1. SCOPE:
1.1 This schedule lays down the technical requirements - Noted and agreed …… Air spring failure Air springs have been
for the design, manufacture and supply of Air Spring Indication Cum Brake fitted in BG ICF, LHB,
Failure Indication Cum Brake Application (FIBA) Application (FIBA) Hybrid and double decker
Device for air spring fitted BG ICF, LHB, Hybrid and Device for Air Spring mainline coaches.
Double Decker mainline coaches having ICF and LHB fitted “BG ICF, Hybrid Hence no change is
type bogies on Indian Railways. Scope of supply and Double Decker required.
shall generally be as per clause 4 of this Schedule of mainline coaches having
Technical Requirements (STR). However, if the ICF type bogies”……
supplier feels that certain additional items are FTIL remark: LHB
necessary for improved working performance of the coaches don’t have
system, he may quote for the same. In any case, Suspension control
purchaser will be at liberty to buy all or part material equipment and hence
from the offer. this standard is not
applicable to this coach
and hence LHB type
bogies shall be removed
1.2 Flexible hoses, Isolating Cock, Isolating cock with Noted and agreed ……ABR-02 and firm’s Indicator of FIBA device
vent feature for the Air Spring Failure Indication Cum approved drawings by should be to RDSO STR
Brake Application (FIBA) Device should be supplied to RDSO, Indicator of no. RDSO/2011/CG-04
RDSO’s STR C-K407 (Latest Revision), ABR-02 and FIBA device should be (Latest Rev.) to be read
firm’s approved drawings by RDSO. Indicator of FIBA to RDSO STR no. as:
device should be to RDSO STR no. RDSO/2011/CG- RDSO/2011CG-04 Indicator of FIBA device
04 (Latest Rev.) The Air Spring Failure Indication (Latest Rev.)” wherever should be as per RDSO
Cum Brake Application (FIBA) Device should be applicable”……. STR no. RDSO/2011/CG-
compatible with the other items as described in the FTIL remark: The 04 (Latest Rev.)
above STRs. The purchaser will be at liberty to buy referred RDSO spec
any part or complete item as mentioned above and Air calls for only the
Spring Failure Indication Cum Brake Application selected items for this
(FIBA) Device to this STR from different source of requirement and hence
supply. the “wherever
applicable shall be
added
2. OPERATING CONDITIONS: Headline
2.1 The Air Spring Failure Indication Cum Brake Noted …… Air spring failure No change is required.
Application (FIBA) Device will be fitted in mainline Noted Indication Cum Brake
coaches fitted with LHB/ICF bogies having Air Application (FIBA)
suspension in secondary stage. Device will be fitted in
mainline coaches fitted
“with ICF bogies”……..
FTIL Remark:
LHB coaches don’t have
Suspension control
equipment and hence
this standard is not
applicable to this coach
2.2 The Pneumatic suspension system works under two Noted Noted ---
different modes, one in the inflated condition and the
other in deflated condition when there is no air
cushion and load is directly transferred from the car
body to the Emergency rubber spring (bumper).Under
deflated condition of the air spring, the maximum
permissible operating speed of the coach is restricted
on account of inferior riding behavior.
2.3 Compressed air supply to the air spring assemblies Noted. Noted ----
shall be maintained through a compressor provided in
the Locomotive though Feed Pipe. The Locomotive
compressor charges the Feed pipe at 6 Kg/cm² and
Brake Pipe at 5 Kg/cm². Provision of air-drying does
not exist in some of the compressed air supply
system. Pneumatic circuit of Air Spring Failure
Indication Cum Brake Application (FIBA) Device
system is connected to the Feed pipe. Internal air
pressure of air springs may vary from tare to full load.
2.4 Each coach shall be fitted with four air spring Noted. There will be one FIBA per Noted and Complied Clause may be
assemblies (two per bogie) and each Air Spring bogie. Each FIBA device will modified as under:
Failure Indication Cum Brake Application (FIBA) monitor both the air spring of “Each coach shall be
Device shall be controlled by an independent levelling bogie. fitted with four air
valve (4-point control system). Two air springs of the spring assemblies (two
same bogie shall be connected through a duplex per bogie). There will
check valve set to act at a pressure differential of 1.5 be one FIBA device per
+ 0.12 Kg/cm². bogie. Each FIBA
device (consisting 02
valves for sensing each
Air spring by the
respective valve) will
monitor both the air
springs of respective
bogie. Each Air Spring
shall be controlled by
an independent
levelling valve (4-point
control system). Two
air springs of the same
bogie shall be
connected through a
duplex check valve set
to act at a pressure
differential of 1.5 + 0.12
Kg/cm²”
2.5 To meet the requirement of a fool proof arrangement Noted. Each FIBA device is Noted Clause modified as
in the suspension design, FIBA device connected with connected to both the air springs of under:
each air spring has been fitted in air spring fitted a bogie. In the event of air spring To meet the
coaches. FIBA device will send a message to the failure, FIBA device actuate the requirement of a fool
crew of the train in the event of air spring failure application of brakes, which will proof arrangement in
(which will ultimately demand a reduction in the immediately reduce the speed of the suspension design,
operating speed). An emergency situation is possible the train and ultimately cause the FIBA device connected
due to the likely hood of spring damage, possibility of train to stop. Indicators of with each air spring
air supply failure or due to sudden rupture or bursting respective failed air spring will turn has been fitted in air
of bellows of air springs due to any reason. to red and whistling sound will blow spring fitted coaches.
to indicate the location. The train is FIBA device will send a
checked by the engine crew message to the crew of
the train in the event of
air spring failure (which
will ultimately demand
a reduction in the
operating speed) by
way of brake
application and
physical indication
(Hissing Sound and
projection of indicator
in affected coach).
Failure of Air Spring is
possible due to the
likely hood of spring
damage, possibility of
air supply failure or due
to sudden rupture or
bursting of bellows of
air springs due to any
reason.
2.6 The basic principle in this arrangement is to actuate Noted. Noted “whistling sound” is
the application of brakes in the event of air spring replaced with “hissing
failure, which will immediately reduce the speed of the sound”
train and ultimately cause the train to stop. Indicators
of respective failed air spring will turn to red and
whistling sound will blow to indicate the location. The
train is checked by the engine crew and after taking
necessary action, train is allowed to move in the event
of failure of the air spring at prescribed speed.
3. ENVIRONMENTAL CONDITIONS: Headline
3.1 Air Spring Failure Indication Cum Brake Application Noted. Noted Max. Temperature
(FIBA) Device shall be subjected to following
under sun: 60ºC.
environmental conditions.
modified as:
Max. Temperature under sun: 60ºC.
Max. Ambient
Ambient temperature: 0º to 45ºC in shade.
Temperature under
Average relative humidity: 70% to 90%, 100% on
sun: 60ºC.
several days.
Rainfall: Fairly heavy, maximum being 200mm in24
hours, typical to the coastal areas.
Atmosphere: Dusty with salt laden air for several
months of the
year.
3.2 Air Spring Failure Indication Cum Brake Application Noted. Noted and Complied -----------
(FIBA) Device system may also come in contact with
the following, during coach maintenance operation:
The scope of supply covers the following items: Noted. 3+2 may please be
One FIBA device per bogie or 02 FIBA device per replaced by one set.
coach will be required.
2 Indicator 2
5.3. vi The type test shall be witnessed by authorized Noted. Noted and agreed ----------------
representative of RDSO at the time of design approval
of the vendor at their own test facility.
Any additional tests if considered necessary shall also
be arranged by vendor free of cost. All necessary
arrangements for witnessing the type test of Air
Spring Failure Indication Cum Brake Application
(FIBA) Device at firm’s premises shall be done by the
vendor. RDSO reserves the right to witness the type
test again if changes in approved design/drawings are
carried out which are likely to alter design /
performance characteristics of the Air Spring Failure
Indication Cum Brake Application (FIBA) Device.
5.3. vii In case design of critical component is changed, fresh Noted. Noted and agreed ------------------
type test and service trial shall be required. However
service trials can be dispensed with by RDSO
considering the reasons for change and extent of
modification.
5.3. In case, source of any component of Air Spring Noted. Sourcing of component is Noted and agreed It is a safety device
viii Failure Indication Cum Brake Application (FIBA) prerogative of manufacturer. hence the source of
Device is changed or any additional new source is Changing the source doesn’t call component suppliers
introduced, fresh type tests shall be required. The for type testing. Ensuring the needs to be proven
vendor should provide the detailed information of the quality of components from a new one. Therefore this
source changed/ additional source introduced along vendor and compliance to clause is retained as
with the documentary evidences for the record of this guarantee/ warranty obligation is such.
office. Firm shall validate the source in all respects i.e. the responsibility of manufacturer.
material, manufacturing process, quality control and
inspection & testing etc. to conform to originally
approved design and process. Compliance to all
obligations including guarantee/warrantee (as per
para. 8/Section - A) shall remain the responsibility of
vendor.
6. TECHNICAL REQURIEMENTS: Headline
6.1 General technical requirement: Noted.
General technical requirement of FIBA device shall be ----------
as under:
1) Dimensional drawing of Air Spring Failure 1) Noted 2) Noted and agreed ---------------
Indication Cum Brake Application (FIBA) Device.
3) Weight of one Air Spring Failure Indication Cum 3) Noted 3) Noted and agreed ---------------
Brake Application (FIBA) Device and Indicator
respectively.
4) Whether proposed Air Spring Failure Indication Cum 4) Noted 4) Noted and agreed ---------------
Brake Application (FIBA) Device is being used by any
other rail-road system? If yes, details regarding
quantity, type of stock, max. operating speed, type
of service, average annual running kilometers, life
cycle obtained by the user rail-road and
maintenance cycle followed by them shall be
furnished.
5) Details of deviation from the STR. 5) Noted 5) Noted and agreed ---------------
6) Content of indigenous and imported items in 6) Noted 6) Noted and agreed ---------------
offered Air Spring Failure Indication Cum Brake
Application (FIBA) Device.
7) Expected life cycle in operating and environmental 7) Noted 7) Noted and agreed ---------------
conditions enumerated in clause 2 & 3.
8) A write-up giving broadly the maintenance 8) Noted 8) Noted and agreed ---------------
requirements on time/distance basis along with the
facilities that would be needed for proper
maintenance/upkeep of the offered Air Spring
Failure Indication Cum Brake Application (FIBA)
Device.
10) A detailed write-up giving the details of "Quality 10) Noted 10) Noted and agreed ---------------
Assurance System" being followed for manufacture
of the offered items; and
11) Details of manufacturing and testing facilities 11) Noted 11) Noted and agreed ---------------
available with the manufacturer.
7.2 The information as received above shall be used for Noted Noted and agreed ---------------
preliminary evaluation of the firm's capability in --------------
meeting with the requirements of this STR.
7.3 The firm shall be required to submit a Type Test Noted Noted and agreed ---------------
Report of a proposed design after the preliminary ---------------
evaluation carried out as per para 7.2 is found
satisfactory. Type Test Report shall be complying with
Annexure “A” of this STR.
7.4 The premises of the firm shall be visited by RDSO's Noted Noted and agreed ---------------
officials for on-the-spot assessment of the firm's
capability after the Type Test Report is accepted by
RDSO.
7.5 RDSO reserves complete right in granting approval or Noted Noted and agreed ---------------
otherwise to a firm.
8. GUARANTEE: Headline
8.1 Complete Air Spring Failure Indication Cum Brake Noted. This clause should be read Noted and agreed “emergency spring”
Application (FIBA) Device including emergency spring as “Complete Air Spring Failure may be deleted from
shall be guaranteed for satisfactory performance for a Indication cum Brake Application the clause.
minimum period of 60 months from the date of actual (FIBA) device including emergency
commission in bogies or 72 months from the date of spring shall be guaranteed for
supply. Satisfactory performance for this purpose satisfactory performance for a
means that complete Air Spring Failure Indication period of 60 months from the date
Cum Brake Application (FIBA) Device or any of its of actual commissioning in bogies
part shall neither show any kind of deterioration which or 72 months from the date of
is likely to render it unserviceable nor lose its supply whichever is earlier.
characteristics as stipulated in this STR, during the
guarantee period for reasons attributable to
manufacturing/design defects.
8.2 In the event of 'non-satisfactory performance' of any Noted. The clause should be read Noted and agreed No change is required
of the items as indicated above, supplier will have to as “ In the event of ‘non- as it is already
replace the same at his own expense without levying satisfactorily performance’ of any elaborated in preceding
any cost involved in transportation, handling and of the items as indicated above, clause
replacement of such items on the Purchaser. supplier will have to replace or
repair the same at his own
expense without levying any cost
involved in the transportation,
handling and replacement of such
items on the Purchaser”. Further
the manufacturer shall replace or
repair the FIBA device only when it
is established that the failure was
caused due to manufacturing,
material or design defect.
9. INSTALLATION, COMMISSIONING & Headline Noted and agreed -------
MAINTENANCE:
9.1 On placement of order, supplier whose equipment will Noted. Noted and agreed ---------
be purchased for the "First Time" for installation on
the coaches, shall have to depute his representative
at his own expense to associate with the purchaser in
installation and commissioning of the equipment on
the first five coaches. He shall also depute his
representative during maintenance schedules
undertaken on his equipment as per maintenance
booklet supplied by him.
9.2 With every order for supply of the Air Spring Failure Noted. Instead of Compact-Disc, Noted and agreed No change is required
Indication Cum Brake Application (FIBA) Device, the email of the maintenance manual as mailing facility is not
supplier shall have to supply maintenance instructions shall be sent to the concerned available in all depots
in the form of two booklets (hard copy) and one copy Railways.
on Compact Disc (MS-Office compatible).
9.3 Maintenance booklet supplied by the supplier shall Noted and agreed
cover the following aspects in detail: -----------
1) Specification of the Air Spring Failure Indication 1) Noted. 1) Noted. and agreed -----------
Cum Brake Application (FIBA) Device.
2) Working principle based on the actual construction. 2) Noted. 2) Noted and agreed. -----------
-----------
3) Constructional details giving sketches, drawings 3) Noted. 3) Noted. and agreed
and photographs etc. identifying various items and
their part numbers etc. for easy identification.
4) Procedure for dismantling using sequential steps 4) Noted. 4) Noted. and agreed -----------
with the help of sketches.
5) Procedure for assembly, using sequential steps 5) Noted. 5) Noted. and agreed -----------
with the help of sketches.
6) Jigs, tools, other materials and details of special 6) Noted. 6) Noted. and agreed -----------
set-ups etc., necessary for item 4 & 5 above.
7) Testing procedures and facilities required along 7) Noted. 7) Noted. and agreed -----------
with their details.
-----------
8) Details of prevention maintenance kit, required for 8) Noted. 8) Noted. and agreed
periodical preventive maintenance of Air Spring
Failure Indication Cum Brake Application (FIBA) Device
as recommended by the supplier.
-----------
8) Comprehensive details containing legible sectional 8) Noted 8) Noted and agreed
views of defects normally observed or may happen
on FIBA device with clear remarks whether the
defect is rejectable or non-rejectable.
9) List of other defects and their remedies. 9) Noted 9) Noted and agreed -----------
10) Periodicity for various maintenance activities on 10) Noted 10) Noted and agreed -----------
time and distance basis.
11) Do's and Don'ts for maintenance officials. 11) Noted
10. INSPECTION AND TESTING: Headline
10.1 General requirements: Deadline Noted and agreed
During initial approval of a firm by RDSO (Clause 7) -----------
and later on when approval has been granted, RDSO
for purpose of ensuring quality of purchased product
may carry out periodic quality audit, inspection and -----------
testing of the equipment at the premises of the
manufacturer. Purchase inspection shall be done at
the premises of the manufacturer by a representative
of the Research Designs and Standards Organization
or an agency authorized by RDSO. The supplier shall 1) Noted.
have to arrange for the following and associate with
the same:
2) Noted. -----------
1) Access to all records considered relevant for 1) Noted and agreed.
such activity by inspecting officials.
-----------
2) Questioning of relevant personnel engaged in 3) Noted. 2) Noted and agreed.
production, testing and quality checking activities
etc. or related issues.
3) Testing of few samples of items already 4) Noted. 3) Noted and agreed. -----------
produced by the firm to ascertain the technical
characteristics given in this STR.
5) Noted.
4) Any other check considered necessary by the 4) Noted and agreed. -----------
inspecting party.
5) The inspecting official shall carry out purchase 6) Noted. However RDSO should 5) Noted and agreed -----------
inspection as per inspection check list clarify the statement “Technical
attached at Annexure “B” of this STR. document and type testing etc.,
within the time schedule included
6) The supplier should have credentials of supply of in the purchase order”. 6) Noted and agreed. 6) “Technical
FIBA device and other items as laid down in documentation, and
clause 4 of this STR and will be fully responsible type testing etc.” may
for the delivery of accessories such as Isolating be deleted from the
Cock (OLP Type) 20mm bore, Isolating Cock 7) Noted. For item 3, 4 and 5, RDSO clause10.1.6.
20mm bore with vent hole, Hose Connection and check sheet exist, hence the same
Hardware etc. Technical documentation, and shall be used for purchase inspection
by RDSO/RITES. Item 6 i.e. Nut/Bolts
type testing etc., within the time schedule
& fasteners are standard items and the
included in the purchase order. same are not mentioned in the RDSO 7) Noted and agreed 7) No change is
vendor list. They will be supplied required as the
7) Item no.3, 4, 5 & 6 shall be supplied already against our works test certificate and inspection will be done
inspected by RDSO/RITES as per respective not against RDSO/RITES inspection as per stipulation in
STR. Inspection Certificate of the same shall be 8) Noted. STR
provided by the firm at the time of inspection of
FIBA device and Indicator.
9)-------------
14.2 Additional information if required may be obtained Noted. Noted and agreed
from the office of the Director General (Carriage),
RDSO, Manak Nagar, Lucknow – 226011.
REQUIREMENTS OF TYPE TEST REPORT Annexure – A
The type test report of Air Spring Failure Indication Noted. Noted and agreed
Cum Brake Application (FIBA) Device shall consist of
the following, clearly represented by graphs as well as
in tabulation forms, with detailed test procedures and
their results: -
1) MATERIAL TESTS Headline.
Material test report (supported by standard test Noted. Noted and agreed
specifications). Material test of FIBA device including
rubber part shall be carried out in ISO and NABL
approved lab for confirmation of properties of materials
as per approved QAP and drawings of the firm.
Testing shall be done as per ASTM/IS/EN/UIC
standard.
2) ENDURANCE TEST OF AIR SPRING FAILURE Headline. Noted and agreed
INDICATION CUM BRAKE
APPLICATION (FIBA) DEVICE:
a) The endurance test is conducted to assess a) Noted. Noted and agreed
suitability of the Air Spring Failure Indication Cum
Brake Application (FIBA) Device provided at secondary
stage suspension in coach bogie by simulating service b) Noted. Noted and agreed
condition.
b) FIBA device shall be tested for 1000 actuation cycle
for each valve. Actuation pressure of both side FIBA
valves shall be recorded continuously for first 100 Noted and agreed
cycles and afterward at every 10th cycles for each c) Noted.
Valve. Actuation pressure of FIBA valves shall be
within specified limit.
c) The test on Air Spring Failure Indication Cum Brake
Application (FIBA) Device shall be conducted only
when the results of functionality test are obtained and
found satisfactory.
3) Burst pressure test of FIBA device shall be done after Noted. There is no burst test for Instead of Burst “Burst pressure test”
endurance test, as per para 2 of Annexure- “A” of this FIBA device. Clause to be Pressure Test, it will may be replaced with
STR. suitable amended. be better to check “High Pressure test”
Pressure tightness
test at 10 Kg/cm2 as
per annexure B.
4) Any other test felt necessary by the manufacturer. Noted. Noted and agreed
5) The type test should be repeated at the time of renewal Noted. Noted and agreed
of registration after first time acceptance of a particular
design of Air Spring Failure Indication Cum Brake
Application (FIBA) Device.
6) Leak test of Air Spring Failure Indication Cum Brake Noted. Noted and agreed
Application (FIBA) Device as detailed at para 10.2.2 of
this STR.
7) Tolerance in different dimensions of Air Spring Failure Noted. IS:2102 (Part-I) pertains to Noted and agreed Clause 14.2. 7) may
Indication Cum Brake Application (FIBA) Device should tolerances on machined parts be modified as under:
be as per IS 2102 (Part -I) and mentioned in Type Test only and doesn’t cover the Tolerance in different
Report and drawing. tolerances on rubber parts, dimensions of Air
springs, casting and assembly Spring Failure
Indication Cum Brake
dimensions. Clause should be
Application (FIBA)
amended accordingly. Device for machined
parts should be as per
IS 2102 (Part -I).
However for other
components
manufactured by
different process
respective IS to be
followed duly
mentioned in Type Test
Report and respective
drawings.
ANNEXURE – B
CHECKLIST FOR INSPECTION OF AIR SPRING FAILURE INDICATION CUM BRAKE APPLICATION DEVICE
As per inspection and testing Clause no.10.0
M/s KBI’s Comments M/s SIl’s Comments M/s FTIL’s Comments
1. Dimensional Check (10% of the Lot Qty.) Noted. Kindly refer our comments to clause 10.3. Noted and agreed
S.
Particulars Unit Specified Observed Remarks Headline.
no.
As per
14 Weight of indicator Kg approved Noted.
drawing
2. Leak Test of Air Spring: As Noted. Clause should be read Noted and agreed Clause should be read as “Leak test of
per Clause 9.2.2 of section A. as “Leak test of FIBA” instead of FIBA device” instead of “Leak test of
Air Spring”.
“Leak test of Air Spring”.
Clause 9.2.2 may be read as 10.2.2
Results of FIBA
device sample
S. Test and testing obtained
Standard Noted.
No. procedure S. No. S. No.
Mfg dt Mfg dt
Initial Charging:
i) Ensure that all Noted. We are using
Isolating cocks and cut only isolating cocks
of angle cocks in supply on the Test Benches.
line should be in open There are no cut-off
condition. Other end cut angle cocks/end cut
--------- Cut of angle cock
1 of angle cocks and drain of angle cocks.
FP= 6 + 0.1 Kg/Cm2 may be deleted
cocks provided on test As per earlier test
BP= 5 + 0.1 Kg/Cm2
bench should be in proforma, tolerance
closed position. on FP/BP pressure is
ii) Charge the FP line at ±0.1 Kg/cm2.
6.0 Kg/Cm2 and BP line
at 5.0 Kg/Cm2.
Leak Test:
Check for any leakage in
FIBA device & pipe lines.
No leakage is permitted
2 in FIBA device and Leak test within limit. Noted.
through its joint. Total
leakage in system
should not be more than
0.2 Kg/Cm2 in 60 sec.
i) No leakage in FIBA device
“Pressure tightness
Valve i) Noted.
High Pressure test: test” replaced with
ii) FIBA device should not ii) Noted.
3 Charge FP and BP upto Noted and agreed “High pressure
operate. iii) Noted.
10.0 Kg/Cm2. test”
iii) No damage in FIBA device or
circuit.
Insensitivity test:
Drop the air pressure of
one air spring side by 0.5
i) Noted
Kg/Cm2 in 10 seconds i) No response and no exhaust
.
4 with the help of the of air from the exhaust port. Noted and agreed
ii) Noted
respective choke/drain ii) Indicators do not turn red.
.
cock. Repeat the
process for other side air
spring.
i)Pressure in respective gauge
A) Functional Test at 2.0 start falling & FIBA device i) Noted. As per
Kg/Cm2 (Tare Pressure) actuate when respective gauge our approved test
i. Charge the FP at 2.0 pressure becomes less than plan and earlier
Kg/Cm2 Pressure and BP 1+0.1 Kg/Cm2. test proforma,
at 5.0 Kg/Cm2. tolerance on
ii. Open the ½” drain cock to pressure setting
ii)BP pressure starts venting for FIBA device
drain the air pressure of gradually and settles at 3.4 is1 ±0.1 Kg/cm2.
one side air spring/40L Kg/Cm2 approx. ii) Noted.
auxiliary reservoir.
iii) Noted.
Repeat the process for iii)Both indicators should be red. Noted. Tolerance
other side air spring. should be 90±5 dB.
“whistling sound” is
Hissing sound of 90+ 5db should deleted
blow.
i) Noted.
i) BP pressure exhaust, through ii) Noted.
BP Isolation: (Brake
FIBA device exhaust port stops iii) Noted. The “whistling sound” is
release and
and BP pressure rises to 5 clause (iii) should be deleted and
suppression of whistle)
Kg/Cm2. modified as “Both replaced with
Close the Isolating cock
ii)Whistling/Hissing sound stops. indicators show red” hissing sound
provided before FIBA
iii) Both indicators show to meet the
device in BP line.
red/green. requirement stated in
clause 6.1.17.
BP Isolation: (Brake
i) Noted Whistle is replaced
release and i) BP pressure exhaust, through
. with hissing sound
suppression of whistle)
Modified as “Both
iii) Both indicators show
indicators should
red/green.
show red”
Noted. However
Suppression of feature is there but
Indicator: during testing of FIBA
device on test bench
.Both indicators of same bogie
there is no provision Indicators of other
should turn to green from red
for 2nd bogie. Hence bogie should
Close the both isolating “Indication of other remain show green.
cocks with vent feature Indicators of other bogie should
bogie should remain May be deleted
or pull the resetting keys remain show green.
show green” to be
provided on FIBA device. applicable only in
case of testing on
actual coach.
7 Charge BP prior to FP FIBA device should not actuate Noted. Noted and agreed
and observe the
actuation behaviour of
FIBA Device if actuated.
Clause Clause description M/s KBI’s Comments M/s SIl’s Comments M/s FTIL’s Comments
no.
Noted.
Clause description M/s KBI’s Comments M/s SIl’s Comments M/s FTIL’s Comments