Professional Documents
Culture Documents
HTG Engineering Pvt. Ltd. 2 800 MW Adani Power Jharkhand LTD Hira Register
HTG Engineering Pvt. Ltd. 2 800 MW Adani Power Jharkhand LTD Hira Register
Residual
Risk
Additional Control Risk After
considering
Measures to bring Risk to applying
existing Safe
R/ ALARP Level Additional
Existing Control control work
NR (A-Elimination, Control
Sl. Measures measures method
Sub Activity / Hazard Risk B-Substitution, Measures Action By
RatingProbability
RatingProbability
No (As per company (Give
E/ C-Engineering,
Impact Rating
Impact Rating
defined procedure) only the
Risk Level
Risk Level
L D-Signage /Warning/
Doc no)
Administrative,
E- PPEs usage )
Preferably Grinding
machine having its
body made of
nonconductive
Loose Contact material.
01
Cut in Power Electrocution & Fire Machine earthing
R Cables Power supply thorugh
Wires without ELCB/RCCB.30 mA
Power Supply Daily Checking of grinding
plug top. sensitivity. Execution
to grinding 1 2 L machine cable before start 1 2 L
Electrical cord of the P& M
Machine of the work.
plug grinding machine
will be provided with
plug.
Repair and making
joints in the cord will
be done top only by
the authorized
electrician.
Replacement R Breaking of 1 1 L
of grinding Injury to Person Ensure Grinding Storage of grinding wheel
wheel
wheel. wheels are stored individually covered in soft
properly 2 2 L Execution
Page 1 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
Ensure expire date P& M
,Speed of wheel Ring
test done
Visual observation
Authorized grinder is
permitted
Training of grinder
Periodic inspection of
grinding machine
Page 3 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
Falling of Injury to Person approach the
R Material 3 3 M
Fire workplace & working
Fall of Person platform with proper
Hot Metal Eye injury
guard rail.
Spatters Skin readiness
Fall protection
Waste Hot
arrangements
Electrode bits
UV rays Provision of PPE
(Safety Harness,
lifeline,& fall
arrestors.)
to work.
03 Combustible materials Do Five minutes
are removed from the housekeeping concept
area below welding prior to start the job.
activity.
Spatters are arrested
by providing fire
blankets or the area
below are barricaded
Fire extinguishers
provided
Proper ventilation
Scaffolding Fall of
erection R Injury to person Ensure proper lifting &
materials,
lowering management. Tools and tackle to be tied
Clamp, Property Damage with small rope
spanner, from Standard Bags should 1 1 L
2 2 L Execution
height, be used for lifting of Imparting On the Job
clamps & other training on site.
accessories.
R Fall of walkway Walkway planks stack 1 1 L
Injury to person Ensure proper lifting & properly.
planks
lowering management.
Property Damage
Page 4 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
2 2 L Execution
Standard Bags should
be used for lifting of
clamps & other
accessories
R Collapse of Injury to person Scaffold to be erected
scaffold
on compacted & 2 2 L Scaffolding Tag system to
1 1 L
levelled surface ,Base be adopted Execution
plate to be used.
R 2 2 L
Fall from Height Injury to person Full Body harness with 1 1 L
double lanyard to be
used.
Page 5 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
1.Full Body harness
provided .
2.Rope grab fall
arrestors made
available in all vertical
ladders.
3.Prior Scaffolding Tag
must be checked.
R Green :- Safe for use
Reg:- Not Safe for use
04 On the Job training
4. Trained and
Work at provided.
medically fit (i.e. All 2 2 L
Height Fall of Person, Execution
Injury to Person the height workforce 1 1 L
Fall of material Safety Net to be provided.
Property damage, should be gone
through Vertigo
Test)workforce to be
deployed.
5. All the height work
must be started with
having valid work
permit.
6. Standard Bag should
be used for lowering of
clamps.
I will affirm that the aforesaid precautions shall be communicated to all of the workmen and ensured the compliance during the execution of the job.
Sign
Sign
Sign
Page 6 of 7
HTG ENGINEERING PVT. LTD.
2*800 MW ADANI POWER JHARKHAND LTD
HIRA REGISTER
Value Description
R : Routine NR: Non Routine E : Emergency L : Legal Requirement
Massive effect
1. Persistent severe environmental damage or severe nuisance
extending over a large area
5 2. Hi terms of commercial or recreational use or natural conservation
3. A major economic loss for the company
4. Constant and or highly exceeding statutory or prescribed limits
Major effect
X
1. Severe environmental damage.
4 2. The company is required to take extensive measures to restore
polluted or damaged environment to its original state. IMPACT / CONSEQUENCE
3. Exceeding statutory or prescribed limits.
Probability Description (The highest
Localised effect
category willloss
1. Limited beofused)
discharges to known toxicity 1 2 3 4 5
3 2. Repeated exceed of statutory or prescribed limit
3. Affecting
Value neighbourhood
Status Description
4. Spontaneous recovery of limited damage within one year P
Minor effect 1
R
1. Contamination damage sufficiently to attack the environment
2 52. SingleInevitable Happens regularly on this site
exceed of statutory or prescribed criterion
3. Single complaint. No permanent effect on environment
O
LOW RISK
B
Severity of Aspect (Impact) 2
1 Known to have occurred on A
4 Most likely this site in the past B
I 3 MEDIUM RISK
L
3 Likely Known to occur on other sites
I
T
4
2 Unlikely Known to occur in the
Industry Y
Page 7 of 7 HIGH
1
Most Minor Damage, No Delay 5 RISK
Unlikely