Active Fast Cooling

for Steam Turbines


One of the strongest levers to reduce plant
downtime for maintenance is to shorten the
cooling time of the steam turbine. MAN
PrimeServ supports active fast cooling by
determining the optimum cooling para-
meters.

Features
– Engineering study for machine spe-
cific determination validation of
optimum cooling parameters based
on machine design, process and
ambient parameters
– Optional supply and installation of
required piping and valves
– Optional provision of supervisory
personnel for monitoring of cooling
process
– Optional additional monitoring by
laser-based 3D contour monitoring

Benefits
– Significantly shortened cooling time
for reduced overall plant downtime
and less production losses
– Specifically optimized cooling para-
meters for avoidance of possible ne-
gative effects on service life
– Use of existing machine instrumen-
tation for monitoring of cooling pro-
cess
– Repeated use

0000000426.indd 1 16.12.2019 10:25:32


Active Fast
Cooling
for Steam Turbines

Active fast cooling allows you to get your


steam turbine back in operation significantly
faster for increased economic efficiency.

In order to avoid possible health dama- most gentle heat transfer. Within a ma-
ges, steam turbines must have cooled chine specific engineering study, MAN
down sufficiently before maintenance PrimeServ determines the optimum pa-
work can be performed. Therefore, one rameters for shortest possible cooling
of the strongest levers to reduce plant time while avoiding possible negative
downtime for maintenance is to shorten effects on the turbine’s service life such
the cooling time of the steam turbine. as casing distortion, exceeding of radial
MAN PrimeServ supports active fast or axial clearances, or aging effects.
cooling by determining and validating
the optimum cooling parameters for The cooling process is monitored by
your steam turbine. Compared to con- using the existing machine instrumen-
ventional natural cooling, active fast tation. Therefore, the casing temperatu-
cooling allows you to get your steam res and temperature differences, the
turbine back in operation faster – resul- cooling air temperature at the inlet and
ting in increased overall economic effi- exhaust, the axial position of the bea-
ciency. ring house, and the rotor position are
continuously checked. In addition, su-
Active Fast Cooling pervision by a MAN PrimeServ field
With active fast cooling, after an initial service engineer and laser-based 3D
period of natural cooling required for contour monitoring could be provided
equalizing temperature differences wit- for supplemental monitoring optionally.
hin the steam turbine, either cooling air
or nitrogen is passed through the Comprehensive Modernization
steam turbine allowing for a greater MAN PrimeServ provides comprehen-
amount of heat to be removed from the sive modernization concepts to upgra-
internals and the steam turbine to cool de your equipment – no matter if you
down more quickly. The flow direction want to optimize reliability, operating
from the colder turbine exhaust section costs, environmental sustainability, or
to the hotter inlet section establishes anything else.
MAN Energy Solutions
Steinbrinkstr. 1
46145 Oberhausen, Germany
P + 49 208 692-01
F + 49 208 692-021
info@man-es.com
www.man-es.com
All data provided in this document is non-binding. This data serves informational purposes only and is not guaranteed in any way. Depending on the subsequent specific individual projects, the relevant
data may be subject to changes and will be assessed and determined individually for each project. This will depend on the particular characteristics of each individual project, especially specific site and
operational conditions. Copyright © MAN Energy Solutions.

0000000426.indd 2 16.12.2019 10:25:34

You might also like