1.Topping work
-Basement, Gnd,1st,2nd,8th, Penthouse(owner) & around building and above penthouse(at water tank)
-3th floor-(Room-3)
-6th floor-(Room-1,2,5&6)
-7th floor-(Room-2,3,4,5&6)
-9th floor-(Room-3,4,5&6)
-10th floor-(Room-6)
Plumbing work
1.Basement
-From Basement to above penthouse (water tank) water supply pipe install at shaft.
Electrical work
1.Breaking wall,pipe & cup install and lighting string install
-3rd floor(Room3)
-5th floor(Room6)
-6th floor(Room4&6)
-7th floor(Room6)
-8th floor(Room6)
-9th floor(Room1,2&4)
-10th floor(Room2,3,4,5&6)
2.Wall breaking,pipe & cup install and lighting string install after topping concrete casting at bath & wc and
kithchen(all floor).
Painting work
Basement
Gnd floor
-Bath & wc and kitchen putty 2coats and painting work.(all floor)
Carpenter
Other work
-Roof work
Other work
-Shwe Nagar logo install at penthouse level
-Fence work