PERMIT FOR WORKING ON OR NEAR CRANE &

CRANE RAILS
(Issued subject to compliance of all the safety precautions given below overleaf.)
NAME OF THE INITIATOR ISSUING DEPT. DEPT. CODE
ISSUING THE PERMIT

DATE OF WORKING TIME OF WORK LOCATION OF WORK DATE OF ISSUING


THE WORK PERMIT

FROM TO

NAME OF CONTRACTOR NAME OF CONTRACTOR’S SUPERVISOR ON SITE NO.OF PERSONS

DETAILS OF WORK TO BE CARRIED OUT :

GENERAL DECLARATION BY CONTRACTOR’S SUPERVISOR WHO WILL BE AVAILABLE AT SITE

I hereby declare that the work detailed above will be carried out strictly as per safety precautions mentioned
below & overleaf.
I ensure that only those persons who are instructed by me about the safety precautions to be observed and who are
trained in such work will do the said work.
I will ensure that the permit is signed by the initiator, the shop foreman/supervisor, HED Maint Foreman and authorised by
Powai Safety Department (PSF) before starting the work. I will be available at site throughout the period of work.

k`onavar ikMvaa k`onacyaa $LajavaL kaoNatohI kama krtaMnaa yaa vak-primaTmaQyao ilaihlaolyaa
sava-p`karcyaa saurixattosaMbaMiQacyaa saUcanaaM (irmaaoT h^nDsaoT,$Lavar laavaavayaacaa
sTa^pr, laala rMgaacaa [MDIkoTr idvaa, saof\TI baolT [%yaaid) malaa marazI/ ihndI maQyao
samajaavaUna doNyaat AalaI Aaho. %yaa sava- saUcanaaMcao maI tMtaotMt palana
krIna.maaJyaa kamagaaraMnaa yaa kamaatIla Qaaoko va saurixatta ]payayaaojanaa yaaMcaI maaihtI
maI idlaI Aaho. jyaa kamagaaraMnaa ASaa kamaacao saof\TI T/oinaMga idlao gaolao Aaho toca
kamagaar ho kama krtIla yaacaI maI kaLjaI Gao[-na. kamaacao vaoLI saMpUNa-vaoL maI kamaacao
izkaNaI hjar raihna.

DATE : SIGNATURE OF CONTRACTOR’S SUPERVISOR

SAFETY PRECAUTIONS :
1. WARNING: Please note that the cranes are operated by the remote control.
2. Take the necessary advice from the shop floor supervisor before starting the work.
3. Ensure that the workers know the hazards in the job and safety precautions to be taken while at work.
4. Read the instruction given overleaf & follow them strictly.

PERMISSION FROM SHOP FLOOR FOREMAN & HED MAINT DEPT FOREMAN PERMIT RENEWAL

Ist Shift Ist Shift Ist Shift IInd Shift IInd shift IInd Shift

INITIATOR’S NAME

INITIATOR’S SIGNATURE

SHOP FOREMAN’S NAME

SHOP FOREMAN’S SIGNATURE

HED MAINT FOREMAN’S NAME

HED MAINT FOREMAN’S SIGNATURE

AUTHORISATION BY PSF

WORK PERMIT NO.

THE WORK IS COMPLETED AND THE WORK PERMIT IS CLOSED/CANCELLED FOR THE DAY AT _____a.m. / p.m. ON -- -- 200
Signature Signature Signature Signature

Name: Name: Name: Name:


(CONTRACTOR’S SUPERVISOR) (INITIATOR) ( HED MAINT ) ( SHOP FOREMAN )

PSF:QF:25 Pg 1 of 2 REV:00 DATE: 01-12-06


SAFETY INSTRUCTIONS FOR CARRYING OUT WORK ON OR NEAR
CRANE AND CRANE RAILS
BEFORE STARTING THE MAINTENANCE WORK OF THE CRANE :

1) IF THE WORK IS TO BE CARRIED OUT ON THE CRANE :

(a) Switch Off the power supply to crane by pressing the stop button on the remote handset and
remove the magnetic key.
(b) Handover the remote control handset to the concerned Plant Maintenance
Supervisor.
(c) Put the selector switch on the crane to manual operation mode and put on the
Red Flasher on then crane to indicate “Crane under Maintenance”
(d) Provide stoppers and red flashers on the crane rails so that the cranes on both
sides can not approach within 6 metres from the site of work.

2) BEFORE STARTING THE MAINTENANCE WORK OF THE OVERHEAD LIGHTING


FITTINGS / ESTATE MAINTENANCE ETC. USING CRANE :

(a) Follow above-mentioned instruction 1.(a).


(b) Send a shop floor person carrying the remote handset for the respective crane
alongwith crews to operate the crane.
(c) Inform the crane operators of the cranes adjacent to this crane before providing
stoppers.
(d) Provide stoppers on the crane rails so that the cranes on both sides cannot
approach within 6 metres from the site of the work.
NOTE* : Before providing stoppers on crane rails between E1-E2, E2-E3, & E5-
E6, remote handsets of the cranes in the vicinity in both the adjacent bays must
be taken into custody by plant maintenance supervisor.

3) BEFORE STARTING THE WORK ON OR NEAR THE CRANE RAILS :


(a) If the work is to be carried out near Down Shop Leads (DSL) Safety Card No. 3
(working near live electrical lines) is to be obtained with the regular work permit.
(b) Arrange to provide stoppers on the crane rails so that the cranes on both sides
cannot approach within 6 metres from the site of the work and also mount the
Red Flashers as mentioned above in 1(d).
Note: Follow instructions as given in NOTE* in 2(d) above for work in E-shops.

PLEASE NOTE:
1. Ensure that Radiography is not ‘ON’ in the concerned area by Checking the Red
lights on X - Ray enclosure and the columns
2. In no case the cranes will be operated through remote control or otherwise by any
person other than trained shop floor person.
3. Ensure that safe access/egress to the work site is provided during the entire period
of work especially in E - shops.
4. The persons who are going to work at any place on the crane from where there is a
chance of falling must use safety belts and anchor them properly during the period
of work.
5. Ensure the safety of the persons working below on the shop floor by barricading
the area or by any other effective means.
PSF:QF:25 Pg 2 of 2 REV:00 DATE: 01-12-06