his fact sheet addresses common questions about the anaerobic digestion system that is being
This fact sheet addresses common questions about the flow equalization system
incorporated in the proposed project.
that is being incorporated in the proposed project.
stored for a maximum of 72 hours If so, is there any noise prevent unauthorized access. The
and designed for a 2-year 24-hour control provided? tank will be ventilated during use to
rain storm event. The largest equipment associated prevent the buildup of gases
with the flow equalization tank associated with sewage and to
What Process Modifications includes the jet mixing pump system control the fugitive odor emissions.
will be made? which is entirely within the interior
The existing Franklin WRF does not of the tank and includes four 200 HP
currently have any flow equalization pumps. The pumps will be
facilities in use. This will be a new submerged in the wastewater and
process to be added to the plant. will not generate noise that will
This will include a new 10 million propagate beyond the plant
gallon concrete storage tank that property lines. The odor control
will be partially above ground and system for the tank will be located
partially below ground. The tank will outdoors adjacent to the
have a dome roof to ensure fugitive equalization tank and will include a
odors are captured from the stored centrifugal fan for conveyance of the
liquid. When in use the, the air. This odor control system will only
ventilated air from the equalization be in operation when the tank is in
tank will be treated in an odor operation and will generate minimal
control system. Once the rain event noise.
passes and peak flow rates subside,
the tank will be drained back to the Will the process
plant for treatment. modification change the
look and feel of the site?
Is the process a potential The new equalization tank will be
odor source? Is the process partially above ground. Several
odor controlled? existing unused structures will be
Flow equalization storage is a demolished and the equalization
potential odor source as the liquid tank will be constructed in the
has yet to receive biological location where the old structures
treatment. Although in the case of were removed. The equalization
the Franklin facility, the liquid will be tank will be taller than many of the
screened and de-gritted which will existing structures at the facility with
significantly reduce the potential for an overall height above the ground
odors. surface of approximately 45 feet.
The new equalization tank at the The height of the tank is necessary in
Franklin WRF will have a dome roof order to achieve the required 10
to enclose the stored wastewater million gallons of volume and to
and capture odors. When in use, the physically fit within the available real
ventilated air from the equalization estate at the facility.
tank will be treated in an odor Will the process
control system that utilized an modification change the
activated carbon media to absorb safety of the site?
odors. The tank and its contents will not
pose a safety risk to the surrounding
Does the process include
equipment that has the community. Access to the tank will
potential to create noise? be restricted and controlled to