Element Fabricating Schedule: Quality Form

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Quality Form: No.

: 1
Date: 29/ 06/ 2021
Element–Fabricating Schedule 1 of 10

Project Name: Repair of Tikrit – Al_Alam Bridge with Approaches


Relevant Drawings: 005
For Final measurement BRACING

Segment 2 , G1-G5 , BRACING 1 , 2

Relevant ADDENDUM NO.2


Contractor: Al-Fao General Engineering Company

Weight per weight per


No. of Length
units unit

kg Elem. mm mm Item Type Item Code NO.


LxWxtxw x
(No) )W( (L)
No
294.8 8 13.4 2750 UPN120 S2-BRACING1 1
319.7776 8 13.4 2983 UPN120 S2-BRACING2 2
614.5776 Total Weight =

The Contractor’s Authorized Signature:

K&A Remarks:  Approved.


 Make corrections noted.
 Rejected.

Checked by:

:Date

97