Requirement of GC Manpower at Reach-1A of Phase-2
Requirement of GC Manpower at Reach-1A of Phase-2
Requirement of GC Manpower at Reach-1A of Phase-2
Package-1 Viaduct
Sl. No Designation Quantity
1 Chief Resident Engineer 1 No
2 Resident Engineer 1 No
3 Section Engineer/Viaduct 1 No
4 Section Engineer/Casting Yard 1 No
5 Section Engineer/Launching 1 No
6 Section Engineer/Safety 1 No
7 Section Engineer/QCE 1 No
8 Section Engineer/QS 1 No
9 Section Engineer/Survey 1 No
10 Site Insepctor/Viaduct 4 Nos.
11 Site Insepctor/Casting Yard 3 Nos.
12 Site Insepctor/Launching 4 Nos.
13 Site Insepctor/QCE 1 No
Package-2 Viaduct
Sl. No Designation Quantity
1 Resident Engineer 1 No
2 Section Engineer/Viaduct 1 No
3 Section Engineer/Casting Yard 1 No
4 Section Engineer/Launching 1 No
5 Section Engineer/Safety 1 No
6 Section Engineer/QCE 1 No
7 Section Engineer/QS 1 No
8 Section Engineer/Survey 1 No
9 Site Insepctor/Viaduct 4 Nos.
10 Site Insepctor/Casting Yard 3 Nos.
11 Site Insepctor/Launching 4 Nos.
12 Site Insepctor/QCE 1 No