Alpha ECC - Dong Xuyen Port

Consortium
PROJECT REFERENCE LIST

ALPHA ECC - DONG XUYEN PORT CONSORTIUM


REFERENCE COMPLETED PROJECT
Contractor – End user ADANI PHUOC MINH WIND POWER CO., LTD
Location -Project In Phuoc Minh Commune, Thuan Nam Dist., Ninh Thuan Province
DXP Ref -Year 007/2021/KD-HĐDV/ADANI-DXP
Scopes Full Package of Installation for 08 sets of WTG
Size &Weight

We are one team

in Adani Phuoc Minh Wind Power Project

YOUR SATISFACTION – OUR TARGET

PAGE: 1/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

WTGS Foundation Survey

PAGE: 2/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

TBM before start Works

PAGE: 3/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

Installing and Aligning TBR

PAGE: 4/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

Installing PPM

PAGE: 5/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

Installing door sections

PAGE: 6/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

Installation of Sections

PAGE: 7/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

Top section and Nacelle installing


PAGE: 8/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

HUB installing

PAGE: 9/10
Alpha ECC - Dong Xuyen Port
Consortium
PROJECT REFERENCE LIST

Blade installing

PAGE: 10/10