Time Study Matress Encasement
Prod/day @
Basic Time (Min) Allowances SAM
100%
1 Cutting Manual 6 7 9
2 Cutting Helper 10 20 18
3 Insertin Helper 7 10 9
4 Zipper a SNLS 35 41 38
5 2 side s SNLS 13 17 15
6 Piece ChManual 30 32 33
Prod/d Prod/d
ASCT PCS
Basic TimeAllowancesSAM
(Min) ay @ ay @ WagesPiece Rate
100% 80%
7 1 0.12 15% 0.1 3415 2732 1500 0.55
16 12 0.27 15% 0.3 1565 1252 1500 1.20
9 1 0.14 15% 0.2 2890 2312 1500 0.65
38 1 0.63 23.5% 0.8 614 491 1500 3.06
15 2 0.25 23.5% 0.3 1555 1244 1500 1.21
32 3 0.53 15.0% 0.6 791 633 1500 2.37
2.3 9.0
Total Rate 9.0
With Contactor comission 10.4