

 Ensure all equipment are inspected and certified as per KOC.


Equipment Failures
SA.013 Temporary Mobile Equipment Procedure.

 Ensure driver of the vehicle have completed Defensive Drive


Training by the Contractor.
Non-defensive Driving  Strictly follow Company driving procedures, Kuwait Ministry of
Interior Traffic Regulations.
 Comply with Company Safe Driving procedure HSEMS-SA-016
 Seat belts worn at all times by all personnel.
Pinch points
 Unloading of loads must be carried out properly considering all
safety aspects.

 Before hauling a load make a quick walk around the vehicle to


assure all tool boxes are closed and that the load is secure.
 All loads hauled on vehicles must be surely tied down with
Dropped material
approved rope, straps or chains.
When hauling a load check to be sure the load stays secure
while under way. It’s necessary to pull over and re-tighten your
load periodically.

 Do not stand below or near the suspended load.


 Close supervision by a competent rigging supervisor during the
lifting operations.
 Ensure proper positioning of body parts during slinging avoid
exposing in the line of fire.
Personnel injury  Ensure emergency first aid facilities are available with the
team and presence of qualified first aider at all times whilst
works is ongoing.
 In case of medical emergency call KOC Emergency number
#160.

Damage of equipment  Conduct regular visual inspection of all lifting gears and
mechanism of crane prior to start any lifting operation by a
competent rigging supervisor/foreman.
 Provide adequately strong and long tag lines at both ends of
Page 1 of 3
the load.

 Workers assigned in working at height activities must complete


the awareness training Fall Arrest and PPE’s.
 Make sure workers to used full body harness and maintaining
100% tie-off while on top of the car parking roof or scaffolding
platform, if needed provide retractable devices for anchorage
of FBH.
Personnel Fall from Height  Make sure not to overextend body parts outside of the
guardrails of scaffolding platforms.
 Ensure all required PPE are complied with prior to start the
activity.
 In case of medical emergency call KOC Emergency number
#160.
Conduct Tool Box Talk and brief about the job hazards.
 Ensure safe access way to work location.
Poor Access & Egress
Ensure safe access way to scaffolding platform, ladder must be
firmly secured from the top, middle and bottom.
Work at Height  Ensure only complete scaffolding platforms with up to date
inspection by competent scaffolding supervisor/inspector with
green tag are to be use.
 Avoid using mobile scaffolding platforms in uneven or soft
Incomplete scaffolding ground.
platforms  Ensure scaffolding platforms are being erected by competent
scaffolders with the closed supervision of scaffolding
supervisor.
 Ensure scaffolding materials to be used are free of damaged
and as per standards.
 Hand tools to be tied or secured with lanyards to structure or
person.
 Ensure roofing materials area properly secured or fasten prior
Drop Objects
to release from handling during installation.
Install relevant warning signage’s and barricade around the
work area.
 Provide guardrail & toe board to prevent falling of tools /
objects.
 Don’t keep the unnecessary materials on the scaffold platform.
 Hand tools to be tied with permanent structure or person.
 If required, barricade the area during erection work.
Fall of objects / Tools.
 Materials to be lifted up by means of “Gin Wheels” or through
proper access.
 Do not throw the materials from top to bottom or vice versa.
 Barricade the area around the scaffold to prevent unauthorized
entry.
 The Scaffold erector must use Safety Harness (double lanyard)
Erection, Accidental Fall of Person to prevent accidental fall attached to lifeline, wherever
Dismantling & Use of applicable.
Scaffolding  Ensure the scaffold is not blocking the access to the work
Blocking access location.
 Ensure scaffold does not block emergency equipment.
 The scaffold must be inspected, certified & tagged by the
competent person confirming its suitability.
Unstable Scaffold
 Scaffold to be made as per approved design drawings.
 Damaged scaffold materials to be removed from service
 Use ladder of adequate length, should extend at least 1 meter
from landing platform.
 Ladder to be fixed to the scaffold rigidly, inspected weekly and
Unsafe Access to Scaffold
color coded.
 Ladder to be installed at an angle of 75 degrees.
 Access to ladder not to be blocked by tools, materials etc.
 All scaffold to be re-inspected every 7 days.
Old Scaffolding Doubtful Integrity Do not use any scaffold if it does not have valid inspection tag
attached.

 Ensure the work place is maintained clear of debris, waste and


Post Work Personnel Injury due to
other rubbish and make the place clean and tidy.
poor housekeeping

Page 2 of 3
 Close the trench, backfill & compact the area.
Trenches left open for
 Close the permit after making the site clean & tidy.
extended period
Had barricade / signage in English/Arabic.

 Drink water frequently to avoid dehydration (during both


summer and winter)
 Working schedules to avoid hottest times of day, with regular
Heat Stress / Extreme Cold rest/rehydration breaks (10-15mins/hr)
 Ensure emergency first aid facilities are available with the
team and presence of qualified first aider at all times whilst
works is ongoing.
 In case of medical emergency call KOC Emergency number
#160.
Additional Hazards
 Do not touch any company assets without proper authorization.
 In case of strange objects are found, immediately stop the
Un-identified Objects
activity, evacuate all personnel from the work location and
exposure
inform Company representative or call KOC safety / EOD as
appropriate at 160
 Awareness training on dangerous and poisonous animals
Biological hazards, animal
 Do not feed stray animals / wild life. Ensure buddy system is
bites
implemented.
JSA Done By Controlling Team: MP-III, TEAM-XI
Name:
Permit Applicant /
Controlling Team /
KOC No. Signature:
Asset Owner

Name: Controlling Team: MP-III, TEAM-XI


JSA Reviewed By
Permit Issuer
KOC No. Signature:

Page 3 of 3