UJIAN AKHIR SEMESTER

Naila Zaafira (Final Exam)


1906354791
COURSE : PERANCANGAN PRODUKSI &
PENGENDALIAN PERSEDIAAN
DATE & TIME : WEDNESDAY, 30 JUNE 2021 at 09:00am
DURATION : 45 MINUTES
DUE : WEDNESDAY, 30 JUNE 2021 at 09:45am
FORMAT : OPEN BOOK (honesty counts)

1. A company manufactures and sells a seasonal product. Based on the sales forecast that
follows, calculate a level production plan, quarterly ending inventories, and average
quarterly inventories. Assume that the average quarterly inventory is the average of the
starting and ending inventory for the quarter. If inventory carrying costs are $3 per unit
per quarter, what is the annual cost of carrying this anticipation inventory? Opening
and ending inventories are zero.

2. A company normally ships to a customer by rail at a cost of $500 per load. The transit
time is 14 days. The goods can be shipped by truck for $700 per load and a transit time
of four days. If transit inventory cost is $35 per day, what does it cost to ship each way?

For a given commodity, the line-haul cost is $13 per mile. For a trip of 200 miles and a
shipment of 300 cwt., what is the cost per hundredweight? If the shipment is increased to 500
cwt., what is the saving in cost per hundredweight? Answer.

3. Whate are cost associated with having additional warehouses in a distrbution system?

4. A process costs $200 to set up. The run time is 5 minutes per piece and the run cost is $30 per
hour. Determine:

a. The fixed cost.


b. The variable cost.
c. The total cost and unit cost for a lot of 500.
d. The total cost and unit cost for a lot of 1000

5. Briefly describe the following:


• Process systems based on material flow
• Criteria for selecting a process
• Factors to be considered In process design.