REQUEST FOR INSPECTION

Saudi Aramco 6717-ENG (11/98) 726-200 (Inspection Department) Ref: RFI No. RFI-CIV-3685

BI: 10-09003-0006 JO: Phase Construction Title: Industrial Support Facilities (ISF) Package 13

To : Project Inspection Unit/ Mr. Joel Flores Civil Mech. Plumb. Comms. Elect. Others

Inspection/monitoring is required on (date) 08-July-2021 (time) 9:00 AM prior to

for the following location/equipment Steel Structure Stock Yard @ Paint Shelter, Mat. cordination, Gas Station Bldg

Work Permit Required: Yes No Inspection Level: RH Review/Approval of Documents Hold points Witness Point

SAPMT representative has verified that the work is ready for CONTRACTOR has verified that the work to be inspected is
inspection and conforms to the project requirements complete and in compliance with the following specifications:

SAPMT Name Samer Hassan SAES/SAMSS/Others# SATIP-M-100-03/SAIC-M-1068


Signature Date 08-July-2021 Contractor/Company RTCC
Telephone Fax QA/QC Name Muzamil Ali
QA/QC Signature Date 07-June-2021

This form received by the undersigned Inspection Department employee:

Name Joel Flores Signature Date Time

Work Description: Visual inspection for Handling Storage and Preservation of Structural Steel Materials and
Components
1. Rigid Frame (Column, Beam, Rafter, Portal column, Portal Rafter, Built-up Beam)
2. Eave Strut, Purlins, Shim Plate, Brace Rod, Purlin Anchor Clip,
3. Stub post, Stub beam, kicker angle, connection plate, packing plate
4. Sandwich panels (wall & Roof)
5. Miscellaneous items

NOTE: Inspector's signature is for receiving this request only and not for approval or disapproval of the work or facility inspected.

Distribution:
A. Original – Inspection Unit B. 1st Copy – RPO Proponent C. 2nd Copy – ID Coordinator D. 3rd Copy – Construction Contractor