If you want to get hold of your concrete

structural elements reliably and fast... .

11/2012

PFEIFER
SEIL- UND HEBETECHNIK
GMBH
DR.-KARL-LENZ-STRASSE 66
D-87700 MEMMINGEN
PHONE Technical 0 83 31-937-345
support
Sales 0 83 31-937-290
FAX 0 83 31-937-342

PFEIFER WK System E-MAIL bautechnik@pfeifer.de


INTERNET www.pfeifer.de
PFEIFER –
Quality that lifts off
“Made in Germany” for over 430 years.
PFEIFER Seil- und Hebetechnik GmbH in Memmingen is
the headquarters of the PFEIFER Group and can look back on
a family tradition of more than 430 years in the manufacture
of ropes and cables. All our activities can be traced back to
lifting, attaching and securing with cables. Today, Gerhard
Pfeifer, of the 12 th generation of the family, heads the
international group of companies providing top-class
performance in the areas of wire rope technology, lifting
technology and connecting and lifting systems.

Quality is our business.


Our performance is based on quality through competence.
We have always gained, and retained, the trust of our
customers through reliable and innovative products and
a reliable service. Which is exactly why both today and in the
future we are backing “Made in Germany” where it matters.

We will be pleased to give you advice.


Good advice.
With constant ongoing development, regular testing and
inspection of our products, we have a comprehensive body
of knowledge and innovative strength. To be able to pass on
this application knowledge to customers, we have trained a
network of consulting engineers with this expert knowledge.
Our technical experts can advise you about the products,
develop economical and safe suggestions and solutions for
installations – even for the trickiest applications.

2
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Contents

PFEIFER – Quality that lifts off 2


General information 4–5
PFEIFER lifting devices 6 – 11
PFEIFER WK Quicklifts 7
PFEIFER l ifting a nchors 12 – 27
PFEIFER DR anchors 12
PFEIFER DR anchor with eye 13
PFEIFER WK anchors 14
PFEIFER DR anchors for front-sided installation 16 – 21
PFEIFER DR anchors for installation in floors and pipes 22 – 27
PFEIFER lifting anchors, installation in columns 28 – 33
PFEIFER accessories 34 – 37
PFEIFER WK moulding inserts 35
PFEIFER fixing screws for WK moulding inserts 36
General technical info 38 – 46
PFEIFER – Legal basis, definition of terms 39
PFEIFER – Safety concept, failure types 40
PFEIFER – Incorrect use 41
PFEIFER – Dimensioning lifting anchor systems 42
PFEIFER – Example elements 44
PFEIFER – Installation, use, closing 46

3
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
With a sure grasp,
fast and efficient

4
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
With PFEIFER you have
many advantages

Comprehensive product range


• Practically all application cases are covered with
suitable products
• Shorter-length anchors when the existing
reinforcement can be used (WK anchors)
• Fast, safe attachment with the PFEIFER WK Quicklift
• Load classes from 1.3 up to 20.0 tonnes

Technologically right up to date


• Continuous further developments and optimizations
of products and conditions of use
• Design of all components compliant with the VDI/
BV-BS directive 6205 and therefore CE-compliant
• Regular training seminars on the use of lifting
anchors
• User-friendly documentation without huge amounts
of text

Quality and safety


• Design and production of all WK system components,
and installation instructions, compliant with the EC
machinery directive
• DIN ISO 9001 certification
• Only raw materials specified by PFEIFER and
specifically suitable for compressing are used
• Made in Germany
• Continuous production monitoring
• Monitoring of suitability testing by accredited bodies

Efficiency
• Reliable lifting devices for quickest attachment
• High durability from selected quality materials

5
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Attaching is very quick:
PFEIFER WK lifting devices
PFEIFER WK Quicklift is the reliable lifting device for the
PFEIFER WK system. PFEIFER DR and PFEIFER WK anchors
can be attached rapidly and safely with the PFEIFER WK
Quicklift. This enables problem-free moving and assembly
of precast concrete elements.

System
• PFEIFER WK Quicklift for all anchors of the WK system
• Wide choice of associated anchors and accessories –
all lifting operations can be done practically and safely

PFEIFER WK Quicklift
• Highest safety levels from 50 years of experience in
the manufacture and use of lifting anchors
• Rapid and secure attachment
• Convenient in use
• Can be used for parallel and transversal shear pull

Made in Germany
• Safe manufacture under steady-state conditions
• In-house quality assurance
• Continuous product development
• High-ductility special precision-cast steel
• Controlled welding processes to applicable standards
• Supervision of welding and specialist welding engineer

Safety
• In-house production control, a permanent feature of
our production for decades
• Certification in accordance with DIN EN 9001

6
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER WK Quicklifts
Item-No. 05.184

Lifting device
WK System
Lifting device

PFEIFER WK Quicklift is the strong Advantages: long service life, reliable


and high-quality lifting device for the lifting device, rapid attachment, unam-
PFEIFER WK system.It is designed for biguous assignment from letter code
use in combination with PFEIFER DR identification
and PFEIFER WK anchors. Simply
threading the head over the slot of the
suspension ball gives a secure con-
nection between the lifting device and
the anchor.

Material:
Hardened cast steel, hardened
round steel, painted

PFEIFER WK Quicklift
Ref.-No. Type/Size NR,adm VR,adm for anchors Dims., [mm] weight
[kN] [kN] of size D H h B s d f [kg/piece]
05.184.013.3 WK/DR 1.3 13 6.5 1.3 54.0 162.0 74.0 33.0 11.5 46.0 74.0 0.99
05.184.025.3 WK/DR 2.5 25 12.5 2.5 63.0 194.0 89.0 42.0 16.0 55.0 86.0 1.41
05.184.050.3 WK/DR 5.0 50 25.0 5.0 82.0 236.0 112.0 60.0 21.5 70.0 118.0 3.22
05.184.100.3 WK/DR 10.0 100 50.0 10.0 105.0 339.0 155.0 84.0 29.0 84.0 160.0 8.92
05.184.200.3 WK/DR 20.0 200 100.0 20.0 153.0 441.0 231.0 115.0 41.0 118.0 186.0 22.00

Example order for 5 PFEIFER WK Quicklifts 2.5:


5 PFEIFER WK Quicklifts WK/DR 2.5, Ref.-No. 05.184.025.3

7
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Instructions for installation and use
System FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

The PFEIFER WK Quicklift is always used together with PFEIFER WK/DR


anchors. In combination with cast-in PFEIFER lifting anchors it forms
WK Quicklift
the matching lifting anchor system. The unambiguous assignment is done
using head size and the stamp on the anchor head, the Quicklift ball and the
lifter handle

Warning: The use of non-matched or external system components


can cause reduced safety levels and is not admissible. This can
cause a hazard to life and limb. Always use PFEIFER WK/DR components
that are matched to each other.

Notice: The term “size” corresponds to the load classes of


VDI-BV-BS 6205.

WK/DR anchor

Safety FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

The following safety parameter values for PFEIFER lifting anchor systems are derived as follows in accordance with the VDI/BV-BS 6205 directive, with the
prerequisite of the machinery directive 2006/42/EC. For this, a load-side dynamic working coefficient ψdyn=1.3 was assumed.
– Steel failure wire rope: γs = 4,0
– Steel failure chains or full sections: γs = 3,0
– Concrete failure (procedure B*): γc = 2,5
– Concrete failure (procedure A*): γc = 2,1 * for factory monitored fabrication of the prefab concrete elements

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

E ≤ Radm E
Radm

Notice: Determination of
stress according to VDI/
BV-BS 6205.

8
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Admissible load (resistance)

Lifting device
Type/Size NR,adm [kN] VR,adm [kN] Can be used for
Caution: The anchors to be concreted-in must be determined by
the planning engineer. The instructions for installation and use of
WK/DR 1.3 13 6.5 DR 1.3 the selected anchor must be complied with.
WK/DR 2.5 25 12.5 DR 2.5 und WK 2.5
WK/DR 5.0 50 25.0 DR 5.0 und WK 5.0 Warning: The use of non-matched system components can
cause reduced safety levels and is not admissible. This can cause
WK/DR 10.0 100 50.0 DR 10.0 und WK 10.0 a hazard to life and limb. Always use components that are matched to each
WK/DR 20.0 200 100.0 DR 20.0 und WK 20.0 other!

Installation FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: If the Quick-


lift head is not fully
attached there is a risk of the struc-
tural element falling and causing a

OK NO! hazard to life and limb. The head of


the WK Quicklift must always be
>5° fully inserted until the lip is seated
in position.

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: If the loading is


0° perpendicular to the slot of
45° the suspension ball (trans-
versal shear pull in the wrong direc-
OK tion), against the lip or incorrectly
NO! inserted, there is the risk of slipping
OK out and the construction element fall-
ing. This causes a hazard to life and
Tensile load 0 – 45 ° limb. The WK Quicklift must always
90°
Transverse shear load OK be fully inserted and loaded in the
direction of the lip that makes contact
Temperature -20 to 80 °C
with the concrete.

OK

visual check
discarding time

discarding time

Yes

Further use

No

Caution: Missing or illegible markings can make it not possible to allocate lifting devices and anchors correctly. This can result in items falling and
causing a hazard to life and limb. Lifting devices and anchors with absent or illegible markings must be immediately taken out of service.

Caution: PFEIFER Quicklifts can be over 4 kg in weight depending on their size. Injury can result if they fall.
All extremities must be kept away from the hazardous area.

Use the markings on the WK anchor Marking in the WK system:


and WK Quicklift to check that the – Type/Size
system parts belong together.
– EC marking
A
K-

– Year of manufacture
– Manufacturer

9
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Original inspection and service life FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

min
dk
0,9 · dk

max
Free of wear? 1 mm
No distortions?
h
No cracks?

lip undamaged?

min
0,9 · ds
max: s + 1 mm
Aperture width OK?
min: s
Distortion
Wear

When any of the following criteria are met, the PFEIFER Quicklift must not be
Notice: Before using for the first time, at least once a year and
used any longer and should be considered ready for discarding:
after special events, the WK Quicklifts must be examined by the
– Permanent distortion authorised specialist according to the specified criteria. The parts must be
– Cross-section reduction > 10% metallically pure for this.
– Elongation > 5%
– Cracks in the metal cross-section
– Corrosion pits Caution: If the surface has significant corrosion there is the danger
– Aperture width ≥ nominal value s+1 mm that the material is weakened or damaged. This can mean a hazard
– evident distortions, signs of wear to life and limb.

Caution: Do not use WK Quicklifts which have an unreadable or


Warning: The WK Quicklift must not be changed or modified in any
missing identification label. They must be discarded.
way. Any modification can lead to reduced safety or even failure of
the anchors and the fall of the structural element. Repair work is not per-
Notice: As soon as the WK Quicklift is detected as having reached the missible and discarded lifting devices must be disposed of.
end of its serviceable life, it must be clearly and unmistakably marked
as unusable and made unusable. (e.g. separate the cast ball)

Dimensions and limit values

Type/Size Aperture width Limit s Suspension link Limit h Stirrup diameter Limit ds Dimension dk Grenzmaß
s [mm] [mm] height h [mm] [mm] ds [mm] [mm] [mm] dk [mm]
WK/DR 1.3 11.5 12.5 162 170.1 12.0 10.8 20.0 18.0
WK/DR 2.5 16.0 17.0 194 203.7 14.0 12.6 25.0 22.5
WK/DR 5.0 21.5 22.5 236 247.8 20.0 18.0 37.0 33.3
WK/DR 10.0 29.0 30.0 339 356.0 28.0 25.2 50.0 45.0
WK/DR 20.0 41.0 42.0 441 463.1 38.0 34.2 75.0 67.5

Storage FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

OK NO ! Notice: Store the components of the WK system dry and protected.


There is a risk of corrosion if there are large temperature changes,
humid conditions or any contact with acids, road salt or sea water!

10
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Misuses FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: Use of the WK-Quicklift by untrained personnel results in Caution: Incorrect use can result in items falling and causing a
the risk of incorrect use and the risk of items falling down, causing hazard to life and limb. Lifting anchor systems must be used only

Lifting device
injury or death to persons. Use only trained personnel. as shown in the instructions for installation and use and only by
suitable and trained personnel.

Warning: Do not use WK Quicklifts for lashing concrete elements


during transport or for any other use not covered by this docu-
ment. This can result in items falling and causing a hazard to life
and limb of persons. These WK Quicklift devices must be used only for
lifting and moving precast concrete elements.

Important information about identification markings


The PFEIFER WK system includes the DR and WK anchors. Because of the transition to VDI/BV-BS 6205, that should be seen as the national implementation
of the machinery directive 2006/42/EC, a new safe identification is necessary. Since, during the transition period, products with the old and the new markings
will still be around, the following table should provide a simple and safe assignment of Quicklift and anchors. PFEIFER WK products with the old and the new
markings for a class of size/load can be mixed in the transition period without affecting safety.

Identification mark NEW Identification mark, OLD

WK Quicklift DR Anchor WK Anchor WK Quicklift DR Anchor WK Anchor

WK/DR 1.3 DR 1.3 – WK/DR 1.3 t DR 1.3 t –

– WK 2.0 – WK 2.0 t
WK/DR 2.0/2.5 WK/DR 2.0/2.5 t
DR 2.5 WK 2.5 DR 2.5 t WK 2.5 t

– WK 4.0 – WK 4.0 t
WK/DR 4.0/5.0 WK/DR 4.0/5.0 t
DR 5.0 – DR 5.0 t –

– WK 6.3 – WK 6.3 t
DR 7.5 – DR 7.5 t –
WK/DR 6.3/10.0 WK/DR 6.3/10.0 t
– WK 8.0 – WK 8.0 t
DR 10.0 WK 10.0 DR 10.0 t WK 10.0 t

– WK 12.5 – WK 12.5 t
WK/DR 12.5/20.0 DR 15.0 WK 15.0 WK/DR 12.5/20.0 t DR 15.0 t WK 15.0 t
DR 20.0 WK 20.0 DR 20.0 t WK 20.0 t

Test service
The PFEIFER test service, with
specially trained test technicians
(EN 473) and the most modern equip-
ment, is available to take over from
you the responsibility for carrying
out the legally prescribed inspection
of your hoists, lifting and attachment
devices. We can test at your site with
one of our mobile vehicles with exa-
mination equipment, at our headquar-
ters or in our branch locations.

The quality of our products and


services is what underlies our
success.

11
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER DR anchors
Item No. 05.180

Can be used for:


• slab edge installation in structural elements WK System
• slab face installation in elements and tubes
DR Anchor

The PFEIFER DR anchor for walls, Advantages: safe load application,


tubes and floors is intended, in com- unambiguous assignment through the
bination with the PFEIFER WK Quick- letter-code marking
lift, to be an anchor in the WK sys-
tem. The length of these anchors can
be matched to the application and
optimally selected for safe load appli-
cation.

Material:
Forged steel, black

Ref.-No. Type/Size NR,adm* Dims., [mm] Weight approx.


[kN] h D d b [kg/piece]
05.180.013.h.2 DR 1.3 13 55, 65, 85, 120 18 10 25 0.06 – 0.10
05.180.025.h.2 DR 2.5 25 70, 85, 120, 140, 170 25 14 35 0.16 – 0.27
75, 95, 120, 160,
05.180.050.h.2 DR 5.0 50 36 20 50 0.34 – 0.76
180, 210, 240
85, 95, 120, 140,
05.180.075.h.2 DR 7.5 75 46 24 60 0.58 – 1.36
165, 200, 300
120, 135, 150, 170, 200
05.180.100.h.2 DR 10.0 100 46 28 70 0.93 – 1.98
220, 250, 340
05.180.150.h.2 DR 15.0 150 400 69 34 85 3.70
05.180.200.h.2 DR 20.0 200 500 69 39 99 5.87

Sample order for


5 PFEIFER DR anchors size 5.0, length 240 mm:
5 PFEIFER DR anchors Ref.-No. 05.180.050.240.2

*Caution: The resistance stated here represents the maximum possible resistance of the anchor size. To
select the anchor, the resistance values from the Dimensioning section must be used.
12
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER DR anchor with eye
Item-No. 05.184

Lifting device
Can be used for:
• slab edge installation in structural elements WK System
DR Anchor

The PFEIFER DR anchor with eye Advantages: safe load application,


is intended, in combination with the unambiguous assignment through the
PFEIFER WK Quicklift, to be an anchor letter-code marking
for the transport of wall-type precast
concrete elements. Anchoring of the
load is done with the retention rein-
forcement provided by the customer.

Lifting anchor
Material:
Forged steel, black
D

R
B

Ref.-No. Type/Size NR,adm Dims., [mm] Weight approx.


[kN] h D d B R [kg/piece]
05.187.013.065.2 DR 1.3 13 65 18 10 22 10 0.06
05.187.025.090.2 DR 2.5 25 90 25 14 32 13 0.16
05.187.050.120.2 DR 5.0 50 120 36 20 43 20 0.43
05.187.100.180.2 DR 10.0 100 180 46 28 57 25 1.17
05.187.200.250.2 DR 20.0 200 250 69 39 83 38 3.26

Sample order for


5 PFEIFER DR anchors with eye, size 5.0, length 120 mm:
5 PFEIFER DR anchors Ref.-No. 05.187.050.120.2

13
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER WK anchors
Item-No. 05.185

Can be used for:


• edge and face element installation in columns-shaped structural elements WK System
WK Anchor

PFEIFER WK anchors are, in combi- Advantages: safe load application,


nation with the WK Quicklift, intended unambiguous assignment through the
to be lifting anchors for reinforced letter-code marking
structural elements such as columns,
girders etc. Because of the reinforce-
ment already present in these structu-
ral elements, the short form of the
anchor can safely transmit the forces.

Material:
Forged steel, black

Ref. No., plain Type/Size NR,adm VR,adm Dims., [mm] weight


[kN] [kN] dS D h b [kg/piece]
05.185.020.145.2 WK 2.0 20 10.0 14 26 145 32 0.22
05.185.025.190.2 WK 2.5 25 12.5 14 26 190 32 0.27
05.185.040.230.2 WK 4.0 40 20.0 20 36 230 45 0.66
05.185.063.270.2 WK 6.3 63 31.5 25 47 270 42 1.28
05.185.080.300.2 WK 8.0 80 40.0 28 47 300 52 1.59
05.185.100.325.2 WK 10.0 100 50.0 28 47 325 52 1.74
05.185.125.350.2 WK 12.5 125 62.5 32 70 350 72 2.84
05.185.150.400.2 WK 15.0 150 75.0 36 70 400 73 3.80
05.185.200.500.2 WK 20.0 200 100.0 40 70 500 82 5.40

Example order for 50 PFEIFER WK anchors WK 4.0 plain, length 230 mm:
50 PFEIFER WK anchors Ref.-No. 05.185.040.230.2

14
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Important information about identification markings
The PFEIFER WK system includes the DR and WK anchors. Because of the transition to VDI/BV-BS 6205, that should be seen as the national implementation
of the machinery directive 2006/42/EC, a new safe identification is necessary. Since, during the transition period, products with the old and the new markings

Lifting device
will still be around, the following table should provide a simple and safe assignment of Quicklift and anchors. PFEIFER WK products with the old and the new
markings for a class of size/load can be mixed in the transition period without affecting safety.

Identification mark NEW Identification mark, OLD

WK-Quicklift DR Anchor WK Anchor WK-Quicklift DR Anchor WK Anchor

WK/DR 1.3 DR 1.3 – WK/DR 1.3 t DR 1.3 t –

– WK 2.0 – WK 2.0 t
WK/DR 2.0/2.5 WK/DR 2.0/2.5 t
DR 2.5 WK 2.5 DR 2.5 t WK 2.5 t

– WK 4.0 – WK 4.0 t
WK/DR 4.0/5.0 WK/DR 4.0/5.0 t
DR 5.0 – DR 5.0 t –

– WK 6.3 – WK 6.3 t
DR 7.5 – DR 7.5 t –
WK/DR 6.3/10.0 WK/DR 6.3/10.0 t
– WK 8.0 – WK 8.0 t
DR 10.0 WK 10.0 DR 10.0 t WK 10.0 t

Lifting anchor
– WK 12.5 – WK 12.5 t
WK/DR 12.5/20.0 DR 15.0 WK 15.0 WK/DR 12.5/20.0 t DR 15.0 t WK 15.0 t
DR 20.0 WK 20.0 DR 20.0 t WK 20.0 t

15
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Hold walls on the front side

PFEIFER DR anchors are lifting anchors forming an


integral part of the recognised PFEIFER WK system.
The various anchors are suitable for installation in
the slab edge installation of wall elements and for
slab face installation in floors.

System
• The cleverly designed product range consists of
the PFEIFER WK/DR anchor, the PFEIFER WK mould-
ing insert for fixing the anchor, and the PFEIFER WK
Quicklift for attaching the anchor. It is suitable for
slab edge installation and offers PFEIFER customers
a simple and safe system for transporting wall-type
precast concrete elements.

PFEIFER lifting anchors


• Over 50 years of experience in the manufacture and
application support on the use of lifting anchors have
also contributed here
• Safe load distribution even in the thinnest columns
and beams
• Design of all PFEIFER WK system products compliant
with the new VDI/BV-BS 6205 directive

Quality
• Safe manufacture under consistent conditions
• In-house quality assurance
• Continuous product development

Safety
• Certification in accordance with DIN EN 9001
• Precisely defined product-specific quality data for
production and raw materials

16
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Instructions for installation and use for slab edge installation

System FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Lifting device
The DR anchor and the PFEIFER WK Quicklift are a variant of the WK system
for transporting precast wall panels.

Notice: DR anchors were developed for a single time-limited use


and must not be re-used. Re-attachment several times within one
road transport chain from manufacture to assembly of a precast
concrete element is not classed as repeated use.
WK Quicklift
Notice: The term “size” corresponds to the load classes of
VDI-BV-BS 6205.

Warning: The WK Quicklift must not be changed or modified in any


way. Any modification can lead to reduced safety or even failure of
the anchors and the fall of the structural element. Repair work is not per-
missible and discarded lifting devices must be disposed of.

Lifting anchor
DR Anchor DR anchor
with eye

Safety FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

The following safety parameter values for PFEIFER lifting anchor systems are derived as follows in accordance with the VDI/BV-BS 6205 directive, with the
prerequisite of the machinery directive 2006/42/EC. For this, a load-side dynamic working coefficient ψdyn=1.3 was assumed.
– Steel failure wire rope: γs = 4,0
– Steel failure chains or full sections: γs = 3,0
– Concrete failure (procedure B*): γc = 2,5
– Concrete failure (procedure A*): γc = 2,1 * for factory monitored fabrication of the prefab concrete elements

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Caution: The anchors to be cast-in must be determined by


the planning engineer. The instructions for installation and use
of the selected anchor type must be complied with.

Warning: The use of accessories that are not part of this


system, those of other manufacturers in particular, can reduce the
carrying capacity and even result in the structural element falling. This
causes a hazard to life and limb. Use only components of the PFEIFER WK
system.

Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Notice: The anchor must always be attached higher than the centre
of gravity of the concrete part because otherwise the structural
element can tip over during transport.

Notice: To achieve the stated carrying capacity, you need to comp-


E ≤ Radm Radm
E

ly with the minimum dimensions, the minimum reinforcement of


the installation instructions and a concrete cube strength compres-
sion of at least 15 N/mm2.
Notice: Determination of
stress according to VDI/
BV-BS 6205.
17
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Table 1 – admissible resistance values DR anchors and required reinforcement

Surface Long. reinf.


Type/Size Anchor height reinforcement Stirrup B500S (pos. 2) (pos 3)
h [mm] NR,adm [kN] (pos. 1)
[mm²/m] n [-] ØB [mm] L [mm] S [mm] S1 [mm] ØL [mm]

DR 1.3 120 13 1 x 188 2 8 700 - 30 2x8


DR 2.5 170 25 2 x 188 2 8 750 - 50 2x8
DR 5.0 240 50 2 x 188 2 10 950 - 75 2 x 10
DR 7.5 300 75 2 x 188 4 10 1050 100 75 2 x 12
DR 10.0 340 100 2 x 188 4 10 1050 100 75 2 x 14
DR 15.0 400 150 2 x 335 6 12 1200 100 100 2 x 14
DR 20.0 500 200 2 x 424 6 12 1500 100 100 2 x 14

Table 2 – admissible resistance values DR anchors with eye and required reinforcement

Surface Long. reinf.


Stirrup B500S (pos. 2)
Type/Size Anchor height reinforcement (pos 3)
h [mm] NR,adm [kN] (pos. 1)
[mm²/m] n [-] ØB [mm] L [mm] S [mm] S1 [mm] ØL [mm]

DR 1.3 65 13 1 x 188 2 8 700 - 30 2x8


DR 2.5 90 25 2 x 188 2 8 750 - 50 2 x 10
DR 5.0 120 50 2 x 188 2 10 950 - 75 2 x 10
DR 10.0 180 100 2 x 188 4 10 1050 100 75 2 x 14
DR 20.0 250 200 2 x 424 6 12 1500 100 100 2 x 14

Table 3 – retention reinforcement, eye anchor

Retention reinforcement
Type/Size Retention reinforcement
LS [mm] D [mm] ØR [mm] eye anchor

DR 1.3 325 40 10
DR 2.5 500 48 12 D Notice: When lifting from
a tilting table at an angle
DR 5.0 850 64 16 g ≤ 15°, no special rein-
ØR LS
DR 10.0 1000 140 20 forcement is required. A
DR 20.0 1500 224 32 30° transversal shear pull at
more than 15° is not per-
missible.

FZ
OK
FZ
3 2 3 2 3
NO !

1
2 1 2 L
DR-C–I
C-I

DR-A

S S S S
S1
S1

Notice: This illustration applies in a similar way for DR anchors


also. With the DR eye anchor, retention reinforcement as in Table 3

18 is always also required.

© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Installation FOR PLANNERS, FOR PRECAST PLANTS, FOR USERS

WK moulding insert Fixing screw

Lifting device
with wing nut

DR Anchor DR anchor
with eye

Lifting anchor
Caution: If the recessing block is too small, later attachment Notice: For correct and safe attachment of the lifting anchor to the
with the lifting device is not possible. If the recessing block is formwork the suitable system-specific PFEIFER fixing accessories
too large, correct attachment of the lifting device is also not possible; must be used.
there is the risk of the WK Quicklift slipping out. Premature failure of
the anchor and falling of the structural element can be the consequence.
The size of recess block identified as appropriate must
be used.

Table 4 – minimum dimensions and distances for DR anchors


a Type/Size Anchor height h Edge distance a Minimum spacing Min. element Min. element
b [mm] [mm] b [mm] height H [mm] thickness d [mm]
a
DR 1.3 120 390 390 440 80
DR 2.5 170 445 445 800 100
d
H DR 5.0 240 765 765 1000 160
DR 7.5 300 945 945 1100 180
DR 10.0 340 1065 1065 1100 240
DR 15.0 400 1245 1245 1250 350
DR 20.0 500 1545 1545 1550 450

Table 5 – minimum dimensions and distances for DR anchors with eye


a
b Type/Size Anchor height h Edge distance a Minimum spacing Min. element Min. element
a [mm] [mm] b [mm] height H [mm] thickness d [mm]
DR 1.3 65 250 500 500 80
d DR 2.5 90 300 600 700 100
H
DR 5.0 120 400 800 1000 140
DR 10.0 180 600 1200 1200 200
DR 20.0 250 800 1600 1800 240

Installation tolerances

OK
_ 10% d
> _ 10% d
>
NO! NO !

_ 5° N
< _ 5°
<
O! NO!
OK 19
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: Transversal
shear load on DR anchors
is not permissible and can
lead to failure of the anchor and
hence to the structural element
falling. This causes a hazard to life
and limb. Anchors must be loaded
only according to regulations.
Tensile load 0 – 30 ° 0 – 30 °
Transversal shear load NO! NO!
Temperature -20 to 80 °C -20 to 80 °C

OK

visual check
discarding time

discarding time

Yes

Further use

No

Warning: Apply loads to the WK Quicklift only in the direction given


30° 0° in the instructions for installation and use. Loading outside the
authorised angle range results in lower safety levels and represents
OK a hazard to life and limb.

NO!
NO!
A
K-

Caution: If the markings are missing or illegible the lifting devices


90° cannot be correctly allocated to the anchor. This can result in
items falling and causing a hazard to life and limb. Lifting devices and
anchors with absent or illegible markings must be immediately taken out of
service.

Information on the markings:


Notice: Use the markings
- Type/Size
on the anchor and lifting
- Year of manufacture
device to check that the
- EC marking
system parts belong toge-
- Manufacturer
ther.

20
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Misuses FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: Use of the anchor by untrained personnel results in the Caution: Incorrect use can result in safety hazards and reduced
risk of incorrect use and the risk of items falling down, causing carrying capacity. This results in the risk of a fall and a hazard to

Lifting device
injury or death to persons. Use only trained personnel! life and limb. Lifting anchor systems must be used only in accordance with
the instructions for installation and use and only by suitable and trained
personnel.

Warning: Use of the anchor systems for lashing during transport


of the building component is not admissible since this can lead to
the load falling and so to injury and death of persons. These anchor sys-
tems must be used only for lifting and moving the stated precast concrete
elements.

Storage FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

OK NO ! Notice: Store the components of the WK system dry and pro-


tected. There is a risk of corrosion if there are large temperature

Lifting anchor
changes, humid conditions or any contact with acids, road salt or
sea water!

Warning: If anchors in structural elements spend long periods in the


open or in humid environments there is a risk of knife-sharp pitting
corrosion in the outlet area, which can seriously damage the carrying capa-
city of the anchors. This can occur without visible traces of corrosion. The-
refore anchors without corrosion protection are not usable for long periods
in environments that promote corrosion.

21
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Short DR anchors for
slab face installation.
Making pipes and floors
an easy prey

The PFEIFER DR anchor is a part of the recognised PFEIFER


WK system. The short-form DR anchor is for installation in
the surface of floor slabs and in thick-walled concrete pipes
and offers PFEIFER customers a wide range of applications.

PFEIFER lifting anchors


• Highest safety levels from over 50 years of experi-
ence in manufacturing and application consulting
• Safe load application assured by forged-on anchor foot
• All PFEIFER WK system products compliant with the
new VDI/BV-BS 6205 directive

Quality
• Safe manufacture under consistent conditions
• In-house quality assurance
• Continuous product development

Safety
• Certification in accordance with DIN EN 9001
• Precisely defined product-specific quality data for
production and raw materials

22
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Instructions for installation and use

System FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Lifting device
PFEIFER Quicklift with the DR anchors is a variant of the WK system for
transporting precast floors and pipes.

Notice: DR anchors were developed for a single time-limited use and


must not be re-used. Re-attachment several times within one road
transport chain from manufacture to assembly of a precast concrete
element is not classed as repeated use.

Notice: The term “size” corresponds to the load classes of


WK Quicklift VDI-BV-BS 6205.

Warning: The anchor system must not be changed or modified in


any way! Any modification can lead to reduced safety or even fail-
ure of the anchors and the fall of the structural element. Only use anchors
if they are in the defect-free original state.

Lifting anchor
DR Anchor

Safety FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

The following safety parameter values for PFEIFER lifting anchor systems are derived as follows in accordance with the VDI/BV-BS 6205 directive, with the
prerequisite of the machinery directive 2006/42/EC. For this, a load-side dynamic working coefficient ψdyn=1.3 was assumed.
– Steel failure wire rope: γs = 4,0
– Steel failure chains or full sections: γs = 3,0
– Concrete failure (procedure B*): γc = 2,5
– Concrete failure (procedure A*): γc = 2,1 * for factory monitored fabrication of the prefab concrete elements

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Caution: The anchors to be cast-in must be determined by the


planning engineer. The instructions for installation and use of the
selected anchor type must be complied with.

Warning: The use of accessories that are not part of this system,
those of other manufacturers in particular, can reduce the carrying
capacity and even result in the structural element falling. This causes
a hazard to life and limb. Use only components of the PFEIFER WK
system.

23
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Dimensioning FOR PLANNERS, FOR PRECAST PLANTS, FOR USERS

Notice: The anchor must always be attached higher than the centre
of gravity because otherwise the element can tip over during trans- E
port.
E ≤ Radm
Notice: To achieve the stated carrying capacity, you need to
comply with the minimum dimensions, the minimum reinforcement
of the installation instructions and a concrete cube strength com-
pression as in Tables 1-4!
Notice: Determination of
stress according to VDI/ Rzul
BV-BS 6205.

Table 1: PFEIFER DR anchor A – G permissible resistance values for normal slab thickness as in Table 4.
Type/Size Anchors height NR,adm [kN] for β=0-12,5° NR,adm [kN] for β=12,5-30°
h [mm] 15 N/mm² 25 N/mm² 35 N/mm² 15 N/mm² 25 N/mm² 35 N/mm²
DR 1.3 55 11.5 13.0 13.0 9.8 12.7 13.0
DR 1.3 65 13.0 13.0 13.0 12.2 13.0 13.0
DR 1.3 85 13.0 13.0 13.0 13.0 13.0 13.0
DR 1.3 120 13.0 13.0 13.0 13.0 13.0 13.0
DR 2.5 70 16.0 20.7 24.4 13.7 17.6 20.9
DR 2.5 85 20.6 25.0 25.0 17.6 22.8 25.0
DR 2.5 120 25.0 25.0 25.0 25.0 25.0 25.0
DR 2.5 140 25.0 25.0 25.0 25.0 25.0 25.0
DR 2.5 170 25.0 25.0 25.0 25.0 25.0 25.0
DR 5.0 75 18.7 24.2 28.6 16.0 20.7 24.5
DR 5.0 95 25.3 32.7 38.7 21.6 27.9 33.0
DR 5.0 120 34.4 44.4 50.0 29.4 38.0 44.9
DR 5.0 160 50.0 50.0 50.0 43.4 50.0 50.0
DR 5.0 180 50.0 50.0 50.0 50.0 50.0 50.0
DR 5.0 210 50.0 50.0 50.0 50.0 50.0 50.0
DR 5.0 240 50.0 50.0 50.0 50.0 50.0 50.0
DR 7.5 85 21.9 28.3 33.5 18.7 24.2 28.6
DR 7.5 95 25.3 32.7 38.7 21.6 27.9 33.0
DR 7.5 120 34.4 44.4 52.6 29.4 38.0 44.9
DR 7.5 140 42.4 54.7 64.7 36.2 46.7 55.3
DR 7.5 165 53.0 68.4 75.0 45.3 58.5 69.2
DR 7.5 200 69.2 75.0 75.0 59.1 75.0 75.0
DR 7.5 300 75.0 75.0 75.0 75.0 75.0 75.0
DR 10.0 120 34.4 44.4 52.6 29.4 38.0 44.9
DR 10.0 135 40.3 52.1 61.6 34.4 44.5 52.6
DR 10.0 150 46.5 60.1 71.1 39.7 51.3 60.7
DR 10.0 170 55.2 71.3 84.4 47.2 60.9 72.1
DR 10.0 200 69.2 89.3 100.0 59.1 76.3 90.3
DR 10.0 220 79.1 100.0 100.0 67.5 87.2 100.0
DR 10.0 250 94.7 100.0 100.0 80.9 100.0 100.0
DR 10.0 340 100.0 100.0 100.0 100.0 100.0 100.0

24
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Table 2: PFEIFER DR anchor A – G permissible resistance values for minimum slab thickness as in Table 4

Lifting device
Type/Size Anchors height NR,adm [kN] for β=0-12,5° NR,adm [kN] for β=12,5-30°
h [mm] 15 N/mm² 25 N/mm² 35 N/mm² 15 N/mm² 25 N/mm² 35 N/mm²
DR 1.3 55 9.0 11.6 13.0 9.0 11.6 13.0
DR 1.3 65 10.9 13.0 13.0 10.9 13.0 13.0
DR 1.3 85 13.0 13.0 13.0 13.0 13.0 13.0
DR 1.3 120 13.0 13.0 13.0 13.0 13.0 13.0
DR 2.5 70 12.0 15.5 18.3 12.0 15.5 18.3
DR 2.5 85 15.1 19.5 23.1 15.1 19.5 23.1
DR 2.5 120 23.2 25.0 25.0 23.2 25.0 25.0
DR 2.5 140 25.0 25.0 25.0 25.0 25.0 25.0
DR 2.5 170 25.0 25.0 25.0 25.0 25.0 25.0
DR 5.0 75 14.3 18.5 21.8 14.3 18.5 21.8
DR 5.0 95 18.7 24.2 28.6 18.7 24.2 28.6
DR 5.0 120 24.8 32.0 37.9 24.8 32.0 37.9
DR 5.0 160 35.6 45.9 50.0 35.6 45.9 50.0

Lifting anchor
DR 5.0 180 41.4 50.0 50.0 41.4 50.0 50.0
DR 5.0 210 50.0 50.0 50.0 50.0 50.0 50.0
DR 5.0 240 50.0 50.0 50.0 50.0 50.0 50.0
DR 7.5 85 16.5 21.3 25.2 16.5 21.3 25.2
DR 7.5 95 18.7 24.2 28.6 18.7 24.2 28.6
DR 7.5 120 24.8 32.0 37.9 24.8 32.0 37.9
DR 7.5 140 30.0 38.8 45.9 30.0 38.8 45.9
DR 7.5 165 37.0 47.8 56.5 37.0 47.8 56.5
DR 7.5 200 47.6 61.4 72.6 47.6 61.4 72.6
DR 7.5 300 75.0 75.0 75.0 75.0 75.0 75.0
DR 10.0 120 24.8 32.0 37.9 24.8 32.0 37.9
DR 10.0 135 28.7 37.0 43.8 28.7 37.0 43.8
DR 10.0 150 32.8 42.3 50.0 32.8 42.3 50.0
DR 10.0 170 38.5 49.6 58.7 38.5 49.6 58.7
DR 10.0 200 47.6 61.4 72.6 47.6 61.4 72.6
DR 10.0 220 54.0 69.7 82.4 54.0 69.7 82.4
DR 10.0 250 64.1 82.7 97.9 64.1 82.7 97.9
DR 10.0 340 97.6 100.0 100.0 97.6 100.0 100.0

Table 3: PFEIFER DR anchor A – G – reduction factors for use in pipes

Type Anchors length L Pipe outer diameter [mm]


[mm] 500 1000 1500 2000 2500 3000
DR 55 0.81 0.88 0.92 0.94 0.95 0.96
DR 85 0.74 0.84 0.89 0.91 0.93 0.94
DR 120 0.69 0.80 0.85 0.88 0.90 0.91
DR 170 0.62 0.75 0.81 0.85 0.87 0.89
DR 220 0.57 0.71 0.78 0.82 0.85 0.87
DR 340 0.46 0.63 0.71 0.76 0.79 0.82

Notice: When using DR anchors in pipes the resistance values


must be recalculated from Tables 1 and 2 with the reduction
factors from Table 3. The dimensioning then uses: red.
NR,adk, pipe = NR,adm ∙ reduction factor

25
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Installation FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Moulding insert Fixing screw with Fixing screw with


Detail wing nut wing nut

DR Anchor Anchor Anchor

Detail

Caution: If the recessing block is too small, later attachment Notice: For correct and safe attachment of the lifting anchor to the
with the lifting device is not possible. If the recessing block is formwork the appropriate system-specific fixing accessories (from
too large, correct attachment of the lifting device is also not possible; PFEIFER) must be used.
there is the risk of the WK Quicklift slipping out. Premature failure of
the anchor and falling of the structural element can be the conse-
quence. The size of recess block identified as appropriate must be
used.

Distances/element thicknesses
Type/Size Anchors Anchoring Edge Axis norm. slab min. slab
length depth distance distance thickness thickness
L [mm] hef [mm] c [mm] s [mm] h [mm] hmin [mm]
DR 1.3 55 65 195 195 130 90
DR 1.3 65 75 225 225 150 100
DR 1.3 85 95 285 285 190 120 h het
DR 1.3 120 130 390 390 260 155
DR 2.5 70 81 245 245 165 105
DR 2.5 85 96 290 290 195 120
DR 2.5 120 131 395 395 265 155
DR 2.5 140 151 455 455 305 175
DR 2.5 170 181 490 545 365 205
DR 5.0 75 90 270 270 180 120
DR 5.0 95 110 330 330 220 140
DR 5.0 120 135 405 405 270 165
DR 5.0 160 175 485 525 350 205
DR 5.0 180 195 500 585 390 225 b
h
DR 5.0 210 225 510 675 450 255
DR 5.0 240 255 510 765 510 285 a a

DR 7.5 85 100 300 300 200 130


DR 7.5 95 110 330 330 220 140
DR 7.5 120 135 405 405 270 165
DR 7.5 140 155 460 465 310 185
DR 7.5 165 180 490 540 360 210
Notice: The applicable
DR 7.5 200 215 510 645 430 245 installation tolerances are
DR 7.5 300 315 630 945 630 345 as indicated on p. 19.
DR 10.0 120 135 405 405 270 165
DR 10.0 135 150 450 450 300 180
DR 10.0 150 165 475 495 330 195
DR 10.0 170 185 495 555 370 215
DR 10.0 200 215 510 645 430 245
DR 10.0 220 235 510 705 470 265
26 DR
DR
10.0
10.0
250
340
265
355
530
710
795
1065
530
710
295
385
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Lifting device
Tensile load 0 – 30 °
Transversal shear load NO!
Temperature -20 to 80 °C

OK

visual check
discarding time

discarding time

Yes

Further use

Lifting anchor
No

Warning: Apply loads to the WK Quicklift only in the direction


30° 0° given in the instructions for installation and use. Loading outside
the authorised angle range results in lower safety levels and represents
OK a hazard to life and limb.

NO!
A
K-

NO! Caution: If the markings are missing or illegible the lifting devices
cannot be correctly allocated to the anchor. This can result in
90°
items falling and causing a hazard to life and limb. Lifting devices and
anchors with absent or illegible markings must be immediately taken out
of service.

Information on the markings:


Notice: Use the markings
- Type/Size
on the anchor and lifting
- Year of manufacture
device to check that the sys-
- EC marking
tem parts belong together.
- Manufacturer

Misuses FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: Use of the anchor by untrained personnel results in the Caution: Incorrect use can result in safety hazards and reduced
risk of incorrect use and the risk of items falling down, causing carrying capacity. This results in the risk of a fall and a hazard to life
injury or death to persons. Use only trained personnel! and limb. Lifting anchor systems must be used only in accordance with the
instructions for installation and use and only by suitable and trained person-
nel.

Warning: Use of the anchor systems for lashing during transport


of the building component is not admissible since this can lead to
the load falling and so to injury and death of persons. These anchor sys-
tems must be used only for lifting and moving the stated precast concrete
elements.

Storage FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

OK NO ! Notice: Store the components of the WK system dry and pro-


tected. There is a risk of corrosion if there are large temperature
changes, humid conditions or any contact with acids, road salt or
sea water!

Warning: If anchors in structural elements spend long periods in the


open or in humid environments there is a risk of knife-sharp pitting
corrosion in the outlet area, which can seriously damage the carrying capaci-
ty of the anchors. This can occur without visible traces of corrosion. There-
fore anchors without corrosion protection are not usable for long periods in
environments that promote corrosion. 27
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER WK anchors for
installation in columns and
beams – get a safe grip

The PFEIFER WK anchor is a part of the recognised


PFEIFER WK system and directly derived from the proven
PFEIFER waved anchor. With its significantly shorter shape
it is the optimal choice for use in columns and beams, i.e. in
bar-shaped structural elements with longitudinal and stirrup
reinforcement. This reinforcement makes secure load appli-
cation possible despite the shortness of the anchor.

System
• The product range with the PFEIFER WK anchor, the
PFEIFER WK moulding insert for fixing the anchor,
and the PFEIFER WK Quicklift for attaching the anchor
is appropriate for installing in bar-shaped structural
elements and offers PFEIFER customers a simple and
safe system for transporting precast elements.

PFEIFER lifting anchors


• Highest safety levels from over 50 years of experi-
ence in manufacturing and application consulting
• Safe load distribution even in the thinnest columns
and beams
• Optimised waved shape with minimum gap effect
• Load classes from 2 up to 20 tonnes

Made in Germany
• Safe manufacture under consistent conditions
• In-house quality assurance
• Continuous product development

Safety
• Certification in accordance with DIN EN 9001
• Precisely defined product-specific quality data for
production and raw materials

28
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Instructions for installation and use

System

Lifting device
FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

PFEIFER Quicklift with the DR anchor is a variant of the WK system for


transporting column-shaped and heavily reinforced structural elements.

Notice: WK anchors were developed for a single time-limited use


and must not be re-used. Re-attachment several times within one
road transport chain from manufacture to assembly of a precast
concrete element is not classed as repeated use.

Notice: The term “size” corresponds to the load classes of


WK Quicklift VDI-BV-BS 6205.

Warning: The anchor system must not be changed or modified


in any way. Any modification can lead to reduced safety or even
failure of the anchors and the fall of the structural element. Only use
anchors if they are in the defect-free original state.

Lifting anchor
WK Anchor

Safety FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

The following safety parameter values for PFEIFER lifting anchor systems are derived as follows in accordance with the VDI/BV-BS 6205 directive, with the
prerequisite of the machinery directive 2006/42/EC. For this, a load-side dynamic working coefficient ψdyn=1.3 was assumed.
– Steel failure wire rope: γs = 4,0
– Steel failure chains or full sections: γs = 3,0
– Concrete failure (procedure B*): γc = 2,5
– Concrete failure (procedure A*): γc = 2,1 * for factory monitored fabrication of the prefab concrete elements

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: The use of accessories that are not part of this


system, those of other manufacturers in particular, can reduce the
carrying capacity and even result in the structural element falling. This
causes a hazard to life and limb. Use only components of the PFEIFER WK
system.

Caution: The anchors to be concreted-in must be determined by


the planning engineer. The instructions for installation and use of
the selected anchor type must be complied with.

Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Notice: The anchor must always be attached higher than the centre
of gravity of the concrete part because otherwise the structural
element can tip over during transport.

Notice: To achieve the stated carrying capacity, you need to comp-


E ≤ Radm Radm
E

ly with the minimum dimensions, the minimum reinforcement of


the installation instructions as in Tables 1, 2 and a concrete cube
strength compression of at least 15 N/mm2.
Notice: Determination of
stress acc. to VDI/BV-BS
6205.

29
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Dimensioning FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Table 1: Carrying capacity and reinforcement with longitudinal installation

Type/Size NR, adm. a b d ØBÜ s ØL ØR LS


[kN] [mm] [mm] [mm] [mm] [mm] [mm] [mm] [mm]
WK 2.0 20 350 700 170 6 150 12 30 200
WK 2.5 25 450 900 205 6 150 14 35 250
WK 4.0 40 600 1200 260 8 200 16 40 400
WK 6.3 63 700 1400 300 10 200 20 45 630
WK 8.0 80 750 1500 360 10 200 25 55 800
WK 10.0 100 800 1600 380 12 200 25 60 1000
WK 12.5 125 850 1700 400 14 200 25 65 1250
WK 15.0 150 1000 2000 450 16 200 28 80 1500
WK 20.0 200 1200 2400 600 20 200 28 90 2000

2 Fz Fz Notice: Install the parallel


a
b shear stirrup immediately
a under the recess block.
D
Notice: For precast elements
d with �w ≥ 20 N/mm2, no
ØR LS
parallel shear reinforcement
30° is necessary. Otherwise, WK
anchors with parallel shear
s ØBü loading must always be ins-
ØL d talled with the correct paral-
lel shear stirrup.

Table 2: Carrying capacity and reinforcement for erection and vertical lifting of column head
Type/Size NR,adm VR,adm d ØBÜ Si ØL Anzahl ØU l
[kN] [kN] [mm] [mm] [mm] [mm] U-Bügel [mm] [mm]
WK 2.0 20 10 170 8 30, 30, 50, 50, 125 12 2 6 500
WK 2.5 25 12,5 190 8 30, 30, 50, 50, 125 14 2 8 500
WK 4.0 40 20 260 10 30, 50, 50, 50, 50, 150 16 2 10 600
WK 6.3 63 31,5 300 12 30, 30, 50, 50, 50, 150 20 4 8 700
WK 8.0 80 40 360 12 30, 50, 50, 50, 50, 50, 250 25 4 10 750
WK 10.0 100 50 380 14 30, 50, 50, 50, 50, 50, 250 25 4 10 900
WK 12.5 125 62,5 400 16 30, 50, 50, 50, 50, 50, 250 25 4 12 950
WK 15.0 150 75 450 20 30, 50, 50, 50, 50, 50, 50, 300 28 4 14 1000
WK 20.0 200 100 600 20 30, 50, 50, 50, 50, 50, 50, 50, 50, 300 28 4 16 1500

Pos. 1 :
d WK 6.3, 8.0, 10.0 U-shaped stirrup

Si WK 2.0, 2.5, 4.0 WK 12.5, 15.0, 20.0 for erection

1 1

d
l

Øu
ØBü 1 1
ØL 1

30
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Installation FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Lifting device
Fixing screw Anchor
with wing nut

Caution: If the recessing block is too small, later attachment


with the lifting device is not possible. If the recessing block is too
large, correct attachment of the lifting device is also not possible; there
is the risk of the WK Quicklift slipping out. Premature failure of the anchor
and falling of the structural element can be the consequence. The size of
recess block identified as appropriate must be used.

Lifting anchor
Notice: In this case, minimum dimensions in Tables 1 & 2 in the
section on Dimensioning were used! It is compulsory to comply with
these.

Notice: For correct and safe attachment of the lifting anchor to the
formwork the suitable system-specific PFEIFER fixing accessories
must be used.

Installation tolerances

OK
_ 10% d
> _ 10% d
>
NO! NO !

_ 5° N
< _ 5°
<
O! NO!
OK

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Tensile load 0 – 45°


Transversal shear load OK
Temperature -20 to 80 °C

OK

visual check
discarding time

discarding time

Yes

Further use

No

31
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: With incorrect use by loading perpendicular to the plane


0° of the slot of the suspension ball (transversal shear load in the
45° wrong direction) there is the risk of slipping out.
OK
Warning: Loading the WK Quicklift beyond the permitted angle
NO!
leads to reduced safety levels in the system, falling and danger to

A
OK

K-
W

life. Loading of the lifting devices according to figure only.


90°

Caution: If the markings are missing or illegible the lifting


devices cannot be correctly allocated to the anchor. This can result
in items falling and causing a hazard to life and limb. Lifting devices and
Information on the markings: anchors with absent or illegible markings must be immediately taken out of
Notice: Use the markings
- Type/Size service.
on the anchor and lifting
- Year of manufacture
device to check that the
- EC marking
system parts belong
- Manufacturer
together.

Misuses FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Warning: Use of the anchor by untrained personnel results in the Caution: Incorrect use can result in safety hazards and reduced car-
risk of incorrect use and the risk of items falling down, causing rying capacity. This results in the risk of a fall and a hazard to life
injury or death to persons. Use only trained personnel! and limb. Lifting anchor systems must be used only in accordance with the
instructions for installation and use and only by suitable and trained person-
nel.

Warning: Use of the anchor systems for lashing during transport


of the building component is not admissible since this can lead to
the load falling and so to injury and death of persons. These anchor sys-
tems must be used only for lifting and moving the stated precast concrete
elements.

Storage FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

OK NO ! Notice: Store the components of the WK system dry and protected.


There is a risk of corrosion if there are large temperature changes,
humid conditions or any contact with acids, road salt or sea water!

Warning: If anchors in structural elements spend long periods


in the open or in humid environments there is a risk of knife-sharp
pitting corrosion in the outlet area, which can seriously damage the
carrying capacity of the anchors. This can occur without visible traces of
corrosion. Therefore anchors without corrosion protection are not usable
for long periods in environments that promote corrosion.

32
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Lifting device
Lifting anchor

33
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Makes transporting
effortless: matching
accessories
PFEIFER accessories are part of the recognised PFEIFER WK
system. They are the right items for the user and the usage, give
added value and are perfectly matched to the rest of the range.

System
The range of accessories includes the WK moulding
insert for safe attachment of the WK anchors to the
formwork and PFEIFER fixing screws.

PFEIFER accessories
• Multilayer sealing lips prevent concrete slurry from
penetrating into the moulding insert
• Safe and reliable formwork fixing
• Correctly sized hollow for optimal grip of the WK
Quicklift

Made in Germany
• Safe manufacture under consistent conditions
• In-house quality assurance
• Continuous product development

34
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER WK moulding inserts
Item-No. 05.181

Lifting device
WK System
Accessories

The WK moulding insert enables the


WK/DR anchor to be safely and relia-
bly fixed to the formwork. It is a part
of the PFEIFER WK system. After the
form stripping it is removed and lea-
ves behind the correctly-sized hollow
in the concrete, into which the WK
Quicklift fits to attach to the anchor
head.

Lifting anchor
Material:
Rubber
Retaining plate

Thread

Accessories
Ref.-No. Ref.-No. Type/Size Thread Dims., [mm] Weight approx. kg/piece
with thread plate with thread pin M R D d
05.181.013 05.191.013 WK/DR 1.3 M 8 30 60 7 0.11
05.181.025 05.191.025 WK/DR 2.0/2.5 M 10 37 76 7 0.15
05.181.040 05.191.040 WK/DR 4.0/5.0 M 10 47 97 11 0.30
05.181.063 05.191.063 WK/DR 6.3/7.5 M 10 59 121 11 0.51
05.181.100 05.191.100 WK/DR 8.0/10.0 M 10 59 121 11 0.50
05.181.125 05.191.125 WK/DR 12.5 M 10 80 165 11 1.20
05.181.150 05.191.150 WK/DR 15.0 M 10 80 165 11 1.20
05.181.200 05.191.200 WK/DR 20.0 M 10 80 165 11 1.20

Sample order for


50 PFEIFER WK moulding inserts WK/DR 4.0/5.0:
50 PFEIFER WK moulding inserts Ref.-No. 05.181.040

35
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
PFEIFER fixing screws
for WK moulding inserts
Item-No. 05.206

WK System
Accessories

With PFEIFER fixing screws, WK


moulding inserts can be safely and
quickly fixed to all formwork with
correct dimensions and angles.

Material:
Steel, galvanized

Ref.-No. for Size Dimensions [mm] Weight approx.


WK moulding insert d b e h kg/piece
05.206.083 WK/DR 1.3 M 8 60 80 120 0.11
05.206.103 WK/DR 2.0–20.0 M 10 60 110 150 0.19

Example order for 50 PFEIFER fixing screws M10, galvanized:


50 PFEIFER fixing screws, Ref.-No. 05.206.103

36
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Instructions for installation and use

System

Lifting device
FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

This application of PFEIFER accessories consists of:


– PFEIFER fixing screw
– PFEIFER WK moulding insert for the selected PFEIFER WK/DR anchor
Fixing screw

WK moulding insert

Lifting anchor
WK Anchor DR Anchor

Accessories
Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Installation: Fastening to the formwork: Removal of moulding insert:

WK moulding insert

DR Anchor
DR anchor
with eye

Notice: The wing nut of the fixing screw must be tightened enough Notice: Before each use, the WK moulding insert must be check
to press the whole moulding insert onto the formwork. Only that for usability. If there are apparent dimension differences or dama-
way is the gap between the two halves completely closed. ge, it must not be used again.

Caution: Under unfavourable conditions, e.g. storage of the moul-


ding insert in release agent, the volume of the moulding insert can
change. It should therefore be checked for the correct diameter before
each use. Measurement deviations greater than 5% mean that the WK
moulding insert should be discarded.

37
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Eagle eyes:
a sharp look at the
details
The following pages contain summarised technical information for
easier understanding and for simple and correct rapid application of our
products.

This information does not replace VDI/BV-BS 6205, but is only a short
overview. The VDI/BV-BS directive is always the only binding document
and must be strictly complied with.

Definition of
lifting anchor systems
Lifting anchor systems are normally used for lifting precast ele-
ments. These systems usually consist of a re-usable lifting device
and a lifting anchor cast into the concrete element.

They must operate reliably and safely. To achieve this, they must safely
absorb all stresses that occur during transport, the lifting operations
and assembly and introduce them into the structural element.

A failure of lifting anchors and lifting anchor systems can endanger


human lives as well as lead to significant damage. Therefore lifting
anchors and lifting anchor systems must be manufactured with high
quality, carefully selected and dimensioned for each application and
installed and used in accordance with regulations by suitable personnel.

The use of transport anchors and transport anchor systems is intended


to be for a single attachment of a precast concrete element. Multiple
attachment within the transport chain from manufacturing of a precast
element to the fitting comes within the definition of “single use”.

38
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Legal basis
The PFEIFER thread system complies with all requirements of the VDI/BV-BS 6205 directive, paper 2. This directive was produced for the safe development,
manufacture, testing, monitoring and use of lifting anchor systems for construction with precast concrete elements. It is divided into three parts:

Lifting device
Paper 1: General principles
Paper 2: Manufacture and placing on the market
Paper 3: Design and application

As shown in the following diagram, the three parts are relevant for different target groups

Manufacturer
Production of lifting anchors
and lifting anchor systems
Paper 2

Manufacturer

Lifting anchor
Planners
Paper 1 Planners
Users
Design of the precast ele-
General principles
ment taking manufacture
and lifting procedures into
account

Paper 3 Users
Production of the precast
element taking lifting
anchors and lifting anchor
systems into account

Accessories
For the manufacturer of lifting anchors, paper 2 of this directive represents the in regard to concrete failure can now be defined and provided in a uniform
first opportunity to meet the requirements of directive 2006/42/EC of the Euro- way for each manufacturer. This enables the user and planner to have a
pean Parliament and of the Council concerning machines, and thereby CE consistent basis for dimensioning.
marking the products. Lifting anchor systems must comply with this directive
to be able to be brought into the market. In particular the verification of safety

Term definitions FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Means of support
Means of support are equipment permanently connected to the hoist for
Means of

attaching lifting devices, attachment materials or loads.


support

Crane hook Attachment Material


Equipment, not part of the hoist, that creates a link between the means of
Load-carrying equipment

support and the load or between the means of support and the lifting device.
Attachment Material

Angle of inclination Lifting Anchor Systems


Construction units that consist of the part (lifting anchor) that remains long-
Gen. technical info

Wire rope sling term in the precast concrete element and the associated lifting device tem-
porarily attached to it.
Hook on wire
rope sling Lifting device
Equipment, not part of the hoist, that can be connected to the means of
Lifting device support of the hoist for taking up the load.
Lifting anchor
lifting anchor system

Steel item that is placed in the formwork before concreting and is concreted
in, remains in the precast concrete element and is intended solely as an
Lifting anchor

attachment point for attaching the precast concrete element directly to the
Load

means of support of the hoist or to the hoist through an intermediary lifting


device or attachment material and does not have a function in the installed
state of the structural element.

precast concrete element

39
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Safety concept FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

The stresses and resistances indicated in this VDI/BV-BS directive 6205 failure in addition to the European machinery directive which considers
are to be understood as recommendations for creating an adequate level of steel failure only ostensibly and seemingly. In determining the permissible
safety, taking account of the European machinery directive. They are based resistance of the anchorage of lifting anchors and lifting anchor systems,
on defect-free manufacture, fitting and dimensioning and on compliance with the concept of permissible loads (resistances) with global safety factors is
the rules of a quality management system. Predictable incorrect uses must to be applied. The safety concept requires the stress E not to exceed the
be accounted for. Partly also on the part of the precast plant (see also VDI/ admissible value of resistance R. The following evidence is to be provided:
BV-BS directive Part 3). Determination of the resistance of the lifting anchor
incorporated into the concrete and of the necessary additional reinforcement
must be done for all predicted directions of loading and possible types of

E ≤ Radm
In this, the symbols are

E applied stress
Radm admissible load (resistance)

The admissible load (resistance) of the anchorage of lifting anchors and lifting anchor systems is determined, according to this directive, as follows:

Radm = Rk/γ
In this, the symbols are

Rk characteristic resistance of an anchorageg


γ global safety factor, factor for covering uncertainties in stress and resistance

Possible types of failure of a lifting anchor FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Failure type Fracture pattern: tensile force Fracture pattern: transversal shear force

concrete outbreak
Type of failure characterised by
a concrete breakout of wedge or
cone shape, torn out of the anchor
surroundings and starting at a
lifting anchor.

localised concrete outbreak


(blow-out)
Concrete spalling at the side of
the component that contains the
anchor, at the level of the form-
fitting load application by the lifting
anchor into the concrete without
a large concrete break-out at the
concrete surface.

rear breakout of concrete


Failure type characterised by the
concrete breaking out opposite
the direction of stress, on lifting
anchors with a shear load.

40
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Failure type Fracture pattern: tensile force Fracture pattern: transversal shear force

Failure type: pull-out

Lifting device
Failure type identified by large
shifts and a small concrete break-
out near the surface, that can
occur when the lifting anchor is
pulled out of the concrete.

Failure type: splitting


Type of concrete failure in which
the concrete splits along a plane
that runs through the axis of the
lifting anchor(s).

Lifting anchor
Failure type:
fracture of the lifting anchor steel
Type of failure characterised by the
fracture of steel parts of the lifting
anchor.

Failure type:

Accessories
failure of additional
reinforcement
Failure of steel of a reinforcement
directly or indirectly loaded by the
lifting anchor.

Accounting for predictable incorrect uses FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS
Gen. technical info

According to the Product Safety Act (Germany: ProdSG), not only hazards 2. The appropriate lifting devices are used.
arising in correct use but also those in predictable incorrect use must be 3. All the required information is supplied to the transport and assembly
accounted for. Manufacturers and distributors of lifting anchor systems must operator in the form of written assembly instructions.
reduce possible hazards by means of appropriate designs, markings and clear 4. In the factory, suitable transporting and suitable storage are provided.
information in the instructions for installation and use.
Planners of precast elements must include, in their assembly instructions, all
Manufacturers of precast concrete elements can largely exclude hazards the relevant loading cases from production through storage to transport and
from predictable incorrect use by complying with the following conditions assembly into the building. These instructions must also include predictable
as in VDI//BV-BS 6205, Part 3: incorrect usage. The built up documentation must be made available to the
1. Installation of the anchors in accordance with the manufacturer‘s valid ins- operators.
tructions for installation and use, with appropriate personnel as indicated
by the planner.

41
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Dimensioning of lifting anchor systems FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

For the safe dimensioning of lifting anchor systems for precast concrete To determine the correct size of lifting anchor, the stresses in the direction
elements, the following points must be made clear at the start: of the wire rope sling must be determined for all load cases. These stresses
- The type of the structural element and the geometry must then be compared with the applicable resistance values for the type of
- Weight and location of centre of gravity of the structural element loading case. Here, stress ≤ resistance always applies.
- Directions of the loads on the anchor during the whole transport process,
with all loading cases that occur.
- The static system of taking the loads

Directions of stress

Straight pull
Load or load components that act
in the direction of the longitudinal
axis of the lifting anchor.

Parallel shear pull


Simultaneous loading by an axial
load and a transversal shear pull, β
acting at an angle � to the longi-
tudinal axis of the lifting anchor in
the plane of the component.

Transversal shear pull parallel


to the structural element plane 90°
Load or load component parallel
to the surface of the building
component and to the compo-
nent plane, acting at an angle �
perpendicular to the longitudinal
axis of the lifting anchor.

Transversal shear pull


perpendicular to the structural 90°
element plane
Load or load component par-
allel to the building component
surface and perpendicular to the
surface of the component.

42
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
1. Force due to weight of precast element FG

FG = V · ρG

Lifting device
with
V = volume of precast element in m3
ρG = specific weight of concrete in kN/m³

2. Formwork adhesion Fadh Table 1 - minimum values of formwork adhesion qadh

Formwork type and surface texture qadh in kN/m2

Fadh = qadh· Af Lubricated steel formwork,


lubricated plastic-coated shutter panel
≥ 1.0

Painted timber formwork ≥ 2.0


with
qadh = base value of formwork adhesion as in Table 1 Bare timber formwork ≥ 3.0
Af = contact area between concrete and formwork in m²

Lifting anchor
3. Dynamics factor ydyn

During lifting, and also during transport, the lifting anchor systems are
exposed to dynamic stresses that depend mainly on the type of hoist and the
nature of the terrain. The following table gives approximate values for general
dimensioning.

Boundary conditions Dynamic factor


ψdyn

Tower crane, gantry, mobile crane 1.3

Lifting and transporting on even terrain 2.5

Accessories
Lifting and transporting on uneven terrain ≥4

4. Shear pull factor z

Determination of increased load due to angle of inclination β to the vertical.

1
z = cosβ

5. Providing verification

Load type Fracture pattern: tensile force Verification


Gen. technical info

Lifting with formwork adhesion


(FG+Fadh) · z
FQ = n
FQ VR, adm
(FG / 2) · ψdyn
Erecting
FQ = n FQ VR, adm
FQZ = (FG / 2) · ψdyn · z FQZ VR, adm
n

Fz = F · ψn
Lifting, transporting
·z
G dyn
FZ NR, adm
n = number of lifting anchors sharing the load
43
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Example elements
Use

Ftotal
β

Load type: Transport


Fz -n=2
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

Ftotal

Load type: Transport


- n = 2 (no compensation within the pairs of anchors)
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

Ftotal

Fz Load type: Transport


- n = 4 (compensation within the pairs of anchors)
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

Ftotal

Load type: Transport


- n = 2 (no compensation within the pairs of anchors)
- Shear pull factor z = 1
- No formwork adhesion
- Lifting load factor as in Table 1

Load type: Lifting of formwork


Ftotal -n=4
- Shear pull factor z ≥ 1 (depends on angle β)
- Formwork adhesion!
α
β - no lifting load factor

Load type: Transport


-n=4
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

44
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Load type: Lifting of formwork
Ftotal
-n=2
- Shear pull factor z ≥ 1 (depends on angle β)
α - Formwork adhesion!

Lifting device
Fz β - no lifting load factor

Load type: Transport


-n=2
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

Load type: Lifting of formwork


Ftotal -n=3
- Shear pull factor z ≥ 1 (depends on angle β)
β - Formwork adhesion!
Fz - no lifting load factor

120° 120° Load type: Transport


-n=3
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion

Lifting anchor
- Lifting load factor as in Table 1

Ftotal Load type: Lifting of formwork


-n=3
- Shear pull factor z ≥ 1 (depends on angle β)
β - Formwork adhesion!
Fz - no lifting load factor

Load type: Transport


120° 120° -n=3
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

Load type: Lifting of formwork


Ftotal -n=4
- Shear pull factor z ≥ 1 (depends on angle β)

Accessories
α - Formwork adhesion!
β - no lifting load factor
Fz

Load type: Transport


-n=4
- Shear pull factor z ≥ 1 (depends on angle β)
- Formwork adhesion
- Lifting load factor as in Table 1

Load type: Lifting of formwork


-n=2
Ftotal - Shear pull factor z = 1
FG/2
- Formwork adhesion!
- no lifting load factor
FQ FG/2
Load type: Deposit/Erecting
-n=2
γ - Shear pull factor z = 1
Gen. technical info

- No formwork adhesion
- Lifting load factor as in Table 1

Load type: Lifting of formwork


-n=2
FG/2 - Shear pull factor z ≥ 1 (depends on angle β)
Ftotal - Formwork adhesion!
β - no lifting load factor
FQZ FG/2
Load type: Deposit/Erecting
-n=2
γ
- Shear pull factor z ≥ 1 (depends on angle β)
- No formwork adhesion
- Lifting load factor as in Table 1

45
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Ftotal
FG/2
- Load type: Deposit/Erecting
-n=2
FQ
- Shear pull factor z = 1
FG/2 - No formwork adhesion
- Lifting load factor as in Table 1
γ

FG/2
Ftotal - Load type: Deposit/Erecting
β -n=2
- Shear pull factor z ≥ 1 (depends on angle β)
FQZ FG/2 - No formwork adhesion
- Lifting load factor as in Table 1
γ

Installation FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

To ensure adequate bonding, install only clean, oil-free lifting anchors with no Suitable/qualified personnel
deposit build-up and non-greased steel wire cables. If there is any doubt they
must be carefully cleaned. Personnel who, through professional training, professional experience and
Installation of the lifting anchors must be as indicated by the manufacturer‘s recent professional activity, have the required specialist knowledge, have been
installation instructions and by the planner and be done by qualified personnel. instructed about the required work and are mentally and physically suited and
Subsequent insertion of lifting anchors into the fresh concrete must be done who can be expected to perform the required actions reliably.
competently and should be the exception.
In particular it is only permissible if: The marking of the lifting anchor must also be clearly recognizable after
- no additional reinforcement is necessary to ensure the carrying capacity and installation in the precast element. In each case the durable and clearly
- the concrete is still sufficiently fluid that it can be properly compacted to recognisable identification of the lifting anchor must ensure an unambiguous
ensure bonding assignment of the compatible lifting device.

Use FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

Before lifting the precast elements, care must be taken to ensure that com- personnel is required.
patible lifting devices are used, taking account of the PFEIFER instructions for Transporting and assembling the precast elements must be done by qualified
installation and use of the WK system. personnel and with regard to the indications of the planner.
Incorrectly installed or dirty lifting anchors or any with damage such as cor- The specifications in the transport and assembly instructions as in VDI/BV-
rosion or visible distortion must not be used for attachment. BS 6205 section 6.8 must be followed.
The load capacity of lifting anchors can also be affected by damage to the
concrete element (cracks, chips). In these cases an assessment by qualified

Closing the anchors or recesses FOR PLANNERS · FOR PRECAST PLANTS · FOR USERS

After they have been used, anchors should be closed by appropriate means.

46
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Lifting device
EC Declaration of Conformity
according to the EC machinery directive 2006/42/EC, appendix II 1A

The manufacturer PFEIFER Seil- und Hebetechnik GmbH

Lifting anchor
Dr.-Karl-Lenz-Straße 66
D-87700 Memmingen

declares that the lifting devices‚ PFEIFER WK system‘ according to article 2 d), consisting of the following system components:

PFEIFER WK anchor, 2.0, 2.5, 4.0, 6.3, 8.0, 10.0, 12.5, 15.0, 20.0
PFEIFER DR anchor, 1.3, 2.5, 5.0, 7.5, 10.0, 15.0, 20.0
PFEIFER WK Quicklift, 1.3, 2.5, 5.0, 10.0, 20.0
PFEIFER DR anchor with eye, 1.3, 2.5, 5.0, 7.5, 10.0, 15.0, 20.0

on the basis of their design and construction are compliant with the requirements of the directive 2006/42/EC of the European Parliament and the Council of 17th
May 2006 concerning machines and with the amendment to the directive 95/16/EC (in short: EC machinery directive 2006/42/EC).

Applied harmonised standards


– EN ISO 12100:2011-03
Safety of machinery – general design principles – risk assessment and risk reduction

Other applied standards or specifications

Accessories
– Directive VDI/BV-BS 6205:2012-04
Lifting anchors and lifting anchor systems for precast concrete elements
principles, design, applications

The person responsible for the creation and maintenance of the technical documentation is
– Herr Dipl.-Ing. Christoph Neef
Manager, Development Connecting and Lifting Systems, PFEIFER Seil- und Hebetechnik GmbH

PFEIFER Seil- und Hebetechnik GmbH


Memmingen, 05.12.2012

Gen. technical info

Dipl.-Ing. Matthias Kintscher Dipl.-Ing. Christoph Neef


Manager, Business Area Connecting and Lifting Systems Manager, Development Connecting and Lifting Systems

47
© 2012 Copyright, PFEIFER, 87700 Memmingen / Translation of the original operating instructions / Technical modifications and errors excepted. Status 11/2012
Headquarters Our products are sold by:
PFEIFER SEIL- UND
HEBETECHNIK GMBH
Dr.-Karl-Lenz-Straße 66
D-87700 MEMMINGEN
Telefon +49(0)8331-937-312
Telefax +49(0)8331-937-342
E-Mail export-bt@pfeifer.de
Internet www.pfeifer.de
Lifting Anchor Systems J&P Sales Department in Ukraine
Connecting and Lifting Systems JORDAHL&PFEIFER
Thread System TECHNIKA BUDOWLANA
in Germany
ul. Pawáyka 17a
Nobelstraße 51-55 76-018 IVANO-FRANKIVSK
Lifting Anchor Systems D-12057 BERLIN Tel. +38067442-85-78 (Eastern Region)
Tel. 030-68283-02 Tel. +38067442-85-79 (Western Region)
BS Anchor System Fax 030-68283-497 E-Mail info@j-p.com.ua
E-Mail info@jordahl.de
Internet www.jordahl.de in Hungary
Lifting Anchor Systems PFEIFER GARANT KFT.
Am Güterbahnhof 20 Gyömröi út 128
WK Anchor System D-79771 KLETTGAU HU-1103 BUDAPEST
Tel. 07742-9215-20 Tel. +36-1-2601014
Fax 07742-9215-90 Fax +36-1-2620927
E-Mail klettgau@jp-bautechnik.de E-Mail info@pfeifer-garant.hu
Fixing Systems Internet www.h-bau.de
DB Anchor 682 in Singapore
Fundlandstraße 29 J&P BUILDING SYSTEMS PTE LTD.
for Permanent Fixing D-45326 ESSEN No. 48 Toh Guan Road East
Tel. 0201-28966-0 #08-104 Enterprise Hub
Fixing Systems Fax 0201-28966-20 SG-SINGAPORE 608586
E-Mail essen@jp-bautechnik.de Tel. +65-6569-6131
Socket Dowels
Hamburger Ring 1 Fax +65-6569-5286
Polyamide Sockets E-Mail info@jnp.com.sg
D-01665 KLIPPHAUSEN/Dresden
Fixing Systems Tel. 035204-215-11 in Brazil
Fax 035204-215-18 PFEIFER CABOS DE AÇO E
HK Assembly Anchor System E-Mail dresden@jp-bautechnik.de SISTEMAS DE IÇAMENTO LTDA.
S

Markircher Straße 14 Rua da Regeneração, 465


D-68229 MANNHEIM 21040-170 RIO DE JANEIRO
Connection Systems
N

Tel. 0621-4840340 Tel. +55-21-2560-0673


Column Shoe System Fax 0621-4840344 E-Mail info@pfeifer-brasil.com
E-Mail mannheim@jp-bautechnik.de
O

Wall Shoe System in the UAE


Lechstraße 21 EMIRATES GERMAN BUILDING
Connection Systems MATERIALS TRADING (LLC)
I

D-90451 NÜRNBERG
Tel. 0911-6427808 P. O. Box 18917
Stell Bearing UAE-DUBAI
T

Fax 0911-6428472
Staircase Bearing VarioSonic E-Mail nuernberg@jp-bautechnik.de Tel. +971-4-2676644
Fax +971-4-2676646
A

Connection Systems in Denmark E-Mail gemirate@emirates.net.ae


Sandwich Anchor System JORDAHL & PFEIFER in Switzerland
C

Delta Anchor System BYGGETEKNIK A/S ISOFER AG


Risgårdevej 66, Risgårde Hasentalstraße 8
O

Connection Systems DK-9640 FARSØ CH-8934 KNONAU


Tel. +45-9863-1900 Tel. +41-44-7685555
Concrete Earthing System BEB Fax +45-9863-1939
L

Fax +41-44-7685530
E-Mail info@jordahl-pfeifer.dk E-Mail info@pfeifer-isofer.ch

Reinforcement Systems in the United Kingdom


in France J&P BUILDING SYSTEMS LTD.
R

VS ®-Wire Rope Loop System JORDAHL H-BAU Unit 5 Thame Forty


FRANCE SARL (siège) Jane Morbey Road
7, rue des Vallières Sud
U

GB-THAME, OXON OX9 3RR


25220 CHALEZEULE Tel. +44-1844-215200
Reinforcement Systems Tél +33-3 81 25 04 65 Fax +44-1844-263257
O

PH Reinforcement Continuity System Fax +33-3 81 25 07 96 E-Mail enquiries@jandpbuildingsystems.com


E-Mail info@jordahl-hbau.fr
in Czechia
Cable Tension Members JORDAHL & PFEIFER
in Spain STAVEBNI TECHNIKA S.R.O.
Tension Rod System PFEIFER Cables y Equipos de Bavorská 856/14
Ekvacion, SLV. CZ-15500 PRAHA 5
Avda. de los Pirineos, Tel. +420-272700701
25 – Nave 20 Fax +420-272703737
Attachment Materials San Sebastián de los Reyes E-Mail info@jpcz.cz
(Wire Ropes, Chains, Textiles) ES-28703 MADRID
Tel. +34-916593185 in Romania
Fax +34-916593139 S.C. JORDAHL & PFEIFER
E-Mail jp@jp-anclajes.com TEHNICÃ DE ANCORARE S.R.L
Lashing Systems ES-08820 BARCELONA Str. Malului Nr. 7, et.1
Tel. +34-93-3741030 RO-550197 SIBIU JUD. SIBIU
Fax +34-93-3741459 Tel. +40 269 246 098
Fax +40 269 246 099
E-Mail info@jordahl-pfeifer.ro
Grabs for Reinforcing Steel in Russia
OOO PFEIFER in Poland
Balancing Spreader Beams
KANATI & PODJÖMNIE TEHNOLOGII JORDAHL & PFEIFER
11.12.95 AB/MMC 228532

RU-119017 MOSCOW TECHNIKA BUDOWLANA SP. Z O.O.


Pyzhevskiy pereulok, ul. Wrocáawska 68
h.5, bld.1, office 108 PL-55-330 KREPICE k/Wrocáawia
Tel. +7-495-363-01-27 Tel. +48-71-3968264
This document is superseded when a new edition appears Fax +7-495-363-01-28 Fax +48-71-3968105
at www.pfeifer.de. E-Mail info@pfeiferrussia.ru E-Mail biuro@jordahl-pfeifer.pl
For all other export countries please contact our headquarters in Germany.

You might also like