Download as txt, pdf, or txt
Download as txt, pdf, or txt
You are on page 1of 1

We need the same drawings that you stamped for Texas for Florida.

Below is the information I received. The job should be identical to the TX one but
they added another battery so the weight is a bit higher. I will send the contract
over shortly. We are looking to have this complete ASAP so if you can't get it done
is the 2 days stated please let me know.

-External battery 4.4lb

-Solar panel with top mount assembly 17.6lb

-Camera 4.6lb

Our goal as far as getting a FL registered PE to sign off on our assembly will be
two-fold.
The first thing we would like to see is foundation requirements for our pole in
Florida in order to meet permitting requirements surrounding shear and uplift (I
believe the previous documents I attached included an ASCE wind provisions map.
Assuming it is sufficient, per your consulting firm, then including would be
ideal). We would like to combine stamped calculations with a drawing similar to
what is attached (this will be updated but I would l hope it gets the idea across),
portraying the necessary foundation depth and diameter. Our current solar panel is
712 mm wide x 540 mm tall and is mounted at a 45 degree angle.

You might also like