Professional Documents
Culture Documents
Arkan Abd Musleh 19-2-2021
Arkan Abd Musleh 19-2-2021
CIVIL ENGINEER
work, sewage and potable
water system) worked at
oilfield for 5 years.
CONTACT
PHONE:
07811879166 B.SC IN ENGINEERING SCIENCE
Address: Iraq Baghdad. University of technology, college of engineering-building & constriction engineering,
Date of born: 22 July 1978. Baghdad, Iraq.
From 2001 - to - 2005.
•I worked as a project manager in charge of project work, Site documentation and site
construction,
•I worked as a main technical adviser on a construction site,
•checking plans, drawings and quantities for accuracy of calculations;
•ensuring that all materials used and work performed are as per specifications;
•liaising with any consultants, subcontractors, supervisors, planners, quantity surveyors
and the general workforce involved in the project;
•liaising with clients and their representatives (architects, engineers and surveyors),
including attending regular meetings to keep them informed of progress;
•day-to-day management of the site, including supervising and monitoring the site labor
force and the work;
•planning the work, project progress checking, and efficiently organizing the site facilities
in order to meet agreed deadlines;
•preparing reports as required;
•resolving any unexpected technical difficulties and other problems that may arise.
•I was in charge of My team, and My work team consists of (construction manager, QC
manager, Safety manager, Admin, four civil engineer, three survey engineer, three safety
engineer, 4 supervisor, 76 workers).
Works includes:-
•Construction work for (276) concrete pipe support foundation
•I worked as a QC manager.
•checking drawings, and specification;
•ensuring that all materials used and work performed are as per specifications;
•liaising with any consultants, subcontractors, supervisors, planners, and the general
workforce involved in the project;
•liaising with the local authority (where appropriate to the project) to ensure compliance
with local construction regulations and by-laws;
•liaising with clients and their representatives (architects, engineers and surveyors),
including attending regular meetings to keep them informed of progress.
•Daily checking for site work and prepare ITP for construction activity items arrangement
with construction manager.
•planning the work and efficiently organizing the site facilities in order to meet agreed
deadlines.
•overseeing quality control on site.
•preparing reports as required.
•resolving any unexpected technical difficulties and other problems that may arise.
Works includes:-
1-Concrete foundation for equipment.
2-Concrete foundation for pipe support.
Works includes:-
1-New Roads construction.
2-New Buildings construction.
SKILLS
LANGUAGES
1. English (Reading Very Good – Writing Good – Speaking Good)
2. Arabic (Native)
.dii!:JiiH--------------
To Whom It May Concern,Arkan Abd has requested a reference from me having worked for Modern
Construction Company (MCC) on the Majnoon Oil Field.
I am the Infrastructure Project Manager for Shell Iraq Petroleum Development at the
Majnoon oil field in Southern Iraq. I have worked with Arkan since he joined the MCC on the oil field in
March 2015. MCC completed their scope in January 2016.
Arkan works as a Project Manager for MCC. MCC carried out Civil, Earthworks, TWall installation, fencing
and minor concrete works on the project. Arkan has proved to be a competent hard working Project Man-
ager. He has good written and spoken English skills and is a good communicator, both with his team and
us as Client. He is very willing to learn and to put into practical use techniques suggested to him.
Should you wish to contact me for further information, please email me at mairtinmcdermott@eircom.net
which is my personnel email address. As I work in Iraq it is difficult to contact me by phone. My company
email address is M.mcdermott@shell.com; however, I do not have access to this on my nonrotational
days off.
regards,
'ER f Of P E T
Given on 7th of March 2009 to engineer Arium Abed t. usleh for exceptional work and dedication while
serving as a Site engineer and Quality Control Management In support of Operation Iraqi Freedom.
Engineer Arl(an worked in harsh weatht>r and hostile conditions while a iWilY$ trying to administrate as a
profeuional dvil engineer and quality control manager. and always showed a positive attitude and a
profe$Sional demeanor.
n m d s r 1 trips Into coot sted r••~ at profes.sion I risk to eosur II proJ c.t belo perf ct one
accordln the qu"llty c.ontrol s.yst m.
fforts contributed to the suc.ces$fUI c mpl tlon of Al-A aAR PO ICE C.ADEMV at Al-HAB~ IVA
m In It one of the but construction in Iraq q;ordln to u.s ov mm nt offidal.
~ • • \ / A/"1 - : ~J:.ll
'' f -:-"'Lll
This letter is in recognition of Arkan Abd Musleh. Mr. Arkan Abd Musleh position was the Site
Engineer ovet· the RCB #115 Diyala Project estimated project value $9 million US dollat·s. Ovet·seen
by the USACE.
When I personally became involved with this project, the project was 6-7 months along in
schedules, and behind schedule. The project was having some difficulties in the demand of meeting
the requirements and guidelines. Mr. Arkan Abd Musleh recognized this, and helped in improving
the required 2 week look ahead schedules and SOV statements required for monthly billings. He
helped set up a complete new table of contents to show where the project was needing impt"Ovement
and repot·ting Percentage complete for each pt"Ogress from each of the subcontractors. Due to his
personal commitment, he quickly identified the coHective actions that needed to be made with each
subcontractor and worked with them daily to improve on this needed schedule of values and
project schedules.
With his stt·ong leadership, he also mentored to 10 other Iraqi Engineers in developing the
necessary oversight required for the project. With the required documents needed for this project
which include but not limited to, All Submittals, complete review of Design issues and completely
identifying the requit·ed drawing that were needed in the field so compliance could be maintained,
covering K-span Design Issues with 2 Enlisted barracks, RRT combined Billeting , Officers
Billeting , NCO billeting , RCC Combined Billeting , RCC Operation center, Operation Center,
RRT offices, Maintenance Building , New DEFAC ,Mission Prep , Medical center, 9 overall site
Latrines, site roads , storm water , potable watet· , site Electrical grid , Mechanical issues, site
Guat·ds towet·s, and site fencing with Burma .
I would recommend Mr. Arkan Abd Musleh fot· further employment if needed for any other
company needing his background and leadership. Mr.Arkan Abd Musleh was a key Engineer in
helping move this project forward. A job well done.
Kind Regards.
DanielL. Chavez,
L. Chavez, o=Sa~
Chavez
AI-Sah ra Gr oup, o u=SSG,
;:~I=Dani ekhavezl@msn.corn.
Date: 2009.08.06 21:25:10 +03'00'
DanielL. Chavez
Mobile: (+964) 7902 800054 Email: info@ alsahra-iraq.com Website: www.alsahra-iraq .com
... ... UI.U
.:.L.tJ.lt . .WI. . .l,UDti
W·AI
Experience Certificate
To whom it my concern
This is to certify that Mr. Arkan Abd Musleh is one of the
company's employees ( Aldayer United Company) .He started
work with the company from 1-10-2011 and he is continues in the
work with our company until now. Mr. Arkan he is working as a
civil engineer in our company. He has a good experience in his
work .Also he doing his work with high Quality and completes the
work as should be done .
manager@:aldayerunitcd.com info'a.aldaverunitcd.comwi\'\V.aldaverunited.com
Mobile: +964 7703194231-+964 780 1413260