Professional Documents
Culture Documents
Alp-Sd-P1-Fs 021
Alp-Sd-P1-Fs 021
SE
PT
mm
IC
NORTH
9.97 m
TA
Ø400 mm
Ø400
NK
LIMIT
OF
WORK
80.33 m
De
SLOPE: 0.28% 1 2
DSS
1
3 4 5
p
26
MH 1.43 5 =2.0
th
6 7
8 GUEST
ENTRANCE
27
CE
AN
IL= =3.4 PTH
9 10
EY
AB
IN
11 12
EA
3.2
AR
28
CL DE
13
7
14
-7
15 16
MH
3.0 X 3.0
KIOSK
3.0 X 3.0
KIOSK 3.0 X 3.0
KIOSK
29 25 24
KIOSK 3.0 X 3.0
23 21
6m
30 20 17
31
35 34 33 32 22
19 18
2
- - - -
NOTES:
1. ALL WORKS SHALL BE IN ACCORDANCE WITH THE LATEST
EWA AND RELEVANT LOCAL AUTHORITY REQUIREMENTS.
2. THE ACTUAL FOUL SEWER NETWORK INSTALLATIONS
SHALL BE COORDINATED WITH THE EXISTING UTILITIES AT
SITE.
ISSUE/REVISION
FOR APPROVAL
MARASSI AL BAHRAIN
EAGLE HILLS
DIYAR AL MUHARRAQ
JOINT VENTURE
P.O.BOX 53,
ABU DHABI,
UNITED ARAB EMIRATES
+971 2 613 4000 tel +971 2 613 4001 fax
www.aecom.com
lmoa edLandscapes&Pools
P.O.Box 32571, Kingdom of Bahrain, Tel. 17 400407,Fax 17 402639
TR
RA VS
0 5 10 15 20