KPC Maunong Daily Inventory Report As of March 25, 2021 INITIAL

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

KPC -Maunong Daily Report

Data of March 25, 2021 (Updated as of March 26/ 6 am)

I.C&C & FG Daily Inventory Traviz Suzuki


Total
Long Short Total Carry
C&C 39 2 41 24 65 OUTPUTS
FG (for customer pull 8 3 11 2 13 TRVIZ
out) CARRY
LWB SWB
WE- 4 0 4
II.Running Pulled Out (by customer) PA- 2 0 2
Variant Qty TRIM- 3 0 3
Long 26 KPC- 2 1 0
Traviz Short 3 PR- 2 0 1
Total 29 AC - 2 0 0
Suzuki Carry 44
Running Total 73 RUNNING OUTPUTS
TRVIZ
CARRY
LWB SWB
III. Manpower Set -Up (direct) March 26 attendance WE- 69 0 50
KPC Plan Actual Remarks PA- 34 0 37
Traviz 22 19 >> 1 Absent and 2 Resigned TRIM- 36 18 32
Suzuki 18 14 >> 2 Absent and 2 Resigned PAR- 2 1 0
Total 40 33

IEC Plan Actual Remarks


PA Line 19 14 >> 5 pax absent
PA Inspector 2 2
Traviz 12 9 >> 2 pax absent and Lacking on 1 pax
Trim
Line Suzuki 12 10 >>Lacking on 2 pax
Inspector 1 1
PA Repair 4 4
Total 50 40

IV. Welding Output


(Welding Output) Plan Actual Remarks
Traviz 5 4
Suzuki 3 4
Total 8 8

V. Rear Body Inventory

Suzuki LWB SWB Total


PA Process Body 34 38 0 72 ---> Welding output(FG for Painting) - Final Inspection
for trim 8 6 2 16 ---> Painting output(FG for Body Drop) - STN 5
for ac installation 3 4 7 ---> Trim Output(FG for Repair/AC)
for pdi - kpc 0 2 0 2
for painting repair 11 7 9 27 >> Paint Repair output: 2Lwb & 1carry
(w/ trim)
Total 53 56 15 115