Estimate For Construction Building Pubudu Preschool at Omaragolla
Estimate For Construction Building Pubudu Preschool at Omaragolla
OMARAGOLLA.
DIVISIONAL SECRETARIAT IN IBBAGAMUWA
Item
Description Unite Qty. Rate Amount
No
Prepared by Checked by
Recommend by Approved by
29.28
36.25
25.795
Project EESTIMATE FOR BALANCE WORK SRI DEWAMITHTHA PRESCHOOL AT UNIT
02,NELLIYA.
T D S DISCRIPTION T D S DISCRIPTION
Taking List 2.0 26.0 7 grill work
1 Plinth beam, Colomn 6.0 312.00
2 Tor stee/ 29.00 m2
3 Mild stee/ 2.0 3.00 8 door
4 Forme work 6.00 36.00
5 Brick work 3.35 m2
6 plaster (internal) 37.0 9 Floor Concrete 1.3.6
7 grill work 15.0
8 door 0.25 138.75
9 Floor Concrete 1.3.6 3.93 m3
10 floor rendering 37.0 10 floor rendering
11 window 15.0 555.0
51.59 m2
1 Plinth beam, Colomn
2 39.0 3.5 11 window
0.75 4.0 14.0
0.75 43.875 1.30 m2
3 15.0
0.75
0.75 25.31
8 9.0 3.11 m3
0.75
0.75 40.50
109.6875
2 Tor stee/
4 123.0 492
32 9.0 288
780
237.80 m 145.06 Kg
3 Mild stee/
246 2.25 553.50
144 2.3 324.00
877.50
267.53 m
58.86 Kg
4 Forme work
2.0 123.00
0.75 184.50
8.0 9.0
T D S DISCRIPTION T D S DISCRIPTION
0.75 54.0
238.50
22.17 m2
2 30.0 5 Brick work
3.0 180.0
3 15.0
10.0 450.0
630.00
58.56 m2
2 30.0 6 plaster (internal)
3.0 180.0
4 15.0
10.0 600.00 72.50 m2
780.0
Prepared by Checked by
DIVITIONAL SECRETARIAT -IBBAGAMUWA
Project Name - Repear Building Sri Gothami Preshcool
G.N. Divition - Unit 03, Nelliya
Quantity
Item Work QTY Corrected
No BOQ Done Paid Rate Amount Amount Remarks