F2000v1 9
F2000v1 9
F2000v1 9
Andrea Krueger
1.8 4/30/2017 / Scott Ball
Notes
Added Revisions History Tab, Updated PSW to unclude IPS specific information for Level 1, Added PRINT
NOTES - Performance Tests Tab and updated PRINT NOTES - Welding with attaching copies of
WPS/PQR; finished update of tab footers
Updated PPAP Requirements tab with N/R information and * specific reqs. Removed buyer Number from
PSW; Added conditional formatting to the dimensional tab, split the paint tab into 2 tabs (paint and plating)
& Appearance Approval Tab update, added "Format for example only; Supplier created templates may be
used" for any example template in the workbook
Added Section J labeling tab and PPAP requirements; Updates to PSW materials, reporting, paint
worksheet added surface profile, weld worksheet added piece 1-3, replaced ratings matrix for S,O,D, added
criticality matrix, added QC-112 PPAP check list, added QC-116 COTS exceptions form, added QC-112 to
PPAP requirements matrix and PSW check boxes, capability worksheet replaced with web link, DFMEA &
PFMEA worksheets replaced.
Revised the PSW citation to D.32 for the SSG. Removed QC-116 COTS exception form. Added C of C
Template. Revised QC-112 to include castings section and heading information automatic fill. Revised the
Detection ratings scale.
Oshkosh Corporation Classification: Unrestricted
Revision 1.9
February 12, 2018
PPAP INTRODUCTION
PPAP packages are expected to be received by Oshkosh Corporation by the date assigned by Oshkosh Corporation Designee. If for any
reason you cannot meet this date, contact Oshkosh Corporation Designee for resolution.
It is the policy of Oshkosh Corporation to approve initial samples of supplier provided parts before receiving production orders of those parts
Oshkosh has developed the PPAP PROCESS to facilitate this requirement.
The Default PPAP is Level 2, unless otherwise required by the Oshkosh Segment Quality Representative
PPAP requirements apply to the following parts:
1) Initial submission
2) Engineering Change(s)
3) Tooling: Transfer, Replacement, Refurbishment, or additional
4) Correction of Discrepancy
5) Production Break to Oshkosh Corporation > 1 year
6) Change to Optional Construction or Material
7) Sub-Supplier or Material Source Change
8) Change in Part Processing
9) Parts produced at Additional Location
10) Other - please specify
Please reference the Oshkosh Corporation Global Supplier Quality Manual for more detail on PPAP
requirements. The Manual can be retrieved on the http://osn.oshkoshcorp.com/ website.
Oshkosh Corporation
PPAP Part Submission Requirements
Part Number: PART NUMBER Purchase Order No.
Revision Level: ERL Part Description: PART NAME
ALL PPAP CRITERIA
Supplier Name: SUPPLIER NAME Reason for Request: MUST CONFORM TO
Supplier Number: SUPPLIER NUMBER OSK Program: MODEL / VEHICLE Oshkosh Corporation Customer Specifics
Date Issued: Submission Due Date: defined in the Global Supplier Quality
Manual
Submission Level
PPAP Submission Requirements and Detail Description 1 2 3 4
1.) Part Submission Warrant (PSW) S S S S
2.) Dimensional Results N/R S S S
3.) Design Records (Bubble Print) N/R S S S
4.) PPAP Samples - first production order / upon request prior to production order N/R S S S
5.) Print Notes: (Attach copy of Raw Material Certification / Performance Test Report / Surface Finish, Paint Process, Welding
Documentation such as WPS/PQRs/Welder Certs) * S S *
6.) Supplier Change Request (OSK-F1000) - if applicable S S S S
7.) Design Failure Modes effects Analysis (DFMEA) - if supplier is design responsible N/R N/R S N/R
8.) Process Flow Diagram (PFD) N/R N/R S N/R
9.) Process Failure Modes Effects Analysis (PFMEA) N/R N/R S N/R
10.) Initial Process Capability - for major / critical characteristics - if applicable N/R N/R S N/R
11.) Measurement System Analysis (MSA) - for major / critical characteristics - if applicable N/R N/R S N/R
12.) Process Control Plan N/R N/R S N/R
13.) Appearance Approval Report (AAR) - if applicable N/R N/R S N/R
14.) Checking Aids (Fixture, gage, template, etc) - if applicable N/R N/R S N/R
15.) Records of Compliance with Customer Specific Requirements - if applicable N/R N/R S N/R
16.) Photo Documentation (Master Sample of PPAP parts & Section J-Labeling) S S S N/R
17.) Tooling Photo Documentation - if applicable N/R S S N/R
18.) QC-112 PPAP Check List N/R N/R S N/R
Additional Submission Instructions below:
Send identified sample(s), such as, Piece#1, Piece#2, Piece#3, etc to Oshkosh Corporation with appropriate label.
Please complete and attach this page on the outside of each package in plain view of a fork lift/material
handler/operator. Put the Packing slip pocket near the label.
In the event parts are “Loose” shipped, a label should be placed on each part. This would also apply to parts
laying on pallets. Label on a painted part must be wire tied or attached in a way such that the painted surface
is protected from label adhesion.
Purchased Order#:
Part Number:
Revision Level:
Supplier Name:
Supplier Number:
ADDRESS
Street Address Buyer
MATERIALS REPORTING
Compliant to requirements stated in the Suppliers Standards Guide (Section D.32) referencing Hazardous Materials.
Yes No
REASON FOR SUBMISSION (Check at least one)
Initial submission Change to Optional Construction or Material
Engineering Change(s) Sub-Supplier or Material Source Change
Tooling: Transfer, Replacement, Refurbishment, or additional Change in Part Processing
Correction of Discrepancy Parts produced at Additional Location
Production Break to Oshkosh Corporation > 1 year Other - please specify
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Level 4
(Check items that have been submitted within this PPAP Submission)
I have noted on this part submission warrant any deviation from the associated design record and/or any areas of non-compliance to the Oshkosh
Corporation requirements. If Yes, Explain _____________________________________________________________________
_______________________________________________________________________________________________________________
Distribution authorized to US government agencies and their contractors, Reason: Administrative or Operational Use. Date of Determination (Part Submission Warrant
Supplier Completion Date). Other requests for this document shall be referred to: The Project Manager, Medium Tactical Vehicles, Attn: Engineering Director, Mail Stop
#500, 6501 East 11 Mile Road, Warren, MI 48397-5000 DSN 786-6622 or Commercial (586) 282-6622
Appearance Approval
Material Performance
Checking Aids
Results/Print Notes
Control Plan
DFMEA
PFMEA
Testing
MSA
Dimensional
2.2.18 2.2.9 2.2.1 2.2.2 2.2.4 2.2.5 2.2.6 2.2.7 2.2.11 2.2.8 2.2.13 2.2.16 2.2.10 2.2.12 2.2.14
Elements shaded green (above) indicate minimum submittal for interim approval
AIAG-PPAP PPAP Element
Commercial Off the Shelf (COTS) - (If Applicable)
Is this component (or a sub component) procured through a distributor?
1
Is this component (or sub component) commercially available to the general public under the
manufacturers’ part number AND / OR does the print state EAR99 (Commercial)?
2
Is OSK procuring the manufacturers part number in an unaltered state?
3
4 If the answers are "YES" to questions 1-3, then the below requirements are needed per the GSQM D
Are the minimum PPAP elements, including a product specification sheet, provided per GSQM
5 Defense Addendum 13.2?
Is a Certificate of Conformance on the company's letterhead affirming the following:
1.) Article is commercially available 2.) Part meets requirements of print 3.) Including part
number and revision level 4.) Signed by representative within organization that has decision
making authority?
6
COTS Plus - Are any performance requirements not satisfied by the testing outlined on the
product specification sheet / catalog page?
7
8 If the answer is "YES" in question 7, then supplemental testing and results are req
2.2.18 PSW
Is the current copy of the PPAP workbook utilized? (Note: See Oshkosh Supplier Network or
2.2.18 Reliance for latest revision- located: https://osn.oshkoshcorp.com)
2.2.18 Are all sections completed properly and the PSW signed and dated?
2.2.18 Does revision level & date on the PSW match the revision level & date on the drawing?
2.2.18 The PO # field is completed and it matches the drawing Rev/Date?
2.2.9 Are Standard or Metric units properly recorded according to the print ?
2.2.9 Are proper GAGE TYPES used for the specified tolerance (adequate discrimination)
2.2.9 Are proper GAGE TYPES used for the application (calipers / tape measures have limited use)
2.2.9 Are multiple dimensions ALL listed and ALL verified (example 2x's, 6x's, etc.)?
2.2.9 Are MSA / GRR / Capability Studies provided for Critical Characteristics?
2.2.9 Are Significant/Critical characteristics in bold print and easily found on report.
2.2.9 For multi-cavity tooling, at least 1 pc per cavity must have a complete layout
2.2.9 Print Notes
Are three pieces verified and the results recorded for each print note as required for Level 3
PPAP?
2.2.9
2.2.9 Is the Print Notes Report signed and dated?
2.2.1 Design Record
2.2.1 Is balloon drawing provided on OSK / AOPN drawing?
2.2.1 Is balloon drawing provided legible?
2.2.1 There are SC / CC's identified on the print? (no = NA)
The drawing or design record is correct and at the proper engineering/revision level and matches
2.2.1 P.O.?
2.2.4 DFMEA
The supplier is design responsible: The DFMEA is included within the PPAP OR there is a record
indicating it was reviewed & approved by OSK?
2.2.4
Does the print indicate that the component is "Source Control" or "Vendor Item Control"? (no = NA)
2.2.4
Significant Characteristics (Special/ Critical) are identified and captured within the DFMEA (no=
NA)
2.2.4
Oshkosh is design responsible: There are SC / CC's present on the print (no = NA)
2.2.4
Oshkosh is design responsible and the part is manufactured by OSK: Are the sub component
2.2.4 level PPAP's present with submittal? (no = NA)
Does the PPAP documentation cite specific print note requirements (associated with product or
process) in Flow / PFMEA/ Control Plan (For Example Mil-STD-130 Part Marking ID)
2.2.5
2.2.5 Does the Flow Diagram reflect the entire process (Receiving, outside processing)
2.2.5 Are the process steps for the Process Flow, PFMEA and Control Plan aligned?
2.2.6 PFMEA
Has the PFMEA been constructed utilizing the OSK ranking worksheet for Severity and
2.2.6 Occurrences?
Are there SC / CC identified by the Supplier? "NO" = N/A (refer to criticality matrix in Global
2.2.6 Supplier Quality Manual)
In cases where SC/CC have been identified, does the supplier have SPC or 100% inspection for
2.2.6 them noted in the current Control column?
2.2.6 Are Detection values correct for Visual Inspection per AIAG? (Minimum 7 or 8)
Does the PPAP documentation cite specific print note requirements (associated with product or
process) in Flow / PFMEA/ Control Plan (For Example Mil-STD-130 Part Marking ID)
2.2.6
This control plan covers all activities from receiving inspection to shipment.
2.2.7
The supplier is using Control Method tools such as SPC or 100% inspection for the Special
2.2.7 Characteristics defined?
Does the PPAP documentation cite specific print note requirements (associated with product or
process) in Flow / PFMEA/ Control Plan (For Example Mil-STD-130 Part Marking ID)
2.2.7
There are SC/CC identified (on print or supplier process): The supplier has a CPK of 1.33 for
Significant Characteristics and/or CPK of 1.67 for Critical Characteristics.
2.2.11
There are SC/CC identified (on print or supplier process) and the supplier instead of Capability
2.2.7 Studies, conducts 100% inspection, which is included on their control plan?
The initial process studies were conducted using the required number of samples and using
production processing, gauging and materials.
2.2.7
MSA
2.2.8
There are SC/CC identified (on print or supplier process) and MSA is included in PPAP?
2.2.8
The MSA has been constructed using the Defense Segment Instructions Guide (located:
2.2.8 https://osn.oshkoshcorp.com)
The MSA Report / Checklist was used to ensure completeness (included within the Defense
2.2.8 Segment Instructions Guide)
Appearance Approval
2.2.13
Checking Aids
2.2.16
The supplier has provided preventive maintenance / calibration records for the checking aides.
2.2.16
Do all aspects of the checking aids agree with part dimension requirements?
2.2.16
2.2.10 Material / Performance Testing
2.2.10 Are material certifications included for all requirements specified on the print?
Are material certification(s) provided (where no specification is given) to establish a base-line of
2.2.10 product acceptability
2.2.10 Are material certification(s) dated relatively recent? (within 12 months)
2.2.10 Are material certification(s) signed and dated?
2.2.10 Are foreign Certification(s) translated into English
2.2.10 Are material certification(s) provided for sub components
2.2.10 Are material certification(s) included for hardware called-out on the print?
2.2.10 Do certification(s) included explicitly support standards cited (example: SAE/MIL/ASTM)?
Does the submittal include actual salt spray test results including Qualified Lab Documentation?
Are the ASNT (American Society for Non-Destructive Testing) certified radiographic procedures
being approved by a level 3 Technician?
Are certifications submitted within the PPAP for personnel verifying compliance to ASNT
(American Society for Non-Destructive Testing)?
Are personnel performing radiographic inspections certified in accordance with NAS 410 Level 2?
Are the NAS 410 certified radiographic procedures being approved by a level 3 Technician?
Are certifications submitted within the PPAP for personnel verifying compliance to NAS 410?
Is the Inspection laboratory accredited (e.g. A2LA, ISO17025 for radiographic inspection per
ASTM E1742 (film) or E1255 (digital)?
Does the report include all images all routine and random positions or in accordance with the
positions chart (if provided)?
Does the report reference the correct inspection standards as stated within AMS 2175A (ASTM
E155/E2422 for aluminum, ASTM E186/E446 for steel, iron)
Does the report specify casting grade and does it match drawing requirements?
Does the report specify casting class and does it match drawing requirements?
Does the report include melt or heat lot numbers?
Is radiographic examination sampling conducted per the OSK Global Supplier Quality Manual
Addendum (section 10)?
Do radiographic images show that Image Quality Indicator (IQI) placement is compliant to 2-2T per
ASTM E1255 (digital) or ASTM E1742 (film)?
Does the print notes, PFMEA and/or Control Plan document address gate, riser and parting line
projections comply with AMS2175A table 3 (page 11 of 20)?
Does the control plan reflect radiographic sampling frequency in accordance with the print note /
Global Supplier Quality Manual?
Does the control plan specify that castings are 100% visually examined per AMS2175A, 4.3.1?
Is a written procedure listed within the Process Control Plan as to how to inspect the component
IAW E1255 (digital image), section A1.5.2 or E1742 (film image), section 6.1?
Requirements (CFAT)
Customer Specific
2.2.15 2.2.17
interim approval
PPAP Submission Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
Y N N/A Comments
x x N/A Comments
Supplier Name:
Supplier Number:
Part Description:
Part Number:
Drawing Number: Revision:
The following are the minimum PPAP elements that must be submitted with a COTS item.
I certify that the items / materials referenced above are commercially available.
I certify that the above mentioned items/materials meet the purchase order requirements and
referenced drawing specifications and standards. I also certify I am an authorized supplier
representative.
ion:
ally available.
Date
DIMENSIONAL RESULTS
ORGANIZATION: SUPPLIER NAME PART NUMBER: PART NUMBER
SUPPLIER NUMBER: SUPPLIER NUMBER PART NAME: PART NAME
PRINT NOTES
(ATTACH COPY OF RAW MATERIAL CERTIFICATION, SURFACE FINISH,
& PART IDENTIFICATION)
ORGANIZATION: SUPPLIER NAME PART NUMBER: PART NUMBER
SUPPLIER NUMBER: SUPPLIER NUMBER PART NAME: PART NAME
PRINT NOTES
(ATTACH COPY OF RAW MATERIAL CERTIFICATION, SURFACE FINISH,
& PART IDENTIFICATION)
ORGANIZATION: SUPPLIER NAME PART NUMBER: PART NUMBER
SUPPLIER NUMBER: SUPPLIER NUMBER PART NAME: PART NAME
PRINT NOTES
(ATTACH COPY OF PERFORMANCE TESTS )
PRINT NOTES
(ATTACH COPY OF PERFORMANCE TESTS )
Prime Coat:
Blast / Surface Profile
Thickness*
Thickness (including blast profile)*
Permeability
Adhesion
Oven Cure Time (if used)
Ambient Cure Time (if used)
Salt Spray
Top Coat:
Defense Segment: Compliant to the requirements stated in the Suppliers Standards Guide (Section
(Circle) Yes / No Signed by:
D.32) referencing Hazardous Materials.
PRINT NOTES
(PLATING TEST RESULTS)
Defense Segment: Compliant to the requirements stated in the Suppliers Standards Guide (Section
(Circle) Yes / No Signed by:
D.32) referencing Hazardous Materials.
Color Match
TopCoat Gloss
Crosshatch Adhesion
Solvent Resistence
Pencil Hardness
Refer to Applicable QACs and or Specification on print/PO (Contact Buyer)
Film Thickness (Powder)
Film Thickness (Liquid)
Production Adhesion Test
Orange Peel
Salt Spray Creepage
Edge Coverage
COLOR EVALUATION
Color Lot Part # SPECIFICATIONS
PRINT NOTES
(ATTACH COPY OF WPS/PQR DOCUMENTATION)
ORGANIZATION: SUPPLIER NAME PART NUMBER: PART NUMBER
SUPPLIER NUMBER: SUPPLIER NUMBER PART NAME: PART NAME
Criticality Matrix
10 <CC> Critical Characteristic
Must be addressed on Control Plan
9 with 100% inspection or 1.67 Cpk
Occurrence
Problem Detection Failure Mode detection post-processing by automated controls that will detect
4
Post Processing discrepant part and lock part to prevent further processing.
Detection not Error (Cause) prevention as a result of fixture design, machine design or part
1 applicable; Failure design. Discrepant parts cannot be made because item has been error-proofed
Prevention by process/product design.
This scale was adapted from the AIAG FMEA Manual (4th Edition)
Current Current
Action Results
Occurrence
Design Design Responsibility
Classification
Detection
Severity
Potential Potential Potential
Item / Recommended & Target
RPN
Requirements Failure Effect(s) Causes(s) Controls Controls Actions
Function Action(s) Completion
OCC
RPN
Mode of Failure of Failure
SEV
DET
Prevention Detection Date Taken & Effective
Date
PROCESS/INSPECTION FLOWCHART
(Format for example only; Supplier created templates may be used)
Legend:
Operation Transportation Inspection Delay Storage
Operation
Transportation
Inspection
Delay
Storage
Change History
Date Revision
Classification
Action Results
Occurrence
Process Process Responsibility
Detection
Severity
Process Step / Potential Potential Potential
Recommended & Target
RPN
Function Requirements Failure Effect(s) Causes(s) Controls Controls
Action(s) Completion Actions
OCC
SEV
DET
Mode of Failure of Failure Prevention Detection
Date Taken & Effective
Date
Action Results
RPN
CONTROL PLAN
(Format for example only; Supplier created templates may be used)
Prototype Pre-Launch Production
Control Plan Number Key Contact/Phone Date (Orig.) Date (Rev.)
1/1/1996 1/1/1996
Part Number/Latest Change Level Core Team Customer Engineering Approval/Date (If Req'd.)
PART NUMBER
Part Name/Description Supplier/Plant Approval/Date Customer Quality Approval/Date (If Req'd.)
PART NAME
Supplier/Plant Supplier Code Other Approval/Date (If Req'd.) Other Approval/Date (If Req'd.)
SUPPLIER NUMBER
PART/ MACHINE, CHARACTERISTICS SPECIA METHODS
PROCESS NAME/
PROCES DEVICE L PRODUCT/PROCESS EVALUATION/ SAMPLE REACTION
OPERATION
S JIG, TOOLS CHAR. SPECIFICATION/ MEASUREMENT CONTROL PLAN
DESCRIPTION NO. PRODUCT PROCESS
NUMBER FOR MFG. CLASS SIZE FREQ. METHOD
TOLERANCE TECHNIQUE
Supplier is required to provide sample of SSG Section J compliant label(s) and document with Photo in PPAP workbook
Supplier is required to identify all Oshkosh Owned Tools & Fixtures and document with Photo in PPAP workbook
Clock on the link below to access a template that will display control charts, histogram and Cp/Cpk results
Once the template has been populated you can copy and paste it onto this worksheet
http://asq.org/sixsigma/2008/05/process-capability-study-1500.html?shl=090025
ATTRIBUTE DATA
# XT a P'a After entering data, follow the directions on the tab marked
1 0.000 'Graph' to create the Gage Performance Curve
2 0.000
3 0.000
4 0.000
5 0.000
6 0.000
7 0.000
8 0.000
9 0.000
t Statistic
t = 31.3 IBI / R t0.025,19 = 2.093
=
=
Result
Reviewed
Title
Directions for Gage Performance Curve for Attribute Analytical Method Form
DATA TABLE
Reference
PART A-1 A-2 A-3 B-1 B-2 B-3 C-1 C-2 C-3 Reference Value Code
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Risk Analysis
A * B Crosstabulation
B
Total
0 1
0 Count 0 0 0
Expected Count
A
1 Count 0 0 0
Expected Count
Count 0 0 0
Total
Expected Count
B * C Crosstabulation
C
Total
0 1
0 Count 0 0 0
Expected Count
B
1 Count 0 0 0
Expected Count
Count 0 0 0
Total
Expected Count
A * C Crosstabulation
C
Total
0 1
0 Count 0 0 0
Expected Count
A
1 Count 0 0 0
Expected Count
Count 0 0 0
Total
Expected Count
Kappa A B C
A -
B -
C -
DETERMINATION
AxB
AxC
BxC
* D4 =3.27 for 2 trials and 2.58 for 3 trials. UCL R represents the limit of individual R's. Circle those that are
beyond this limit. Identify the cause and correct. Repeat these readings using the same appraiser and unit as originally used or
discard values and re-average and recompute R and the limiting value from the remaining observations.
Notes:
For information on the theory and constants used in the form see MSA Reference Manual, Third edition.
* D4 =3.27 for 2 trials and 2.58 for 3 trials. UCL R represents the limit of individual R's. Circle those that are
beyond this limit. Identify the cause and correct. Repeat these readings using the same appraiser and unit as originally used or
discard values and re-average and recompute R and the limiting value from the remaining observations.
Notes:
For information on the theory and constants used in the form see MSA Reference Manual, Third edition.
Note: The REFERENCE VALUE can be substituted for PART AVE to generate graphs indication true bias.
12
10 Appraiser A
8 Appraiser B
Appraiser C
6
Upper Spec
4 Lower Spec
2
0
1 2 3 4 5 6 7 8 9 10
Part Number
Analysis:
12
Range
10
Appraiser A
8
Appraiser B
6 Appraiser C
Rucl
4
2
0
1 2 3 4 5 6 7 8 9 10
Part Number
Analysis:
12
10
8
6
4
2
0
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
Appr A Appr B Appr C
Analysis:
12.000
10.000
8.000
6.000
4.000
2.000
0.000
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
Appr A Appr B Appr C
Analysis:
Run Chart
12
10
Value
0
1 2 3 4 5 6 7 8 9 10
Part
Analysis:
Scatter Plot
12
10
0
Part 3
Part 1
Part 2
Part 4
Part 5
Scatter Plot
12
10
8
6
4
2
0
Part 6
Part 7
Part 8
Part 9
Part 10
Analysis:
12
10
8
6
2
0
1 2 3 4 5 6 7 8 9 10
12
10
0
1 2 3 4 5 6 7 8 9 10
12
10
0
1 2 3 4 5 6 7 8 9 10
Analysis:
Error Chart
12
10
6
4
0
Part 1
Part 2
Part 3
Part 4
Part 5
Error Chart
12
10
8
6
4
2
0
Part 6
Part 8
Part 9
Part 7
Part 10
Analysis:
0.8
0.6
Appr A
0.4
0.2
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
-1 - - - - - - - - -
0.8
0.6
Appr B
0.4
0.2
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
-1 - - - - - - - - -
0.8
0.6
Appr C
0.4
0.2
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
-1 - - - - - - - - -
Analysis:
10
8
Appr A
Appr B
6
Appr C
0
0 2 4 6 8 10 12
Analysis:
Comparison XY Plot
12
Appr B
10
0
0 2 4 6 8 10 12
Appr A
Comparison XY Plot
12
Appr C
10
0
0 2 4 6 8 10 12
Appr A
Comparison XY Plot
12
Appr C
10
0
0 2 4 6 8 10 12
Appr B
Analysis:
X BAR & R
VARIABLES CONTROL CHART
(Format for example only; Supplier created templates may be used)
VARIABLES CONTROL CHART ( x & R ) PART NO. CHART NO.
MEASUREMENT EVALUATION PART NUMBER
PART NAME (Product) OPERATION (Process) SPECIFICATION LIMITS
PART NAME
APPRAISER A APPRAISER B APPRAISER C MACHINE GAGE UNIT OF MEASURE ZERO EQUALS
12
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
12
10
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
X BAR & R
VARIABLES CONTROL CHART
(Format for example only; Supplier created templates may be used)
VARIABLES CONTROL CHART ( x & R ) PART NO. CHART NO.
MEASUREMENT EVALUATION PART NUMBER
PART NAME (Product) OPERATION (Process) SPECIFICATION LIMITS
PART NAME
APPRAISER A APPRAISER B APPRAISER C MACHINE GAGE UNIT OF MEASURE ZERO EQUALS
PART
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10
NUMBER
R 1
E
2
A
D
3
I
N
4
G
S 5
SUM
SUM
x
NUM
HIGH-
R
LOW
X BAR & R
VARIABLES CONTROL CHART
(Format for example only; Supplier created templates may be used)
VARIABLES CONTROL CHART ( x & R ) PART NO. CHART NO.
MEASUREMENT EVALUATION PART NUMBER
PART NAME (Product) OPERATION (Process) SPECIFICATION LIMITS
PART NAME
APPRAISER A APPRAISER B APPRAISER C MACHINE GAGE UNIT OF MEASURE ZERO EQUALS
sm = SQRT ( se + sA )
Thus the number of distinct categories that can be reliably distinguished by these measurements is:
ndc = 1.41 x sp / sm =
This is the number of non-overlapping 97% confidence intervals that will span the range of product variation. (A 97% confidence
interval centered on a single measurement would contain the actual product value that is represented by that measurement 97%
of the time.)
12
10
0
1 2 3 4 5 6 7 8 9 10
RANGES (R CHART)
r= UCL = LCL =
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
1 2 3 4 5 6 7 8 9 10
READING 1 2 3 4 5 6 7 8 9 10
VALUE
HIGH-
R n/a 0 0 0 0 0 0 0 0 0
LOW
GAGE R ANALYSIS
Data in control? % Repeatability =
This method CANNOT be used for final gage acceptance without other complete and detailed MSA methods.