Email Id: srilvfabricator@gmail.

com Cell No: 9916822479

Sri Lakshmi Venkateswara Fabricators


#49, Belmar Estate, Mattaih Main Road, Rukmin Nagar, Nagasandra Post, Banagalore-73

To,

Page Industries, Mysore QUOTATION

All Fabrication works & Civil works U16 Mysore


SL.NO Description of work Qty UOM Cost/UOM Total cost in RS
1 Removal of weld mesh partition 3300 sq.ft 40 132000
2 Refitting of weld mesh partition (Including height from 11' to 10') 3300 sq.ft 45 148500
3 New mesh mesh partition 320 sq.ft 112 35840
4 Aluminium partition -Removal 810 sq.ft 35 28350
5 Aluminium partition -Refitting (With clip rubber & D- Rubber) 810 sq.ft 45 36450
Aluminium partition -New

6 600 sq.ft 220 132000

Diesel storage & Oil storage room Bison sheet wall fabrication work (As per
BOQ-1)

7 1 LS (BOQ-1) 24000 24000

DG chimney Stack point extension work with ladder (As per BOQ-2)

8 1 LS (BOQ-2) 24800 24800


Email Id: srilvfabricator@gmail.com Cell No: 9916822479

Sri Lakshmi Venkateswara Fabricators


#49, Belmar Estate, Mattaih Main Road, Rukmin Nagar, Nagasandra Post, Banagalore-73

Civil work-SS Chut Removal work,RCC packing, plastering, tiles work,


painting work at chut area (As per BOQ-3)

LS (BOQ-
9 1 58000 58000
3)

True ceiling/wall/Floor drilled patch holes packing,cutting anchor


10 bolts in ceiling, paint touch-up-All floors around 2000+ holes packing- 1 LS 50000 50000
Labour charges with material (White cement, lappa, paint)

Roofing sheet cover for extrenal stair case with structural work (As
per BOQ-4)

11 800 sq.ft 260 208000

12 Compressor room civil work (As per BOQ-5) 1 LS 134360 134360

Fabrication work support to convert trimming table to roaming QC


13 table- With fixing of 2" PU wheels, Wheel base 2" flat with 5mm thick, 25 Nos 1100 27500
top fixing with screws with necessary drilling

Checking table lighting frame fabrication work by 30mm CR tubes, 16


14 60 Nos 980 58800
SWG, 1.5” tube light fixture channel & W3’xH1.5’, painting

Sum in rupees 1098600


GST 18% 197748
Total amount in Rupees 1296348
Note: Above price includes all materials, consumables, labour charges, accommodation, transportation charges, scaffold charges, tools &
equipment charges etc etc under vendor scope

Terms & Conditions:

1. 50% Advance payment


2. Above quote as per BOQ, additional work will be charged extra
Email Id: srilvfabricator@gmail.com Cell No: 9916822479

Sri Lakshmi Venkateswara Fabricators


#49, Belmar Estate, Mattaih Main Road, Rukmin Nagar, Nagasandra Post, Banagalore-73

BOQ NO-5, For Civil work - U16 Compressor Room

Required
SL.NO Item Description UOM Cost/UOM Sum in RS
Qty

Panel board shifting & Cable laying work


* Excavation of ground 20 feet length & 1 feet depth
1 LS 1 20000 20000
* Withdrawal of cable & panel Shifting
* Packing the ground with cable laying

Concrete bed work:


*4’Wx4’Dx1’H bed for Receiver tank & 2ft chamber with cover for
drain water (Including all material Cement, M sand, M20 Jelly, MS
metal rods)
* Excavation & packing foundation bed for 4'x4'x1/2' H with PCC
2 M20 Aggregates, M- Sand & Ultratech cement 0.68 cubic meter LS 1 30000 30000
* RCC 2:2:1 Concrete Bed of size 4'x4'x1' x1nos = 0.91 cubic meter
for receiver tank with 8mm MS rod bar beading
* Excavation to make pit of size 2.5'Wx2.5H'x 3'D & 3 inch width
concrete chamber with cap along with 6mm MS bar beading 0.17
cu.m

Supply of Cast Iron LID cover : Cast iron Chamber cover 2'x2' with
3 LS 1 2500 2500
10mm thickness

Removal of old GI duct & Packing the wall cores


4 LS 2 4500 9000
* Packing with hallow block 8 nos & 3/4" plastering work 0.12 cu.mt

Cutting the new GI Duct cores in wall of size 2’x2’


5 * Wall core cutting, finishing work of wall, paint touch-up . 0.21 LS 3 4500 13500
cu.mt hallow blocks packing & plastering work

Pumping water from chamber to drain: Kirloskar 0.5 hp self priming


6 Nos 1 4500 4500
pump with fixture

7 Ashirvad 3/4" CPVC Pipe with 1 lit solvent mtrs 66 140 9240
8 Ashirvad 3/4" CPVC Pipe bends Nos 10 48 480
9 Ashirvad 3/4" CPVC Pipe collars Nos 12 30 360

Excavation of ground to 1 feet deep & laying 3/4" CPVC pipe with
10 Mtrs 60 140 8400
repack of interlocks

11 GI Coated-light white colour- Roof sheet -Jindal make 8'x3' Nos 5 2900 14500
12 Supply of MS L angle 1.5", 4 mm thick-20 feet length Nos 5 1800 9000

Fabrication work of frames for sunshade roof, cable tray clamps,


with erection
13 Ls 6 1800.0 10800
* Providing rainwater sunshade to windows & main door to avoid
rain water entry to compressor room

14 Supply of 10 mm anchor bolt & nuts Nos 20 70 1400


15 Metal Primer Lit 1 280 280
16 Paint- Sky Blue Lit 1 400 400
Total (without GST) This cost included in SL.No 12 in main quotation 1,34,360

Note: Above cost including supply of material, erection, labour charges, transportation, other fabrication consumables in vendor scope