HTG ENGINEERING PVT. LTD.

2*800 MW ADANI POWER JHARKHAND LTD


HIRA REGISTER
Name of the Job Site: 2*800 MW ADANI POWER JHARKHAND LTD. Date: 01/03/2021
HIRA No: APJL/HTG/ESEPPL/003 Assessment Team: Uttam Kumar Mishra(HSE Officer)
Grinding, Arc Welding, Scaffolding erection & dismantling (Duct Fabrication Raushan Singh ( Site Manager)
Name of the Main Activity
Yard), Work at Height. Deepak(Safety Supervisor)

Residual
Risk
Additional Control Risk After
considering
Measures to bring Risk to applying
existing Safe
R/ ALARP Level Additional
Existing Control control work
NR (A-Elimination, Control
Sl. Measures measures method
Sub Activity / Hazard Risk B-Substitution, Measures Action By

RatingProbability

RatingProbability
No (As per company (Give
E/ C-Engineering,

Impact Rating

Impact Rating
defined procedure) only the

Risk Level

Risk Level
L D-Signage /Warning/
Doc no)
Administrative,
E- PPEs usage )

Preferably Grinding
machine having its
body made of
nonconductive
Loose Contact material.
01
Cut in Power Electrocution & Fire Machine earthing
R Cables Power supply thorugh
Wires without ELCB/RCCB.30 mA
Power Supply Daily Checking of grinding
plug top. sensitivity. Execution
to grinding 1 2 L machine cable before start 1 2 L
Electrical cord of the P& M
Machine of the work.
plug grinding machine
will be provided with
plug.
Repair and making
joints in the cord will
be done top only by
the authorized
electrician.
Replacement R Breaking of 1 1 L
of grinding Injury to Person Ensure Grinding Storage of grinding wheel
wheel
wheel. wheels are stored individually covered in soft
properly 2 2 L Execution

Page 1 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
Ensure expire date P& M
,Speed of wheel Ring
test done
Visual observation

PPEs face shield


Locking of wheel by
suitable spanner

Inspection guard &


handle of machine.

Inspection of ON OFF material at a dry place.


switch of the machine
Replacement of wheel
Ensure the suitable under supervision of
machine as per the expert.
require activity & as
per the speed of
grinding wheel.

Authorized grinder is
permitted

Training of grinder

Periodic inspection of
grinding machine

Right tool for the job

Grinding Work Permit system to Ensure grinder 2 1 L


Work at be followed. is wearing cotton cloth
Height Ensure wheel is locked free from oil grease or
Breaking of paint.
Injury to person properly
R wheel
Fall of Fire Use of all job specific
Area is barricaded. Execution
person/material. PPE.
Burn injury 3 2 M
Uncovered Proper access &
Skin Damage
spatters. working platform with
Temporary Hearing
Page 2 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
noise loss suitable railing.
Removal of all
combustible material
Fire Extinguisher kept
stand by.
On the Job Training

Breaking of Injury to person Work Permit system to


wheel Fire be followed.
Uncovered Burn injury Ensure wheel is locked
R properly
spatters. Skin Damage Area is barricaded
noise Temporary Hearing Use of all job specific Ensure on/off switch is
loss PPE. working conditions
Grinding work 2 2 M
Removal of all Ensure grinder is wearing 2 1 L Execution
at ground
combustible material cotton cloth free from oil
Fire Extinguisher kept grease or paint.
stand by.
On the Job Training

Electric Welding machines are


Connection at kept inside welding booth
open place. / rain protection
arrangement.
Overloading
Electrocution All welding machines are Providing non conductive
Lack of routed with ELCB. mat.
Property Damage
Electric R earthing. Body Earthing done by 8 Periodic inspection of
Injury to Person
02 Connection Working guage GI wire. 3 2 M power cable, ELCB &
Fire 1 1 L Execution
for welding without specific Welders provided with earthing.
Machine PPE. leather hand gloves ,
Poor welding hood & other job On the Job Training
specific ppe. provided.
housekeeping
Overlapping of Power and
welding cable avoided.
Fire Extinguisher provided
at site.
Welding Work Visual inspection of
Electrocution Proper access to
welding equipments prior

Page 3 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
Falling of Injury to Person approach the
R Material 3 3 M
Fire workplace & working
Fall of Person platform with proper
Hot Metal Eye injury
guard rail.
Spatters Skin readiness
Fall protection
Waste Hot
arrangements
Electrode bits
UV rays Provision of PPE
(Safety Harness,
lifeline,& fall
arrestors.)
to work.
03 Combustible materials Do Five minutes
are removed from the housekeeping concept
area below welding prior to start the job.
activity.
Spatters are arrested
by providing fire
blankets or the area
below are barricaded
Fire extinguishers
provided
Proper ventilation

Scaffolding Fall of
erection R Injury to person Ensure proper lifting &
materials,
lowering management. Tools and tackle to be tied
Clamp, Property Damage with small rope
spanner, from Standard Bags should 1 1 L
2 2 L Execution
height, be used for lifting of Imparting On the Job
clamps & other training on site.
accessories.
R Fall of walkway Walkway planks stack 1 1 L
Injury to person Ensure proper lifting & properly.
planks
lowering management.
Property Damage

Page 4 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
2 2 L Execution
Standard Bags should
be used for lifting of
clamps & other
accessories
R Collapse of Injury to person Scaffold to be erected
scaffold
on compacted & 2 2 L Scaffolding Tag system to
1 1 L
levelled surface ,Base be adopted Execution
plate to be used.

Fall of Ensure proper lifting


R materials,
and lowering 2 2 L
Clamp, Injury to person,
management &
spanner, from Property Damage 1 1 L
standard bags should
height,
be used for material
Handling.

Safety net to be tied &


Sequence of barricading to be provided
Dismantling dismantling to be 2 2 L below dismantling work. Execution
03 of Scaffold R Collapse of Injury to person, followed 1 1 L
On the Job training will be
scaffold Property Damage provided.

R 2 2 L
Fall from Height Injury to person Full Body harness with 1 1 L
double lanyard to be
used.

Page 5 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
1.Full Body harness
provided .
2.Rope grab fall
arrestors made
available in all vertical
ladders.
3.Prior Scaffolding Tag
must be checked.
R Green :- Safe for use
Reg:- Not Safe for use
04 On the Job training
4. Trained and
Work at provided.
medically fit (i.e. All 2 2 L
Height Fall of Person, Execution
Injury to Person the height workforce 1 1 L
Fall of material Safety Net to be provided.
Property damage, should be gone
through Vertigo
Test)workforce to be
deployed.
5. All the height work
must be started with
having valid work
permit.
6. Standard Bag should
be used for lowering of
clamps.

I will affirm that the aforesaid precautions shall be communicated to all of the workmen and ensured the compliance during the execution of the job.

HIRA Contractor Engineer HIRA Contractor HSE

Sign
Sign

HIRA Reviewed By(HTG Site HIRA approved by(HTG & Adani if


Engineer) need)

Sign

Page 6 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER

Value Description
R : Routine NR: Non Routine E : Emergency L : Legal Requirement
Massive effect
1. Persistent severe environmental damage or severe nuisance
extending over a large area
5 2. Hi terms of commercial or recreational use or natural conservation
3. A major economic loss for the company
4. Constant and or highly exceeding statutory or prescribed limits
Major effect
X
1. Severe environmental damage.
4 2. The company is required to take extensive measures to restore
polluted or damaged environment to its original state. IMPACT / CONSEQUENCE
3. Exceeding statutory or prescribed limits.
Probability Description (The highest
Localised effect
category willloss
1. Limited beofused)
discharges to known toxicity 1 2 3 4 5
3 2. Repeated exceed of statutory or prescribed limit
3. Affecting
Value neighbourhood
Status Description
4. Spontaneous recovery of limited damage within one year P
Minor effect 1
R
1. Contamination damage sufficiently to attack the environment
2 52. SingleInevitable Happens regularly on this site
exceed of statutory or prescribed criterion
3. Single complaint. No permanent effect on environment
O
LOW RISK
B
Severity of Aspect (Impact) 2
1 Known to have occurred on A
4 Most likely this site in the past B
I 3 MEDIUM RISK
L
3 Likely Known to occur on other sites
I
T
4
2 Unlikely Known to occur in the
Industry Y
Page 7 of 7 HIGH
1
Most Minor Damage, No Delay 5 RISK
Unlikely