MAY - JUNI 2020 JUMLAH
NO NAMA POSITION 15-May 16-May 17-May 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 10-Jun TOTAL
JUM SAB MIN RAB KAM JUM SABTU MIN SEN SEL RAB JUM HK UPAH HK
Firmanto Hadi.S
Project Manager
HARIAN PEKERJA ( lampiran )
Periode : 10 ( 17 April - 1 Mei 2020 )
APRIL JUMLAH
NO NAMA POSITION 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr 24-Apr 25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 1-May TOTAL
JUM SAB MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB JUM HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA ( lampiran )
Periode : 8 ( 20 Mar - 2 April )
MARET JUMLAH
NO NAMA POSITION 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr 17-Apr 18-Apr TOTAL
JUM SAB MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM JUM SABTU HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA ( lampiran )
Periode : 9 ( 3 - 18 April )
APRIL JUMLAH
NO NAMA POSITION 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr TOTAL
JUM SAB MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA ( lampiran )
Periode : 8 ( 20 Mar - 2 April )
MARET JUMLAH
NO NAMA POSITION 20-Mar 21-Mar 22-Mar 23-Mar 24-Mar 25-Mar 26-Mar 27-Mar 28-Mar 29-Mar 30-Mar 31-Mar 1-Apr 2-Apr TOTAL
JUM SAB MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA ( lampiran )
Periode :
MARET JUMLAH
NO NAMA POSITION 6-Mar 7-Mar 8-Mar 9-Mar 10-Mar 11-Mar 12-Mar 13-Mar 14-Mar 15-Mar 16-Mar 17-Mar 18-Mar 19-Mar TOTAL
JUM SAB MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA
Periode :
Desember JUMLAH
NO NAMA POSITION 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb 29-Feb 1-Mar 2-Mar 3-Mar 4-Mar 5-Mar TOTAL
MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM JUM SABTU HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA
Periode : Bongkar dan pasang partisi baja lt 4
Desember JUMLAH
NO NAMA POSITION 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb TOTAL
MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM JUM SABTU HK UPAH HK
Firmanto
Project Manager
HARIAN PEKERJA
Periode : Pekerjaan perkuatan buffertank Lantai GF Jk3
Desember JUMLAH
NO NAMA POSITION 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec TOTAL
MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM JUM SABTU HK UPAH HK
5
6 -
7 -
TOTAL 7,980,000
Firmanto
Project Manager
HARIAN PEKERJA
PERIODE :
SEPTEMBER JUMLAH
NO NAMA POSITION 3-Nov 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov 15-Nov 16-Nov TOTAL
SEN SEL JUM SABTU MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL HK UPAH HK
Firmanto
Project Manager
Keterangan : 1. Bongkar dan pasang kembali 5 unit pengaman badan tangga tanki solar
2. Pasang plastik + triplek untuk pengaman louvre
HARIAN PEKERJA
PERIODE :
SEPTEMBER JUMLAH
NO NAMA POSITION 7-Oct 8-Oct 9-Oct 10-Oct 11-Oct 12-Oct 13-Oct 14-Oct 15-Oct 16-Oct 17-Oct 18-Oct 19-Oct 20-Oct 21-Oct 22-Oct TOTAL
SEN SEL RAB KAM JUM SABTU MIN SEN SEL RAB KAM JUM SABTU MIN SEN SEL HK UPAH HK
Firmanto
Project Manager
Firmanto
Project Manager
Keterangan : tgl 25 - 30 Sept perbaikan partisi (gypsum + caging wiremesh) yang goyang
material yang digunakan untuk pekerjaan ini siku 40 sebanyak 30 btg
tgl 6 Oktober Perbaikan pagar hollow DCI yang rubuh karna angin
OPNAM ADD PEKERJAAN BAJA
MANDOR IRFAN
PROJECT : DATA CENTER JK3
LOCATION: MM2100 INDUSTRIAL TOWN - CIBITUNG
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 LOADING DOCK 0% - - 0% -
Pasang railing m1 15.85 200,000 3,170,000 - 100% 3,170,000 100% 3,170,000
cat railing m1 15.85 50,000 792,500 - 100% 792,500 100% 792,500
TOTAL 3,962,000 - 3,962,000 3,962,000
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
HB 200 x 200 m1 8.50 49.92 424.3 3,500 1,485,021 100% 1,485,021 - 100% 1,485,021
Plat 10 mm m2 4.69 81.01 380.1 3,500 1,330,438 100% 1,330,438 - 100% 1,330,438
pengecatan baja m2 195.27 10,000 1,952,710 100% 1,945,910 - 100% 1,945,910
buat jaring besi bawah partisi D10 - jarak 20 cm m2 49.39 150,000 7,407,750 100% 7,407,750 - 100% 7,407,750
9 Pek. Perkuatan baja untuk riser tray luar -
Pasang perkuatan tray baja HB 100 dan UNP 100 m1 240.00 200,000 48,000,000 100% 48,000,000 - 100% 48,000,000
bobok dinding luar utk pasang HB ttk 40.00 30,000 1,200,000 100% 1,200,000 - 100% 1,200,000
10 Pek. Pasang tangga di GWT m1 20.00 150,000 3,000,000 100% 3,000,000 - 100% 3,000,000
-
11 Pekerjaan bongkar material ( 3 x bongkar ) = 4 org hk 12.00 120,000 1,440,000 100% 1,440,000 - 100% 1,440,000
12 Pekerjaan perbaikan pagar m1 25.00 45,000 1,125,000 100% 1,125,000 - 100% 1,125,000
13 pasang tahanan alimax yang di lantai 4 dan lt mezanine hk 8.00 150,000 1,200,000 100% 1,200,000 - 100% 1,200,000
14 Harian pekerja baja periode 7 -22 okt ( rincian terlampir) ls 1.00 1,700,000 1,700,000 100% 1,700,000 - 100% 1,700,000
Harian pekerja baja periode 3 -16 Nov ( rincian terlampir) ls 1.00 1,975,000 1,975,000 100% 1,975,000 - 100% 1,975,000
15 Buat pagar zincalume t=2,4m m1 160.00 150,000 24,000,000 100% 24,000,000 - 100% 24,000,000
16 Buat pintu gerbang t=2,4 m m1 7.20 425,000 3,060,000 100% 3,060,000 - 100% 3,060,000
17 Bongkar pagar hollow t=2,4m (milik dci) m1 70.50 20,000 1,410,000 100% 1,410,000 - 100% 1,410,000
18 Pasang kembali pagar hollow t=2,4m (milik dci) m1 71.80 80,000 5,744,000 100% 5,744,000 - 100% 5,744,000
19 Pasang louvre besi uk 3.5 x 2.7 m bh 12.00 800,000 9,600,000 100% 9,600,000 - 100% 9,600,000
20 buat dudukan granit bh 10.00 400,000 4,000,000 100% 4,000,000 - 100% 4,000,000
21 pasang tripek + plastik untuk tutup louvre hk 5.00 150,000 750,000 100% 750,000 - 100% 750,000
22 Buat meja wastafel siku 50 x 50 unit 2.00 200,000 400,000 100% 400,000 - 100% 400,000
TANGGA KE ROOF 2 -
SIKU 50X50X5 m1 53.60 3.78 202.6 3,500 709,128 100% 709,128 - 100% 709,128
UNP 200 X 80 X 7.5 X 11 m1 12.00 25.33 304.0 3,500 1,064,000 100% 1,064,000 - 100% 1,064,000
Plat 12 mm m2 0.22 97.22 21.4 3,500 74,861 100% 74,861 - 100% 74,861
pengecatan m2 27.06 10,000 270,568 100% 270,568 - 100% 270,568
plat bunga m2 3.80 26.04 99.0 3,500 346,354 100% 346,354 - 100% 346,354
CANOPY DEPAN -
Pasang angkur di Canopy depan ttk 32.00 15,000 480,000 100% 480,000 - 100% 480,000
PIPA 8 inch, t =4,5 mm m1 57.20 26.40 1,510 4,500 6,795,360 100% 6,795,360 - 100% 6,795,360
PIPA 4 inch, t= 3,6 mm m1 220.00 9.88 2,174 4,500 9,781,200 100% 9,781,200 - 100% 9,781,200
Plat 12 mm m2 1.54 97.22 149.3 4,500 672,000 100% 672,000 - 100% 672,000
Plat 6 mm m2 0.29 48.61 14.1 4,500 63,361 100% 63,361 - 100% 63,361
Cat pipa m2 215.19 10,000 2,151,889 100% 2,151,889 - 100% 2,151,889
Gali utk pasang kolom pipa titik 8.00 60,000 480,000 100% 480,000 - 100% 480,000
pasang spider fitting titik 48.00 75,000 3,600,000 100% 3,600,000 - 100% 3,600,000
RAILING TANGGA BELAKANG -
Pasang railing m1 110.20 200,000 22,040,000 100% 22,040,000 - 100% 22,040,000
cat railing tangga + cat ulang m1 110.20 75,000 8,265,000 53% 4,408,000 47% 3,857,000 100% 8,265,000
RAILING TANGGA DEPAN -
Pasang railing m1 170.79 200,000 34,158,000 100% 34,158,000 - 100% 34,158,000
cat railing tangga + cat ulang m1 170.79 75,000 12,809,250 100% 12,809,250 - 100% 12,809,250
RAILING ROOF 2 -
Pasang railing dan railing tangga m1 68.50 200,000 13,700,000 100% 13,700,000 - 100% 13,700,000
OPNAM PEKERJAAN BAJA
MANDOR HERI SUHERMAN
PROJECT : DATA CENTER JK3
LOCATION: MM2100 INDUSTRIAL TOWN - CIBITUNG
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
cat railing tangga m1 68.50 50,000 3,425,000 95% 3,253,750 5% 171,250 100% 3,425,000
Buat bekisting jalan rangka siku m1 102.00 75,000 7,650,000 100% 7,650,000 - 100% 7,650,000
Upah turunkan material baja dari truk periode agust-Des hk 14.00 150,000 2,100,000 100% 2,100,000 - 100% 2,100,000
Upah perkuatan buffertank ( Harian terlampir ) ls 1.00 7,980,000 7,980,000 100% 7,980,000 - 100% 7,980,000
bongkar pasang skafolding 5 x dikarenakan exca lewat m2 60.00 8,500 510,000 100% 510,000 - 100% 510,000
Upah harian pek perbaikan pintu lt 4 (2 tukang 1 ass tukang ) ls 1.00 430,000 430,000 100% 430,000 - 100% 430,000
harian periode 5 ( 22 jan - 4 feb ) bongkar psg partisi lt 4 ls 1.00 2,800,000 2,800,000 100% 2,800,000 - 100% 2,800,000
harian periode 6 ( 22 - 29 feb) rombak spider fitting ls 1.00 11,970,000 11,970,000 100% 11,970,000 - 100% 11,970,000
harian periode 7 ( 6 - 17 Maret ) ls 1.00 4,672,000 4,672,000 100% 4,672,000 - 100% 4,672,000
harian periode 8 (20 Mar- 7 apr ) lgsir mtrial baja ke jk5 ls 1.00 4,134,000 4,134,000 100% 4,134,000 - 100% 4,134,000
harian periode 9 (20 Mar- 7 apr ) bongkar ls 1.00 670,000 670,000 100% 670,000 - 100% 670,000
harian periode 10 (30 Apr - 7 apr ) lgsir mtrial baja ke jk5 ls 1.00 3,370,000 3,370,000 100% 3,370,000 100% 3,370,000
bongkar material pipa ( 3 kali kedatangan ) hk 6.00 120,000 720,000 100% 720,000 - 100% 720,000
Buat tutup sump it lt basement unit 3.00 800,000 2,400,000 100% 2,400,000 - 100% 2,400,000
Buat tutup shaft depan lift passengger unit 1.00 800,000 800,000 100% 800,000 - 100% 800,000
Buat canopy didepan lobang tray electrical roof unit 2.00 350,000 700,000 100% 700,000 - 100% 700,000
RUANG AHU lt 4 -
Pasang railing m1 16.30 200,000 3,260,000 100% 3,260,000 - 100% 3,260,000
cat railing m1 16.30 50,000 815,000 100% 815,000 - 100% 815,000
Buat tangga baja unit 6.00 850,000 5,100,000 100% 5,100,000 - 100% 5,100,000
Psg plat baja rangka UNP utk ddg raised floor m1 22.08 150,000 3,312,000 100% 3,312,000 - 100% 3,312,000
RUANG AHU lt 1 -
Pasang railing m1 14.00 200,000 2,800,000 100% 2,800,000 - 100% 2,800,000
cat railing m1 14.00 50,000 700,000 100% 700,000 - 100% 700,000
Buat tangga baja unit 6.00 850,000 5,100,000 100% 5,100,000 - 100% 5,100,000
Psg plat baja rangka UNP utk ddg raised floor m1 22.08 150,000 3,312,000 100% 3,312,000 - 100% 3,312,000
RUANG AHU lt 2 0% - - 0% -
Pasang railing m1 14.00 200,000 2,800,000 100% 2,800,000 - 100% 2,800,000
cat railing m1 14.00 50,000 700,000 100% 700,000 - 100% 700,000
Buat tangga baja unit 6.00 850,000 5,100,000 100% 5,100,000 - 100% 5,100,000
Psg plat baja rangka UNP utk ddg raised floor m1 22.08 150,000 3,312,000 100% 3,312,000 - 100% 3,312,000
TOTAL #VALUE! #VALUE! #VALUE! #VALUE!
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Ahmad Rp 2,500,000
2 Adi Rp 2,500,000
3 Sugeng Rp 2,500,000
4 Refi Rp 2,500,000
5 Bimo Rp 1,500,000
6 Harjo Rp 1,438,000
7 Surwono Rp 1,250,000
8 Kurdi Rp 1,250,000
9 Agus Rp 1,250,000
10 Agung Rp 1,250,000
11 Hartono Rp 1,250,000
12 Dedy Rp 1,250,000
13 Idrus Rp 1,250,000
14 Kosena Rp 1,250,000
15 Dedek Rp 1,250,000
16 Agung Rp 1,250,000
17 Budi Rp 1,250,000
18 Godrek Rp 1,250,000
19 Karjo Rp 1,250,000
20 Kanapi Rp 1,250,000
21 Ompong Rp 1,250,000
22 Tuying Rp 1,250,000
23 Edi Rp 1,250,000
24 Sudi Rp 1,250,000
25 Erik Rp 1,250,000
TOTAL 36,688,000
HIT VOL OPNAM
Plat 10 mm plat 8 mm
Posisi
diameter dalam
diameter luar
hitungan baja
material ket qty panjang Jumlah
m1
UNP 100 pintu (double) 40 7.59 303.6
0
vertikal (tunggal) 7 6.59 46.13
horizontal 2 80.2 160.4
maintrap 16 7.59 121.44
4 2 8 m2/m1
639.57
siku 40x40x4 bawah 2 72.2 144.4
0.2711
pintu 4 16 64
tunggal 8 10 80
H beam 8 6 48
Maintrap 8 16 128
Louvre 15 12 180
tray 0
500
500
Pipa besi
0.2032
0.2032 0.1016
0.2932 0.1466
275.304681
Pipa besi
0.1016
0.1016 0.0508
0.1736 0.0868
122.1012864
PENGECATAN
btg
unp 100
Partisi D
pengecatan lt 4 m2 total
HB 100 8.5 0.4 3.4
UNP 100 639.57 0.3 191.871
Siku 40 0.16 0
195.271 10000 1,952,710
pengecatan lt 1 m2 total
HB 100 11.05 0.4 4.42
UNP 100 398.86 0.3 119.658
Siku 40 0.16 0
124.078 10000 1,240,780
siku
SIKU 50X50X5
UNP 200 X 80 X 7.5
Plat 12 mm
plat bunga
kebutuhan stok total DIORDER kg
TOTAL UNP 100 351.125 93 258.125 266 14,949
SIKU 40x40 96.26666667 96.2666667 85 1,226
Plat 12 1 1 1,050
Plat 6 mm 1 1 525
Plat 8 mm 4.75347222 5 3,500
Plat 1.2 mm 17.05 5.92013889 6 21,250
Dinabolt 856 144 712 700
403,748,100
ket qty panjang Jumlah kg
m1 btg
pintu 40 7.59 303.6 50.6 2843.72
5 1.8 9 1.5 84.3
tengah 7 6.59 46.13 7.68833333 432.084333333
horizontal 2 80.2 160.4 26.7333333 1502.41333333
maintrap 14 7.59 106.26 17.71 995.302
3.8 1 3.8 0.63333333 35.5933333333
104.865 5893.413
bawah 2 72.2 144.4 24.0666667 442.826666667
12229.6526667 238,478,227
41,170,500
Partisi D
OPNAM PEKERJAAN RALING TANGGA
MANDOR ARYO
PROJECT : EDGE KUNINGAN
LOCATION : KUNINGAN JAKARTA SELATAN
HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL JUMLAH
SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Tangga Depan (+ Cat Acc Dll) m1 114.87 Rp 200,000 22,973,000 0% - 100% Rp 22,973,000 100% Rp 22,973,000
HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL JUMLAH
SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Tangga Depan (+ Cat Acc Dll) m1 114.87 Rp 200,000 22,973,000 100% 22,973,000 0% Rp - 100% Rp 22,973,000
2 Tangga Belakang (+ Cat Acc Dll) m1 102.71 Rp 200,000 20,542,200 0% - 100% Rp 20,542,200 100% Rp 20,542,200
HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL JUMLAH
SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
2 Pembayaran II
Proses Pengerjaan penanaman Rumput Golf dan pohon Rp 25,000,000 Rp 25,000,000 100% 25,000,000 0% Rp - 100% Rp 25,000,000
pelindung dan tanaman perdu
HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL JUMLAH
SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Pekerjaan Andesit -
1 Jasa Pemasangan Andesit m2 190.00 Rp 87,000 Rp 16,530,000 0% - 100% Rp 5,550,000 100% Rp 5,550,000
2 Jasa Coating Gloss 3 Lapis m2 190.00 Rp 55,000 Rp 10,450,000 0% - 100% Rp 10,450,000 100% Rp 10,450,000
HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL JUMLAH
SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Pekerjaan Andesit -
HARGA JUMLAH (total OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL
SATUAN kontrak - DP)
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Material Andesit -
HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL JUMLAH
SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
1 Material Andesit -
Item Vol Harga Awal Menjadi Bobot Menjadi Persentase yang sudah diambil Bobot yang sudah di ambil Menjadi
Pekerjaan Pemasangan Acp DH 1(Lt 3) Minggu 1-3 bobot yang belum di ambil
1. Pasang rangka hollow #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2. Pasnag rockwool 801.535 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
3. Pasang gypsum 801.535 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4. Pasang ACP dalam #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
1. Pasang rangka hollow #REF! Rp 15,000 Rp 15,000 #REF! #REF! #REF! #REF! #REF! #REF!
2. Pasnag rockwool 682.0520 Rp 12,000 Rp 15,000 Rp 8,184,624 Rp 10,230,780 #REF! #REF! #REF! #REF!
3. Pasang gypsum 682.0520 Rp 17,000 Rp 22,000 Rp 11,594,883 Rp 15,005,143 #REF! #REF! #REF! #REF!
4. Pasang ACP dalam #REF! Rp 80,000 Rp 100,000 #REF! #REF! #REF! #REF! #REF! #REF!
Total #REF!
1 As b7-1 37.1 Tinggi Gypsum dan Rockwall
0.65 Tinggi ACP
1.05
0.65
1.05
40.5
Rangka Hollow
acp
2 as f 35.2
0.653
1.05
36.903
3 as 7 17.1 Gypusm
1.25 acp
7.2
0.4
0.632
26.582
4 as 1 20.304 gypsum
0.65 acp
1.057
0.65
0.65
23.311
5.358 Ruang MMB
4.608
4.2
1.85
0.646
0.8
0.65
216.999 0.4
186.624 1
0.65
3.525
197.7263 13.721
170.049
Ruang MMA
2.85
0.65
0.65
2
3.5
142.4264 1.5
122.4899 11.15
124.9003
107.4171
Gypusm 73.517
acp 63.226
Gypusm 59.742
acp 51.379
NO KODE DIMENSI
1 SC1 HWF 200 X 200 X 8 X 12
2 SG1 WF 350 X 175 X 7 X 11
3 SG2 WF 200 X 100 X 5,5 X 8
4 SB1 WF 150 X 75 X 5 X 7
5 SB2 WF 200 X 100 X 5,5 X 8
Panjang
SC1 HWF 200 X 200 X 8 X 12 3.9
Total
6 23.4 Plat 16 total Plat 12
23.4
1 5.85 0.105 2 0.21 0.022
1 4.6 0.032 5 0.16
1 5.242 0.105 3 0.315
15.692 0.119 3 0.357
1 2.95 0.0625 6 0.375
1 2.725 1.417
1 1.45
1 2.4
6.575 Stiff Plat
2 3.55
2 3.698
4 11.136 6 Jumlah Total
2 4.916 0.0126 8 2 0.2016
1 2.45 0.00669 4 2 0.05352
18.502 0.0126 8 3 0.3024
3 8.925 0.00669 2 6 0.08028
8.925 0.00669 2 1 0.01338
0.00669 2 1 0.01338
3 4.65 0.01656 2 6 0.19872
9 15.462 0.002817 6 3 0.050706
4 11.9 0.913986
32.012
total Plat 9 total Plat 6 total
0.132 0.096
1.95
2.1
0.5
0.25
2.1
9.1
2
PERSON PENGAMBILAN MATERIAL
Mandor : AA Suherman Per tanggal : 13 April 2018
No Nama Material Sat Qty Harga Jumlah
TOTAL 2,830,000
OPNAM PEKERJAAN BAJA
MANDOR HERI SUHERMAN
PROJECT : DATA CENTER
LOCATION : MM2100 INDUSTRIAL TOWN - CIBITUNG
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
JEMBATAN CABLE TRAY
1 WF 400x200x8x13 m1 96.00 66.00 6,336.0 3,000 19,008,000 100 19,008,000 - 100 19,008,000
2 WF 200x100x5,5x8 m1 60.00 21.30 1,278.0 3,000 3,834,000 100 3,834,000 - 100 3,834,000
3 PLAT 19 mm m2 5.76 153.92 886.6 3,000 2,659,800 100 2,659,800 - 100 2,659,800
4 PLAT 9 mm m2 5.76 72.92 420.0 3,000 1,260,000 100 1,260,000 - 100 1,260,000
5 PLAT 12 mm m2 5.76 97.22 560.0 3,000 1,680,000 100 1,680,000 - 100 1,680,000
6 PLAT 16 mm m2 2.88 129.51 373.0 3,000 1,119,000 100 1,119,000 - 100 1,119,000
7 PASANG ANGKUR titik 72.00 - 15,000 1,080,000 100 1,080,000 - 100 1,080,000
TANGGA SERVICE COOLING TOWER - - - - -
1 UNP 200 m1 18.00 24.67 444.0 3,000 1,332,000 100 1,332,000 - 100 1,332,000
2 Siku 50x50x5 m1 84.00 3.77 316.7 3,000 950,040 100 950,040 - 100 950,040
3 PLAT BUNGA 4,5 mm lmbr 2.00 110.00 220.0 3,000 660,000 100 660,000 - 100 660,000
4 PLAT 12 mm m2 0.18 97.22 17.5 3,000 52,500 100 52,500 - 100 52,500
5 PLAT 6 mm m2 1.20 48.61 58.3 3,000 175,000 100 175,000 - 100 175,000
6 railing tangga service m1 14.00 150,000 2,100,000 100 2,100,000 - 100 2,100,000
7 cat railing tangga service m1 14.00 50,000 700,000 100 700,000 - 100 700,000
JEMBATAN ATAP JK1-JK2 - - - - -
1 WF 300x150x6.5x9 m1 96.00 36.7 3,520.0 3,000 10,560,000 100 10,560,000 - 100 10,560,000
2 WF 250x125x6x8 m1 159.00 29.58 4,703.8 3,000 14,111,250 100 14,111,250 - 100 14,111,250
3 WF 200x100x5.5x8 m1 84.00 21.33 1,792.0 3,000 5,376,000 100 5,376,000 - 100 5,376,000
4 WF 150x75x5x7 m1 119.00 14.00 1,666.0 3,000 4,998,000 100 4,998,000 - 100 4,998,000
5 SIKU 60x60x6 m1 342.00 5.42 1,853.6 3,000 5,560,920 100 5,560,920 - 100 5,560,920
6 SIKU 50x50x5 m1 132.00 3.75 495.0 3,000 1,485,000 100 1,485,000 - 100 1,485,000
7 PLAT BUNGA 4,5 mm lmbr 27.00 110.00 2,970.0 3,000 8,910,000 100 8,910,000 - 100 8,910,000
8 PLAT 6 mm m2 2.88 48.61 140.0 3,000 420,000 100 420,000 - 100 420,000
9 PLAT 9 mm m2 2.88 72.92 210.0 3,000 630,000 100 630,000 - 100 630,000
10 PLAT 12 mm m2 14.40 97.22 1,400.0 3,000 4,200,000 100 4,200,000 - 100 4,200,000
11 As baja 16 mm btg 4.00 9.47 37.9 3,000 113,686 100 113,686 - 100 113,686
Penambahan material untuk jembatan karena perubahan gambar + gawangan kolom
existing JK1 -
13 WF 300x150x6.5x9 m1 25.20 36.7 924.0 3,000 2,772,000 100 2,772,000 - 100 2,772,000
14 WF 200x100x5.5x8 m1 12.00 21.33 256.0 3,000 768,000 100 768,000 - 100 768,000
15 Plat 10 mm m2 5.76 81.01 466.6 3,000 1,399,800 100 1,399,800 - 100 1,399,800
16 Plat 12 mm m2 2.88 97.22 280.0 3,000 840,000 100 840,000 - 100 840,000
17 CNP 150x50x20x3,2 btg 13.00 40.56 527.3 3,000 1,581,840 100 1,581,840 - 100 1,581,840
18 Plat 16 mm m2 0.16 129.51 20.7 3,000 62,167 100 62,167 - 100 62,167
UPAH PENGECATAN JEMBATAN - - - - -
jembatan tinggi = 4,2 m m2 #REF! 10,000 #REF! 100 #REF! #REF! 100 #REF!
jembatan tinggi = 2,2 m m2 #REF! 10,000 #REF! 100 #REF! #REF! 100 #REF!
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
VOLUME HARGA OPNAM S/D MINGGU LALU OPNAM MINGGU INI OPNAM S/D MINGGU INI
NO URAIAN PEKERJAAN SAT VOL BERAT JUMLAH
(kg) SATUAN
BOBOT (%) JUMLAH BOBOT (%) JUMLAH BOBOT (%) JUMLAH
tutup plat baja di R.Fire GF Jk2 m2 2.88 250,000 718,750 100 718,750 - 100 718,750
tutup plat baja + rangka bak kontrol di koridor GF m2 6.47 250,000 1,617,000 - 100 1,617,000 100 1,617,000
Pintu water tank 1,2 x 2,8 m unit 2.00 1,250,000 2,500,000 100 2,500,000 - 100 2,500,000
Buat tangga dari Roof 1 ke Cooling tower - - - - -
WF 150x75x5x7 m1 7.20 29.58 213.0 3,000 639,000 100 639,000 - 100 639,000
SIKU 50x50x5 m1 18.40 3.75 69.0 3,000 207,000 100 207,000 - 100 207,000
PLAT BUNGA 4,5 mm m2 1.80 110.00 198.0 3,000 594,000 100 594,000 - 100 594,000
upah pengecatan tangga baja m2 #REF! 10,000 #REF! 100 #REF! #REF! 100 #REF!
buat railing tangga m1 7.20 150,000 1,080,000 100 1,080,000 - 100 1,080,000
upah pengecatan railing m1 7.20 50,000 360,000 100 360,000 - 100 360,000
-
Tangga temporary JK1 -
WF 150x75x5x7 m1 4.40 29.58 130.2 3,000 390,500 100 390,500 - 100 390,500
SIKU 50x50x5 m1 12.00 3.75 45.0 3,000 135,000 100 135,000 - 100 135,000
PLAT BUNGA 4,5 mm m1 1.20 110.00 132.0 3,000 396,000 100 396,000 - 100 396,000
Pengecatan tangga dan tutup GWT jk1 (2x pengecatan) m2 #REF! 10,000 #REF! 50 #REF! 50 #REF! 100 #REF!
railing tangga + cat m1 4.40 200,000 880,000 50 440,000 50 440,000 100 880,000
CAT CABEL TRAY UTK MOTORIZED VALVE -
pengecatan cable tray utk motorized valve 32btg x 3 mtr m1 96.00 12,500 1,200,000 50 600,000 50 600,000 100 1,200,000
pengecatan sambungan cable tray bh 32.00 12,500 400,000 50 200,000 50 200,000 100 400,000
Pemotongan siku kaki panel JK1 bh 18.00 10,000 180,000 50 90,000- 50 90,000- 100- 180,000-
-
Tangga hollow pipa chiller Jk1 + cat m1 16.00 200,000 3,200,000 50 1,600,000 50 1,600,000 100 3,200,000
bongkar pasang tutup bak valve + cat unit 1.00 250,000 250,000 50 125,000 50 125,000 100 250,000
tangga hollow tangki solar m1 15.00 200,000 3,000,000 50 1,500,000 50 1,500,000 100 3,000,000
tutup bak kontrol uk 1,2 x 0,83 m di R. MDF A unit 1.00 300,000 300,000 100 300,000 100 300,000
tutup bak kontrol uk 1,02 x 0,86 m di R. MDF B unit 1.00 300,000 300,000 100 300,000 100 300,000
- - -
bongkar pasang pagar lobby JK1 m1 11.00 110,000 1,210,000 100 1,210,000 100 1,210,000
buat atap/kanopi pompa atap baja di atap JK1 + cat - - -
Atap uk 3m x 4m x 2 unit m2 24.00 200,000 4,800,000 100 4,800,000 100 4,800,000
Atap uk 4m x 5m x 1 unit m2 20.00 200,000 4,000,000 100 4,000,000 100 4,000,000
- - -
bongkar pasang seng dinding jembatan JK1 atap m2 20.00 100,000 2,000,000 100 2,000,000 100 2,000,000
TOTAL #REF! #REF! #REF! #REF!
OPNAM S/D MINGGU INI #REF!
PERSON PENGAMBILAN MATERIAL - 287,500.0
MINGGU INI #REF! Cibitung, 30 Agustus 2018