Professional Documents
Culture Documents
Yasser Elfahham, PHD: Chapter (1) Introduction
Yasser Elfahham, PHD: Chapter (1) Introduction
Yasser Elfahham, PHD: Chapter (1) Introduction
By
Yasser Elfahham, PhD
Lecturer, Alexandria University, Structural Engineering Dep.
E- MAIL: yelfahham@yahoo.com
1 Dr.Yasser Elfahham
COURSE DESCRIPTION & TOPICS:
1) Introduction to Construction Management
2) Project Planning & Scheduling
3) Critical Path Method (CPM)
4) Resource Management
5) Cost Management
6) Contracting
2 Dr.Yasser Elfahham
Course Resources:
3 Dr.Yasser Elfahham
ادارة ﻣﺸﺮوﻋﺎت اﻟﺘﺸﯿﯿﺪ
On budget Minimize
7 Dr.Yasser Elfahham
Impact of poor Project Management
Bad quality products
Project failure (e.g. pavement settlement)
Rework
Loss of project scope
Loss of information
Delays and cost overruns
Higher Disputes between construction parties
Confusion and conflicts
8 Dr.Yasser Elfahham
Impact of poor Project Management
9 Dr.Yasser Elfahham
?What is a project
•A project is a temporary endeavor undertaken to create a unique product or service.
)(PMBOK
•The project has a definite beginning and end.
•The project is unique
اﻟﻤﺸﺮوع ﻋﺒﺎرة ﻋﻦ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻻﻟﻤﮭﺎم و اﻷﻧﺸﻄﺔ اﻟﺘﻲ ﯾﺘﻢ ﺗﻨﻔﯿﺬھﺎ ﻓﻲ وﻗﺖ ﻣﺤﺪد و ﺗﻜﻠﻔﺔ ﻣﺤﺪدة
ﺑﻤﻮاﺻﻔﺎت ﻣﺤﺪدة ﻟﺘﺤﻘﯿﻖ ھﺪف ﻣﻌﯿﻦ و ﯾﺴﺘﺨﺪم ﻓﻲ اﻟﺘﻨﻔﯿﺬ ﻋﺪة ﻣﻮارد .واﻟﻤﺸﺮوع ﻋﺒﺎرة ﻋﻦ ﻋﻤﻞ ﻣﺆﻗﺖ ﻟﺔ
ﺑﺪاﯾﺔ وﻧﮭﺎﯾﺔ وﻛﻞ ﻣﺸﺮوع ﯾﺨﺘﻠﻒ ﻋﻦ ﻏﯿﺮة ﻣﻦ ﺣﯿﺚ اﻟﺸﻜﻞ واﻟﺤﺠﻢ واﻷھﺪاف واﻟﺘﻜﺎﻟﯿﻒ وﺧﻼﻓﺔ
أﻣﺜﻠﺔ ﻟﻤﺸﺎرﯾﻊ اﻟﺘﺸﯿﯿﺪ:
أ .ﻣﺸﺮوع إﻧﺸﺎء ﻣﺤﻄﺔ طﺎﻗﺔ ﻛﮭﺮﺑﺎﺋﯿﺔ
ب .ﻣﺸﺮوع إﻧﺸﺎء طﺮﯾﻖ أو ﻛﻮﺑﺮي
ج .ﻣﺸﺮوع إﻧﺸﺎء ﻗﺮﯾﺔ ﺳﯿﺎﺣﯿﺔ ﺑﮭﺎ ﻋﺪد ﻣﻦ اﻟﺸﺎﻟﯿﮭﺎت و اﻟﻤﺴﺎﺣﺎت اﻟﺨﻀﺮاء واﻟﻄﺮق و اﻟﺨﺪﻣﺎت اﻷﺧﺮي
?What is an activity
اﻟﻨﺸﺎط ھﻮ ﺟﺰء ﻣﻦ اﻟﻤﺸﺮوع وھﻮ ﻋﺒﺎرة ﻋﻦ ﻋﻤﻞ ﻣﻌﯿﻦ ﯾﺘﻢ إﻧﺠﺎزة ﻓﻲ اﻟﻤﺸﺮوع وﯾﺤﺘﺎج ﻟﻮﻗﺖ
وﻣﻮارد وﺗﻜﻠﻔﺔ
أﻣﺜﻠﺔ ﻋﻠﻲ اﻷﻧﺸﻄﺔ:
اﻟﺤﻔﺮ – اﻟﺮدم – اﻟﺨﺮﺳﺎﻧﺔ اﻟﻤﺴﻠﺤﺔ – اﻟﻤﺒﺎﻧﻲ – اﻷرﺿﯿﺎت – اﻟﺒﯿﺎض ...... -
10 Dr.Yasser Elfahham
The Relationships Among Portfolios, Programs, and Projects
Middle Mang.
12 Dr.Yasser Elfahham
Responsibilities of project manager ﻣﺴﺆﻟﯿﺎت ﻣﺪﯾﺮ اﻟﻤﺸﺮوع
The Project Manager is the person how leads and manages the project
team to achieve the project objectives, with authority and responsibility
to run the project on a day-to-day basis.
He must have the technical and Communication skills needed. The
following are key Responsibilities and skills of project manager .
14 Dr.Yasser Elfahham
Types of construction projects
1. Residential Building
Include: homes, apartments, and low and high-rise buildings
Most common type of construction
Funded by individual owners for their own use or by developers for profit
The builder or the owner can design
2. Non-Residential Building
Include: commercial, educational, administrative, Health care, and industrial
Buildings.
Higher cost of construction
The contractors of such projects may be specialized in only that type of building.
15 Dr.Yasser Elfahham
Building Construction
Bridge Construction
16 Dr.Yasser Elfahham
Circular tank
Construction
Pipeline Construction
17 Dr.Yasser Elfahham
Characteristics of Construction industry
Projects are large and consume much time, money, and
resources.
Projects are unique.
Organizations change from Project to Project
On-site work stations are not permanent (location)
Operations are conducted outside and thus subject to
Weather
Uncertainty in Project cost and duration
High risk
Construction is different from Manufacturing
18 Dr.Yasser Elfahham
Project parties or stakeholders
The main participants (stakeholders) of project are:
1. Owner
2. Contractor
3. Consultant (Engineer)
A Conflict of interests exists between owner and Contractor
Other stakeholders include:
1. Vendors
2. Users
3. Bank
4. Manufacturer
5. Purchasing
6. Accounting
19 Dr.Yasser Elfahham
1.The Owner:
The person how owns and finances the project.
His objective is to finish the project as soon as possible, with target cost
and best quality.
Owners could be Public or private
Responsible for selecting qualified designers, consultants, and
contractors
22 Dr.Yasser Elfahham
Project Life Cycle (Bar chart)
Phase Time
Feasibility study
Design
Bidding & awarding
Construction
Turnover
Project Life Cycle
Phase-to-Phase Relationships
The project phases are sequential process designed to ensure proper control of the
project.There are two types of relationships:
1) Sequential relationship.
In a sequential relationship, a phase starts only when the previous phase is complete.
2) overlapping (concurrent ) relationship.
In an overlapping relationship, a phase starts prior to completion of the previous
one.
23 Dr.Yasser Elfahham
Invitation To Tender
ﯾﺘﻀﻤﻦ اﻹﻋﻼن ﻋﻦ اﻟﻤﻨﺎﻗﺼﺔ ﻋﺪة ﻣﻌﻠﻮﻣﺎت ﻣﺜﻞ:
.1أﺳﻢ اﻟﻤﺎﻟﻚ
.2وﺻﻒ اﻟﻤﺸﺮوع وﻣﻮﻗﻌﺔ
.3ﻣﺪة اﻟﺘﻨﻔﯿﺬ اﻟﻤﻄﻠﻮﺑﺔ
.4ﻣﻜﺎن ﺑﯿﻊ ﻛﺮاﺳﺔ اﻟﺸﺮوط وﺳﻌﺮھﺎ
.5ﻗﯿﻤﺔ اﻟﺘﺄﻣﯿﻦ اﻻﺑﺘﺪاﺋﻲ
.6ﻗﯿﻤﺔ اﻟﺘﺄﻣﯿﻦ اﻟﻨﮭﺎﺋﻲ
.7ﻣﺤﺘﻮﯾﺎت اﻟﻤﻈﺮوف اﻟﻔﻨﻲ واﻟﻤﺎﻟﻲ
.8ﻣﻮاﻋﯿﺪ اﻟﻤﻨﺎﻗﺼﺔ :اﻻﺳﺘﻔﺴﺎرات – ﺗﻘﺪﯾﻢ اﻟﻤﻈﺎرﯾﻒ – ﻓﺘﺢ
اﻟﻤﻈﺎرﯾﻒ – إﻋﻼن اﻟﻔﺎﺋﺰ.