SCIENCE AND TECHNOLOGY:

APPLICATION OF BIM IN DESIGN 


TEDI has successfully developed the implementation plan and solutions on application of the
Building Information Modeling (BIM) in design, with the following contents:
CONTEXT AND OBJECTIVES ON APPLICATION OF BIM IN TEDI

Meet the inevitable technological trend Increase productivity and design quality

Participate in the first stage

Design Construction Supervision

BUILDING SOLUTIONS AND IMPLEMENTATION PLANS OF BIM


 Implementation solutions:
 Information and communication solutions.
 Financial solutions.
 Establishment of implementation organization and strategy for human resource
training.

 Implementation plan for the period of 2017-2021:


 Investment in equipment and BIM software suitable to the design of transport
projects.
 Organization of human resource to implement and develop a basic and in-depth
training plan on BIM.
 Updating policy mechanisms, technical standard and specification systems related to
the application of BIM in design.
 Building a standard data library system.
 Building a design process and measurement of volume of BIM model.
 Pilot application for some typical projects.
 Summarizing the BIM-applied projects to: Evaluate the project's effectiveness,
finalizing technical and financial procedures for the application of BIM model in a
unified way for management, design and tendering at TEDI.
SCIENCE AND TECHNOLOGY:
 APPLICATION OF BIM IN DESIGN 

APPLICATION OF BIM SOLUTION FOR HOANG VAN THU BRIDGE PROJECT

 Items of BIM design


 Hoang Van Thu main bridge:
- It is designed in the shape of arch bridge with three spans in the middle; of which, two
side spans are structure of reinforced concrete arch, main arch is the structure of steel
pipe filled with concrete.
- Span layout: (45 + 200 + 45) m, total length of the bridge: L=290m.
- The width of cross-section of main bridge: B = 33.5 m.
 Southern approach bridge:
- Span layout: Single span 34,95 using pre-cast Super T beam, two branches of approach
bridge with span diagram: (3x35)+(3x35)+(3x35+32)+(26,17+34,94+2x35)m, length L
= 479.06 m using hollow beam casted on the fixed falseworks.
- Bridge cross-section width: B=12,6m.
 Northern approach bridge:
Main approach bridge:
- Span layout: (39,15+2×40) + (2×40+30+40) + (4×40) + 39,15m, using pre-cast Super
T beam, bridge length L=468,9m.
- Bridge width is varied from 22.3m to 46.96m
Branch bridge:
- Span layout: Branch bridge 1 (4 × 35) + (3 × 35) m, bridge length L = 245.55m.
Branch bridge 2 (4 × 35) + (4 × 35) m, bridge length L=280,55. Both bridge branches
are used with hollow beam casted on the fixed falseworks.
SCIENCE AND TECHNOLOGY:
 APPLICATION OF BIM IN DESIGN 
 Deployment model
Structural
model
Input data - DD drawings;
- Shop drawings;
- Quantity calculation

Local
Support Auditing
software

 BIM application results


BIM application results for Southern Access Bridge

Items of deployment:
BIM application results - Hollow slab beam
for main bridge - Pier protection
structure
- Abutments
- Pier includes 2 types:
+ Pier structure with
01 reinforced concrete
Items of deployment: body at the location of
- Modeling the entire main arch structure: Including 2 arch sides with steel pipe stuffed
only one layer
concrete linked together by the upper horizontal frames and crossbeams of bridgeheads.
- Structure of the margin arch consists of two arch sides with steel and reinforced concrete + Gate pier structure
structure include 02 reinforced
- Bridge deck beams include main vertical beam and extra vertical beam, mediate horizontal concrete bodies linked
beam, horizontal beam linked to main arch and crossbeams of bridgeheads. together by
- Linking system crossbeams at the
- Main piers with reinforced concrete body location of 02 layers
- Structure of elevator, stairs, and beam test vehicle …

BIM application results for Northern Access Bridge

Items of deployment:
- Super T beams
- Abutments
- Piers:
+ Pier structure includes 01
reinforced concrete column at
the location from T0 to T5
+ Pier structure includes 02
reinforced concrete columns
at the location from T6 to T10
+ Piers of branches 1 and 2
with 01 body

 Models of components manufactured in the factory


Solid main arch: Trussed main arch:

Steel shell structure associated with concrete: Beam systems of bridge deck:

www.tedi.vn
SCIENCE AND TECHNOLOGY:

 APPLICATION OF BIM IN DESIGN 

 Structure model of reinforced concrete supports


Reinforced concrete support structure: Reinforced concrete pillar structure:

 Collision detection at associated sites

Link at the main pier body Link at the crossbeam of pier peak

Link between arch and bridge deck Link between pier and hollow slab beam

 Local structure audit