Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

TYPICAL PROJECTS

 RAILWAYS 


With the new technology of elevated railway and urban railway, TEDI has been surveying and designing urban railway lines
in Hanoi and Ho Chi Minh City such as: Lines No. 1, 2, 3, 5 and 6 of Hanoi; third party verification for the urban railway
lines No. 1, 2, 5 in Ho Chi Minh City ... with the immediate principle is to approach and learn technology in international
consultancy organizations, laying the foundation for long-term development in the field of railways; Bringing TEDI back as
the leading position in this field

NORTH - SOUTH HIGH SPEED RAILWAY PROJECT:


By the technologies obtained from the projects above-mentioned, TEDI has been selected as the leading consultant
of the JV for the North-South High Speed Railway Project, advising the Ministry of Transport to submit to the
Government and National Assembly of Vietnam for approval in 2019 for the purpose of promoting the railway
development and meeting the requirements of passengers and cargo transportation connecting the North and South

The North-South high speed railway shortens the


travel time from Hanoi to Ho Chi Minh City and
vice versa in just 7 hours.
.

The North-South high-speed railway with the length of about 1,300km, connecting with the Western provinces about 200km,
ie the total railway from Hanoi to Ca Mau is 1,500km with the speed of 200km/h.
New high-speed railway line with 1435mm gauge, double track, 23 stations, 5 depots for ship maintenance and repair. The
total length of the line is 1,500 km, which will go through 20 provinces.

www.tedi.vn
TYPICAL PROJECTS
 AIRPORT 

LONG THANH INTERNATIONAL AIRPORT

Long Thanh International Airport is designed with main


idea is the lotus flower - the national flower of Vietnam.

Long Thanh Airport will become a transshipment


international airport with a large scale in the region, serving
the strategy of developing Vietnam's air transport, gradually
forming an airport city, creating motivation for development
of the South and the whole country

It is expected that by 2025, the Long Thanh International


Airport Project will be completed and put into operation in
phase 1, with the capacity of 25 million passengers per year
and 1.2 million tons of cargo per year.

TED, as one of JV member, will be


responsible for implementing the transport
connection and coordinating with Nippon
Koei (Japan), OCG (Japan) in civil design
for ground and static traffic planning.

www.tedi.vn
TYPICAL PROJECTS
 RAILWAYS 
HANOI URBAN RAILWAYS
The urban railway network consists of 8 lines with a total length of about 318 km

www.tedi.vn
TYPICAL PROJECTS
 RAILWAYS 

METRO Line 1-HN


Length: 14.7 km; Number of station: 9; TEDI assignment: FS

METRO Line 3-HN


Length: 12.5km; Number of station: 12; TEDI assignment: FS

METRO Line 5-HN


Length: 39.4 km Number of station: 21; TEDI assignment: FS

METRO Line 2a-HN


Length: 13.1 km; Number of station: 12; TEDI assignment: FS

www.tedi.vn
TYPICAL PROJECTS
 RAILWAYS 

HOCHIMINH CITY URBAN RAILWAYS


Construction of 08 center and ring lines connecting main centers of the city, mainly
runs underground in the city

www.tedi.vn
TYPICAL PROJECTS
 RAILWAYS 

METRO Line 1-HCM


Length: 19.7km; Number of station: 14; TEDI assignment: FS

METRO Line 2-HCM


Length: 11.02km; Number of station: 10; TEDI assignment: FS

METRO Line 5-HCM


Length: 8.89km; Number of station: 8 TEDI assignment: FS

www.tedi.vn

You might also like