Professional Documents
Culture Documents
2nd Floor MDC - CONTINUITY - TEST - FORM - (PRE - AND - POST - ENER) FR-06-EMCD-A-EE-001-rev0
2nd Floor MDC - CONTINUITY - TEST - FORM - (PRE - AND - POST - ENER) FR-06-EMCD-A-EE-001-rev0
0
CONTINUITY TEST FORM (PRE AND POST ENERGIZATION)
1 General Information
a) Area: 2ND FLOOR COMMON AREA d) Brand : SANWA
b) Equipment No. : e) Model/Serial No. : 18010400149
c) Type/ Rating : THHN
2 Test Instruments
a) Multi-meter or Digital test meter b) Calibration Date: MARCH 22, 2021
3 Testing Procedure
a) After the cable and wire pulling for the electrical system:
a.1) Using the multi-meter instrument, set the tester to the ohm setting. By touching the test leads or test probes together,
the tester should indicate a Zero Ohm reading. For a digital test meter, it will likely show 0.00 ohm reading.
b) Before building energization, repeat step a.1) and record result in Pre-enerization Column (B).
b.1) For lighting system with installed fixtures, test continuity for Line-Neutral, Line-Ground and Neutral-Ground.
b.2) For Circuit breaker, test continuity for loadside of the source and line side of the equipment controller.
Page 1 of 2
CONTINUITY TEST FORM (PRE AND POST ENERGIZATION) Revision 001 September 2019
PRE-FUNCTIONAL TEST ANNEX FORM FR-06-EMCD-A-EE-001-rev.0
CONTINUITY TEST FORM (PRE AND POST ENERGIZATION)
4 Data Recording
Does the Test Pen/Test Light Glow? (YES/NO)
Acceptable Other Metal Surfaces
Location Hanger Junction Pull Panel Wall boxes Metal Meter
Result
Rods Box Boxes Boards w/ cover Ducts Center
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
NO
5 Acceptance / Approvals:
ENGR.PAUL ARON JUNIO 06/08/2021 MAGNAXA
Subcontractor's Representative Date Company
6 Distribution.
c Subcontractor
c MDC Documents Controller
c MDC MEPFS
Page 2 of 2
CONTINUITY TEST FORM (PRE AND POST ENERGIZATION) Revision 001 September 2019