30 MLD BUTUAN CITY

BULK WATER PROJECT

DAILY TURBIDITY READING OF


RAW AND TREATED WATER

MAY 2017
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 1, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 48.0 4.24 4.48 0.36
1:00 AM 53.9 4.12 4.57 0.49
2:00 AM 39.6 3.99 4.33 0.46
3:00 AM 33.5 4.64 4.42 0.42
4:00 AM 26.5 4.26 4.31 0.43
5:00 AM 19.7 3.95 4.02 0.76
6:00 AM 13.3 3.32 3.37 0.46
7:00 AM 13.2 4.19 3.83 0.49
8:00 AM 11.4 2.55 2.77 0.48
9:00 AM 12.6 2.71 2.83 0.61
10:00 AM 8.16 2.70 2.79 0.58
11:00 AM 9.14 2.70 2.72 0.59
12:00 PM 7.96 2.44 2.48 0.57
1:00 PM 8.52 2.63 2.70 0.77
2:00 PM 12.5 3.56 3.51 0.54
3:00 PM 12.6 3.24 3.30 0.71
4:00 PM 12.6 3.08 3.87 0.50
5:00 PM 13.6 3.14 3.61 0.43
6:00 PM 14.3 2.81 3.36 0.42
7:00 PM 16.8 3.63 4.16 0.50
8:00 PM 14.3 6.11 3.96 0.80
9:00 PM 12.8 3.58 4.01 0.76
10:00 PM 12.7 4.13 4.24 0.76
11:00 PM 12.9 2.99 3.46 0.68

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

1|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 2, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 12.9 3.19 3.29 0.72
1:00 AM 13.3 2.44 2.92 0.44
2:00 AM 11.6 3.10 3.34 0.58
3:00 AM 11.5 3.24 3.21 0.70
4:00 AM 11.8 3.94 3.72 0.61
5:00 AM 13.5 3.87 5.16 0.48
6:00 AM 10.6 3.89 4.09 0.64
7:00 AM 12.7 2.24 4.69 0.46
8:00 AM 10.1 4.89 5.32 0.55
9:00 AM 9.74 5.09 5.08 0.52
10:00 AM 9.42 3.24 4.63 0.41
11:00 AM 9.78 4.33 4.54 0.50
12:00 PM 9.02 4.21 3.39 0.48
1:00 PM 10.2 4.44 4.89 0.47
2:00 PM 9.34 4.68 4.05 0.61
3:00 PM 9.94 3.70 3.30 0.45
4:00 PM 6.71 3.83 3.51 0.51
5:00 PM 9.13 3.18 2.99 0.50
6:00 PM 7.28 3.41 2.85 0.46
7:00 PM 7.30 4.49 4.32 0.63
8:00 PM 42.1 10.6 11.1 0.46
9:00 PM 38.7 17.8 14.0 1.24
10:00 PM 19.7 14.6 13.0 0.88
11:00 PM 25.1 7.68 7.65 0.95

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

2|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 3, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 21.1 6.26 6.34 0.56
1:00 AM 36.1 7.14 6.02 0.60
2:00 AM 30.6 6.07 6.02 0.98
3:00 AM 27.4 4.42 4.46 0.90
4:00 AM 28.0 3.67 3.28 0.53
5:00 AM 20.4 2.87 2.95 0.64
6:00 AM 26.8 3.16 3.20 0.81
7:00 AM 25.6 3.69 3.55 0.68
8:00 AM 22.0 3.07 3.15 0.47
9:00 AM 19.3 2.29 2.19 0.36
10:00 AM 20.3 2.77 2.64 0.45
11:00 AM 14.1 2.99 3.19 0.38
12:00 PM 18.2 2.88 2.61 0.66
1:00 PM 15.0 2.65 2.95 0.40
2:00 PM 13.5 2.73 3.20 0.43
3:00 PM 14.0 4.39 4.57 0.34
4:00 PM 12.7 3.62 4.20 0.52
5:00 PM 15.0 6.38 6.49 0.63
6:00 PM 13.6 3.72 3.48 0.48
7:00 PM 14.0 2.64 2.78 0.63
8:00 PM 13.7 2.79 3.03 0.39
9:00 PM 13.9 2.95 2.76 0.35
10:00 PM 12.5 6.74 7.35 0.78
11:00 PM 13.5 4.08 3.46 0.56

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

3|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 4, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 12.4 3.07 2.85 0.43
1:00 AM 13.5 2.55 2.4 0.50
2:00 AM 12.9 2.62 2.66 0.56
3:00 AM 13.6 2.69 3.2 0.45
4:00 AM 13.5 2.63 2.93 0.46
5:00 AM 13.6 2.98 2.51 0.55
6:00 AM 13.1 2.21 2.47 0.39
7:00 AM 10.4 1.92 2.00 0.38
8:00 AM 9.85 1.83 1.76 0.32
9:00 AM 8.75 1.69 1.68 0.37
10:00 AM 8.3 1.70 1.63 0.32
11:00 AM 8.34 1.52 1.71 0.31
12:00 PM 8.19 1.84 2.14 0.54
1:00 PM 8.19 1.49 1.59 0.32
2:00 PM 8.74 1.86 1.76 0.5
3:00 PM no data no data no data no data
4:00 PM 8.72 3.57 3.4 0.45
5:00 PM 8.67 3.75 3.49 0.39
6:00 PM 6.86 3.54 3.72 0.57
7:00 PM 8.22 3.26 3.55 0.43
8:00 PM 7.87 4.34 4.43 0.42
9:00 PM 8.35 4.20 4.30 0.54
10:00 PM 8.51 3.76 3.72 0.71
11:00 PM 8.11 4.13 3.91 0.84

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

4|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 5, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 8.14 4.11 3.72 0.84
1:00 AM 8.61 3.98 3.73 0.75
2:00 AM 7.59 3.42 3.19 0.62
3:00 AM 7.80 3.54 3.16 0.62
4:00 AM 8.15 3.68 3.84 0.72
5:00 AM 8.59 3.38 3.07 0.63
6:00 AM 7.68 2.67 2.85 0.56
7:00 AM 8.16 3.48 3.54 0.87
8:00 AM 7.83 3.37 3.44 0.55
9:00 AM 8.89 3.21 3.17 0.82
10:00 AM 8.97 3.45 3.19 0.89
11:00 AM 8.99 3.78 3.49 0.60
12:00 PM 5.87 3.8 3.61 0.71
1:00 PM 6.03 3.27 3.13 0.63
2:00 PM 7.29 3.73 3.51 0.53
3:00 PM 8.20 3.96 3.71 0.41
4:00 PM 8.09 3.75 4.04 0.63
5:00 PM 6.69 3.65 3.75 0.41
6:00 PM 5.80 3.58 3.69 0.55
7:00 PM 6.46 3.60 3.62 0.75
8:00 PM 7.70 3.40 3.17 0.88
9:00 PM 6.90 3.30 3.19 0.64
10:00 PM 6.74 3.35 3.13 0.59
11:00 PM 6.04 3.30 3.17 0.60

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

5|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 6, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water Basin


Time
(NTU) (NTU) (NTU) (NTU)
12:00 AM 6.06 3.54 3.50 0.63
1:00 AM 5.82 3.12 3.07 0.7
2:00 AM 5.72 2.81 3.00 0.61
3:00 AM 6.16 3.2 3.30 0.71
4:00 AM 6.63 3.35 3.31 0.69
5:00 AM 6.53 3.34 3.32 0.64
6:00 AM 5.24 2.78 2.62 0.72
7:00 AM 6.87 3.25 2.9 0.86
8:00 AM 5.80 3.83 3.27 0.83
9:00 AM 5.09 3.11 2.17 0.9
10:00 AM 4.90 3.05 2.20 0.85
11:00 AM 4.89 2.67 1.77 0.78
12:00 PM 5.35 1.79 1.42 0.72
1:00 PM 4.16 1.70 1.52 0.68
2:00 PM 6.19 1.53 1.67 1.72
3:00 PM 5.02 1.75 4.36 1.85
4:00 PM 4.20 1.63 1.58 0.65
5:00 PM 4.41 2.01 1.76 0.67
6:00 PM 4.66 1.54 1.36 0.54
7:00 PM 5.05 1.42 1.32 0.44
8:00 PM 4.74 1.38 1.60 0.53
9:00 PM 4.55 1.71 1.57 0.49
10:00 PM 3.72 1.36 1.81 0.48
11:00 PM 3.97 1.27 1.31 0.46

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

6|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 7, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 3.25 1.32 1.36 0.46
1:00 AM 3.35 1.34 1.30 0.47
2:00 AM 4.10 1.12 1.14 0.55
3:00 AM 3.83 1.32 1.35 0.42
4:00 AM 3.34 1.47 1.25 0.41
5:00 AM 3.77 1.44 1.41 0.55
6:00 AM 2.70 1.64 1.32 0.67
7:00 AM 2.69 0.99 1.27 0.46
8:00 AM 3.50 1.31 1.45 0.49
9:00 AM 4.11 1.36 1.46 0.44
10:00 AM 3.57 1.54 1.45 0.43
11:00 AM 3.56 1.45 2.06 0.34
12:00 PM 2.79 1.91 2.24 0.38
1:00 PM 3.51 1.86 1.94 0.40
2:00 PM 4.27 1.74 1.67 0.44
3:00 PM 3.07 2.03 1.86 0.36
4:00 PM 2.41 1.66 1.64 0.38
5:00 PM 3.53 1.88 2.05 0.54
6:00 PM 2.45 1.67 2.00 0.41
7:00 PM 4.39 1.44 2.64 0.35
8:00 PM 3.39 1.35 0.96 0.47
9:00 PM 2.77 0.98 0.81 0.66
10:00 PM 3.10 1.33 1.30 0.38
11:00 PM 1.97 0.97 0.93 0.40

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

7|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 8, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 2.01 0.99 0.95 0.41
1:00 AM 2.95 2.71 2.65 0.70
2:00 AM 2.71 2.71 1.90 0.48
3:00 AM 2.91 0.99 1.10 0.38
4:00 AM 3.08 1.77 1.51 0.65
5:00 AM 2.19 1.41 1.33 0.65
6:00 AM 3.32 1.86 2.06 0.52
7:00 AM 2.45 1.49 1.34 0.45
8:00 AM 3.46 1.50 1.57 0.52
9:00 AM 3.07 1.50 1.67 0.54
10:00 AM 2.47 1.37 1.20 0.57
11:00 AM 3.05 1.33 1.27 0.80
12:00 PM 3.10 1.16 1.13 0.50
1:00 PM 3.05 1.00 0.89 0.38
2:00 PM 3.28 1.06 0.84 0.42
3:00 PM 2.49 1.45 1.17 0.56
4:00 PM 2.88 1.18 1.36 0.72
5:00 PM 3.00 1.11 0.76 0.69
6:00 PM 2.89 1.84 1.05 0.52
7:00 PM 2.47 0.86 0.93 0.65
8:00 PM 2.52 1.14 1.17 0.52
9:00 PM 2.38 1.30 1.57 0.69
10:00 PM 2.27 1.44 1.48 0.75
11:00 PM 2.51 1.25 1.20 0.59

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

8|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 9, 2017

Sed Tank 1 Sed Tank 2 Clear Water


Time Raw Water (NTU)
(NTU) (NTU) Basin (NTU)
12:00 AM 2.39 1.30 1.25 0.72
1:00 AM 2.36 1.25 1.48 0.61
2:00 AM 3.17 1.58 1.57 0.40
3:00 AM 2.78 1.31 1.53 0.38
4:00 AM 2.08 1.27 1.35 0.80
5:00 AM 2.29 1.39 1.23 0.43
6:00 AM 2.59 1.50 1.58 0.33
7:00 AM 2.67 1.29 1.28 0.68
8:00 AM 2.66 1.23 1.37 0.70
9:00 AM 4.92 1.84 1.90 0.52
10:00 AM 3.73 1.75 1.73 0.51
11:00 AM 3.62 1.50 1.57 0.41
12:00 PM 3.92 1.07 1.23 0.62
1:00 PM 2.52 1.14 1.00 0.31
2:00 PM 2.18 0.99 1.06 0.42
3:00 PM 2.82 0.94 0.95 0.50
4:00 PM 2.78 0.87 0.90 0.61
5:00 PM 1.85 0.75 0.77 0.44
6:00 PM 1.75 0.72 0.81 0.59
7:00 PM 2.77 0.57 0.39 0.35
8:00 PM 3.02 1.60 1.52 0.75
9:00 PM 2.17 1.48 1.54 0.59
10:00 PM 2.51 1.28 1.21 0.89
11:00 PM 3.17 1.37 1.26 0.58

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

9|P a ge
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 10, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 4.24 1.44 1.31 0.58
1:00 AM 4.14 1.71 1.67 0.67
2:00 AM 3.93 1.68 1.70 0.63
3:00 AM 4.06 1.72 1.60 0.58
4:00 AM 4.31 1.52 1.42 0.51
5:00 AM 3.42 1.43 1.70 0.55
6:00 AM 3.82 2.35 2.16 0.40
7:00 AM 8.60 2.06 1.58 0.41
8:00 AM 10.7 1.84 1.77 0.44
9:00 AM 10.3 2.79 3.00 0.45
10:00 AM 10.2 3.20 3.99 0.40
11:00 AM 13.0 6.80 5.09 0.48
12:00 PM 11.0 6.30 6.39 0.44
1:00 PM 11.8 8.86 8.25 0.41
2:00 PM 13.2 9.96 8.57 0.55
3:00 PM 11.3 8.98 7.56 0.65
4:00 PM 13.6 6.93 7.18 0.67
5:00 PM 11.6 4.78 4.19 0.91
6:00 PM 10.4 4.52 4.51 0.92
7:00 PM 10.4 4.06 3.35 0.43
8:00 PM 9.74 3.67 2.99 0.81
9:00 PM 9.73 3.55 3.19 0.78
10:00 PM 10.5 3.70 3.47 0.89
11:00 PM 10.2 3.17 3.31 0.62

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

10 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 11, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 9.10 4.34 4.93 0.66
1:00 AM 9.40 6.04 6.78 0.96
2:00 AM 9.58 4.74 4.86 0.81
3:00 AM 9.66 5.52 5.91 0.76
4:00 AM 7.45 5.17 5.14 0.75
5:00 AM 5.91 4.68 4.36 0.77
6:00 AM 4.41 3.85 3.90 0.80
7:00 AM 5.20 3.60 4.50 0.82
8:00 AM 4.95 3.71 3.88 0.76
9:00 AM 5.76 2.94 12.3 0.90
10:00 AM 5.43 1.84 1.96 0.53
11:00 AM 4.96 1.56 1.90 0.52
12:00 PM 5.25 1.74 1.63 0.41
1:00 PM 5.24 1.84 1.86 0.52
2:00 PM 7.25 2.42 2.80 0.59
3:00 PM 6.40 3.12 3.20 0.54
4:00 PM 6.34 3.15 2.95 0.46
5:00 PM 5.75 2.78 2.71 0.69
6:00 PM 6.39 3.02 3.22 0.61
7:00 PM 8.65 3.27 3.38 0.65
8:00 PM 17.5 4.07 5.04 0.42
9:00 PM 17.4 3.30 4.00 0.81
10:00 PM 17.4 6.26 6.75 1.10
11:00 PM 19.5 7.52 8.18 1.05

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

11 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 12, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 14.0 7.10 7.05 1.86
1:00 AM 15.7 7.73 7.67 1.70
2:00 AM 18.3 8.35 8.22 1.80
3:00 AM 16.9 7.72 8.11 1.72
4:00 AM 12.4 6.13 5.83 0.75
5:00 AM 12.2 5.77 6.28 1.36
6:00 AM 8.65 3.07 3.15 1.13
7:00 AM 9.55 2.75 2.86 1.10
8:00 AM 8.57 2.76 2.93 1.07
9:00 AM 9.94 2.98 2.60 0.74
10:00 AM 7.52 2.04 1.79 1.85
11:00 AM 6.60 1.77 1.67 0.80
12:00 PM 8.01 1.51 1.56 0.79
1:00 PM 7.76 1.42 1.54 0.67
2:00 PM 6.79 1.29 1.55 0.85
3:00 PM 6.52 1.43 1.86 0.65
4:00 PM 7.83 1.58 1.09 0.44
5:00 PM 7.60 1.57 1.60 0.38
6:00 PM 7.00 2.24 2.50 0.37
7:00 PM 6.57 2.14 2.26 0.40
8:00 PM 6.70 2.05 2.06 0.44
9:00 PM 6.83 2.01 2.10 0.49
10:00 PM 6.80 2.35 2.55 0.38
11:00 PM 7.32 2.09 1.85 0.45

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

12 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 13, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 7.36 2.18 1.92 0.40
1:00 AM 8.48 2.44 2.20 0.50
2:00 AM 6.46 2.45 2.78 0.51
3:00 AM 6.06 3.23 3.07 0.57
4:00 AM 5.06 3.82 3.18 0.45
5:00 AM 6.27 3.76 3.29 0.63
6:00 AM 5.29 3.27 3.37 0.60
7:00 AM 5.32 3.92 3.88 0.60
8:00 AM 5.02 4.33 4.20 0.87
9:00 AM 5.22 4.47 4.37 0.70
10:00 AM 4.95 2.18 2.03 0.59
11:00 AM 4.73 1.35 1.51 0.56
12:00 PM 4.00 1.38 2.62 0.50
1:00 PM 7.81 1.66 1.8 0.54
2:00 PM 13.3 1.45 1.42 0.35
3:00 PM 16.2 1.20 1.55 0.28
4:00 PM 15.9 1.73 2.11 0.39
5:00 PM 13.9 1.94 2.00 0.59
6:00 PM 14.1 1.93 2.49 0.39
7:00 PM 18.5 2.18 2.55 0.43
8:00 PM 14.8 1.68 2.19 0.52
9:00 PM 11.6 1.46 2.18 0.46
10:00 PM 10.8 2.00 2.28 0.67
11:00 PM 10.7 1.98 1.92 0.52

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

13 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 14, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 8.59 2.25 2.08 0.83
1:00 AM 12.2 1.63 1.97 0.70
2:00 AM 6.64 1.61 1.51 0.71
3:00 AM 8.81 1.84 1.80 0.74
4:00 AM 7.27 1.61 1.47 0.69
5:00 AM 7.25 1.56 1.44 0.50
6:00 AM 6.47 1.60 1.67 0.63
7:00 AM 6.64 1.51 1.72 0.56
8:00 AM 7.88 1.53 1.68 0.42
9:00 AM 6.82 1.51 1.42 0.79
10:00 AM 5.73 1.63 1.65 0.42
11:00 AM 5.93 1.65 1.94 0.47
12:00 PM 5.79 2.10 1.78 0.65
1:00 PM 5.12 1.26 1.37 0.29
2:00 PM 5.59 2.41 1.91 0.33
3:00 PM 6.03 2.03 1.97 0.27
4:00 PM 6.40 2.15 1.87 0.33
5:00 PM 4.65 2.35 1.84 0.29
6:00 PM 6.16 1.62 2.03 0.44
7:00 PM 5.85 1.46 1.72 0.23
8:00 PM 5.04 1.97 1.86 0.35
9:00 PM 5.20 2.24 2.12 0.28
10:00 PM 5.58 1.81 1.70 0.40
11:00 PM 5.50 1.79 1.67 0.41

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

14 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 15, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 5.18 1.47 2.04 0.31
1:00 AM 5.26 1.39 1.71 0.33
2:00 AM 5.55 1.35 1.92 0.31
3:00 AM 6.29 2.17 2.25 0.68
4:00 AM 6.01 1.86 1.70 0.59
5:00 AM 5.48 1.77 1.75 0.45
6:00 AM 5.69 1.98 1.38 0.39
7:00 AM 5.35 1.78 1.85 0.64
8:00 AM 5.67 1.70 1.96 0.30
9:00 AM 5.14 1.89 1.72 0.47
10:00 AM 5.21 1.37 1.40 0.38
11:00 AM 4.28 1.90 2.36 0.35
12:00 PM 4.5 1.82 2.41 0.35
1:00 PM 4.87 2.35 2.61 0.37
2:00 PM 5.92 3.65 3.03 0.33
3:00 PM 6.88 3.76 3.92 0.75
4:00 PM 5.13 1.86 2.01 0.40
5:00 PM 4.21 1.81 1.36 0.83
6:00 PM 4.69 1.98 1.63 0.87
7:00 PM 4.88 1.62 1.77 0.86
8:00 PM 4.60 1.41 1.68 0.90
9:00 PM 4.96 1.64 1.79 0.79
10:00 PM 5.30 1.58 1.52 0.83
11:00 PM 4.40 1.78 1.70 0.99

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

15 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 16, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 4.59 1.50 1.61 0.89
1:00 AM 4.19 1.70 1.85 0.90
2:00 AM 4.08 1.68 1.78 0.92
3:00 AM 4.82 1.61 1.54 0.88
4:00 AM 4.75 1.72 1.48 0.83
5:00 AM 4.28 1.80 1.50 0.65
6:00 AM 4.44 1.53 1.49 0.71
7:00 AM 4.18 1.45 1.66 0.69
8:00 AM 4.33 1.30 1.33 0.50
9:00 AM 3.81 1.52 1.60 0.76
10:00 AM 3.46 1.29 1.44 0.65
11:00 AM 3.46 1.86 2.80 0.86
12:00 PM 4.36 2.44 2.56 0.48
1:00 PM 3.58 2.16 2.19 0.54
2:00 PM 2.82 1.94 2.17 0.61
3:00 PM 3.27 1.99 2.03 0.50
4:00 PM 4.48 1.84 2.17 0.48
5:00 PM 3.60 2.84 2.54 0.50
6:00 PM 3.48 2.13 2.08 0.60
7:00 PM 4.01 1.84 1.77 0.43
8:00 PM 3.89 1.90 1.82 0.41
9:00 PM 3.86 2.15 2.32 0.42
10:00 PM 3.70 1.86 1.96 0.56
11:00 PM 3.34 1.92 2.15 0.41

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

16 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 17, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 3.55 2.24 2.00 0.49
1:00 AM 3.64 2.13 2.29 0.44
2:00 AM 3.31 2.04 2.18 0.41
3:00 AM 3.71 1.94 1.94 0.4
4:00 AM 3.06 1.84 1.45 0.48
5:00 AM 3.76 1.62 1.98 0.46
6:00 AM 3.42 1.58 1.67 0.32
7:00 AM 3.00 1.69 2.15 0.35
8:00 AM 4.05 3.05 2.05 0.45
9:00 AM 2.76 1.73 1.63 0.43
10:00 AM 2.70 1.66 1.72 0.30
11:00 AM 2.83 1.90 1.72 0.41
12:00 PM 2.76 1.68 1.75 0.22
1:00 PM 3.43 2.23 2.17 0.33
2:00 PM 4.62 2.54 3.62 0.36
3:00 PM 2.30 2.05 1.49 0.36
4:00 PM 2.54 1.71 1.45 0.45
5:00 PM 3.52 2.07 1.76 0.47
6:00 PM 2.71 1.69 1.74 0.57
7:00 PM 2.82 1.75 1.61 0.46
8:00 PM 3.28 1.88 1.67 0.42
9:00 PM 3.03 1.93 1.70 0.41
10:00 PM 2.96 2.11 1.81 0.42
11:00 PM 2.43 1.61 1.74 0.41

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

17 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 18, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 3.20 1.69 1.56 0.32
1:00 AM 2.64 1.88 1.80 0.40
2:00 AM 2.77 1.77 1.84 0.55
3:00 AM 2.58 1.50 1.35 0.40
4:00 AM 2.92 1.34 1.38 0.41
5:00 AM 2.95 1.27 1.40 0.30
6:00 AM 2.78 1.34 1.49 0.56
7:00 AM 2.82 1.46 1.49 0.40
8:00 AM 3.25 1.37 2.17 0.44
9:00 AM 2.49 1.39 1.52 0.43
10:00 AM 2.18 1.40 1.48 0.40
11:00 AM 2.38 1.36 1.38 0.42
12:00 PM 2.96 1.37 1.68 0.68
1:00 PM 2.93 1.97 2.48 0.57
2:00 PM 2.52 2.37 2.28 0.43
3:00 PM 2.07 1.69 1.54 0.27
4:00 PM 2.63 1.49 1.57 0.59
5:00 PM 2.83 1.50 1.67 0.61
6:00 PM 2.74 1.89 1.78 0.72
7:00 PM 2.56 1.72 1.53 0.53
8:00 PM 2.61 1.46 1.57 0.39
9:00 PM 3.10 1.60 1.55 0.52
10:00 PM 2.05 1.46 1.58 0.42
11:00 PM 2.19 1.51 1.54 0.38

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

18 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 19, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 2.22 1.53 1.78 0.42
1:00 AM 2.59 1.79 1.53 0.40
2:00 AM 2.49 1.83 1.58 0.46
3:00 AM 2.03 1.88 1.61 0.25
4:00 AM 2.22 1.71 1.86 0.45
5:00 AM 1.89 1.03 1.57 0.33
6:00 AM 2.30 1.19 1.13 0.84
7:00 AM 2.42 1.03 1.01 0.46
8:00 AM 2.08 1.42 1.46 0.25
9:00 AM 2.29 1.46 1.48 0.33
10:00 AM 2.16 1.53 1.66 0.28
11:00 AM 2.36 1.83 1.83 0.42
12:00 PM 2.28 1.99 2.25 0.23
1:00 PM 2.49 1.88 1.86 0.23
2:00 PM 2.51 1.68 1.62 0.31
3:00 PM 2.05 1.96 1.53 0.27
4:00 PM 2.26 1.80 1.75 0.33
5:00 PM 2.04 1.65 1.58 0.32
6:00 PM 2.22 1.74 1.22 0.29
7:00 PM 2.34 1.39 1.37 0.42
8:00 PM 2.36 1.40 1.42 0.39
9:00 PM 2.18 1.33 1.25 0.46
10:00 PM 1.83 1.18 1.20 0.64
11:00 PM 2.16 1.47 1.50 0.40

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

19 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 20, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 2.57 1.31 1.32 0.79
1:00 AM 2.34 1.38 1.34 0.35
2:00 AM 2.14 1.50 1.47 0.37
3:00 AM 2.24 1.60 1.55 0.39
4:00 AM 2.15 1.58 1.48 0.54
5:00 AM 2.32 1.36 1.58 0.60
6:00 AM 2.18 1.78 1.91 0.48
7:00 AM 2.34 1.48 1.49 0.21
8:00 AM 2.58 1.40 1.31 0.21
9:00 AM 2.56 1.03 1.17 0.30
10:00 AM 2.21 1.2 1.23 0.46
11:00 AM 1.99 1.19 1.21 0.69
12:00 PM 1.85 1.05 1.15 0.52
1:00 PM 1.72 0.33 1.29 0.68
2:00 PM 2.06 1.69 1.71 0.34
3:00 PM 1.72 1.27 3.26 0.36
4:00 PM 1.94 1.50 1.47 0.32
5:00 PM 1.83 1.41 1.59 0.41
6:00 PM 2.05 1.58 1.49 0.39
7:00 PM 2.18 1.48 1.40 0.47
8:00 PM 2.02 1.65 1.75 0.61
9:00 PM 2.06 1.61 1.80 0.59
10:00 PM 1.67 1.31 1.48 0.43
11:00 PM 58.9 2.13 2.20 0.31

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

20 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 21, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 97.5 3.16 3.50 0.27
1:00 AM 88.7 4.52 4.27 0.29
2:00 AM 31.8 2.88 3.05 0.24
3:00 AM 34.0 2.98 3.30 0.32
4:00 AM 38.7 9.53 10.9 0.41
5:00 AM 37.2 14.4 14.6 0.47
6:00 AM 33.0 13.7 13.0 0.80
7:00 AM 25.3 5.22 5.58 0.38
8:00 AM 27.3 4.16 6.02 0.47
9:00 AM 22.1 4.41 5.12 0.49
10:00 AM 21.1 3.73 4.23 0.48
11:00 AM 20.7 3.90 4.19 0.61
12:00 PM 21.4 3.96 3.59 0.71
1:00 PM 19.1 3.65 3.87 0.67
2:00 PM 20.2 4.71 4.74 0.57
3:00 PM 18.7 5.09 5.12 0.78
4:00 PM 20.5 12.2 12.4 1.49
5:00 PM 19.7 12.3 12.2 1.46
6:00 PM 20.9 6.38 6.42 1.36
7:00 PM 19.9 4.56 4.66 0.69
8:00 PM 18.5 4.20 4.33 0.94
9:00 PM 14.0 3.57 3.08 0.40
10:00 PM 20.4 3.49 4.16 0.43
11:00 PM 17.9 3.17 4.78 0.84

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

21 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 22, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 17.4 3.11 3.67 0.59
1:00 AM 12.3 3.68 3.16 0.77
2:00 AM 16.2 5.09 4.47 0.74
3:00 AM 17.9 4.48 4.63 0.8
4:00 AM 18.2 3.36 3.46 0.84
5:00 AM 17.5 3.33 3.18 0.58
6:00 AM 15.1 3.99 4.68 0.42
7:00 AM 17.0 4.58 4.96 0.62
8:00 AM 16.6 3.49 3.70 0.67
9:00 AM 16.1 3.19 3.10 0.74
10:00 AM 15.4 3.52 3.54 0.80
11:00 AM 12.8 3.12 3.1 0.84
12:00 PM 13.0 2.52 2.52 0.68
1:00 PM 14.0 2.27 2.53 0.42
2:00 PM 14.3 2.32 2.90 0.61
3:00 PM 14.0 3.78 3.42 0.84
4:00 PM 14.6 3.10 2.85 0.74
5:00 PM 15.0 2.64 3.00 0.82
6:00 PM 15.1 3.16 3.60 0.75
7:00 PM 13.3 4.27 4.48 0.92
8:00 PM 13.7 5.09 5.26 0.83
9:00 PM 12.9 5.11 5.14 0.90
10:00 PM 11.2 4.57 4.38 0.89
11:00 PM 12.8 5.12 5.05 0.63

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

22 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 23, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 11.5 3.67 3.75 0.93
1:00 AM 13.6 3.10 2.98 0.97
2:00 AM 11.6 4.35 4.32 0.78
3:00 AM 13.2 5.07 5.38 0.98
4:00 AM 10.2 5.32 5.97 0.96
5:00 AM 11.2 3.73 3.88 0.95
6:00 AM 10.1 3.21 3.24 0.74
7:00 AM 9.79 2.28 2.41 0.67
8:00 AM 9.37 2.33 2.35 0.76
9:00 AM 9.35 1.97 2.08 0.79
10:00 AM 8.8 2.22 2.38 0.69
11:00 AM 7.86 2.34 2.25 0.65
12:00 PM 8.56 1.96 1.95 0.42
1:00 PM 9.70 2.12 2.15 0.34
2:00 PM 7.80 2.27 2.38 0.27
3:00 PM 6.44 1.84 1.75 0.71
4:00 PM 8.65 2.55 2.39 0.43
5:00 PM 6.32 3.28 2.24 0.65
6:00 PM 7.51 2.52 2.77 0.47
7:00 PM 8.34 2.49 2.33 0.48
8:00 PM 7.43 2.51 2.41 0.43
9:00 PM 7.29 2.12 2.05 0.36
10:00 PM 7.87 2.07 1.86 0.36
11:00 PM 8.35 2.17 1.80 0.40

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

23 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 24, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 8.50 2.17 2.18 0.31
1:00 AM 7.67 2.44 2.20 0.40
2:00 AM 8.80 2.19 2.10 0.43
3:00 AM 7.30 1.63 1.74 0.25
4:00 AM 6.99 1.53 1.9 0.35
5:00 AM 7.43 1.86 1.66 0.37
6:00 AM 7.19 1.32 1.35 0.36
7:00 AM 8.46 1.31 1.37 0.37
8:00 AM 8.80 1.45 1.84 0.36
9:00 AM 8.73 1.87 1.99 0.42
10:00 AM 8.57 2.72 2.49 0.61
11:00 AM 7.82 2.07 2.27 0.53
12:00 PM 7.43 2.00 2.22 0.47
1:00 PM 8.13 1.73 1.73 0.53
2:00 PM 8.02 2.00 1.61 0.64
3:00 PM 7.70 1.81 1.71 0.33
4:00 PM 7.60 2.01 1.84 0.39
5:00 PM 7.24 1.93 2.09 0.38
6:00 PM 7.03 1.97 2.01 0.36
7:00 PM 9.68 2.07 2.52 0.43
8:00 PM 14.4 2.03 2.49 0.55
9:00 PM 17.0 2.40 2.23 0.67
10:00 PM 17.6 2.99 3.08 0.50
11:00 PM 15.4 4.4 3.42 0.69

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

24 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 25, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 18.8 3.06 3.16 0.49
1:00 AM 81.0 2.82 3.19 0.47
2:00 AM 93.1 3.74 3.78 0.52
3:00 AM 62.9 3.59 3.87 0.36
4:00 AM 44.2 2.96 2.85 0.38
5:00 AM 27.2 2.54 2.54 0.40
6:00 AM 21.9 2.30 2.23 0.25
7:00 AM 16.9 2.45 2.62 0.26
8:00 AM 15.8 2.07 2.29 0.50
9:00 AM 14.0 2.04 2.05 0.82
10:00 AM 12.8 1.99 2.26 0.90
11:00 AM 13.4 1.90 2.23 0.57
12:00 PM 13.4 2.43 2.53 0.32
1:00 PM 14.1 2.18 2.48 0.55
2:00 PM 14.8 2.33 2.72 0.68
3:00 PM 15.4 2.42 2.50 0.56
4:00 PM 273 3.50 3.72 0.63
5:00 PM 205 4.02 4.06 0.47
6:00 PM 207 4.30 4.56 0.98
7:00 PM 100 3.71 4.91 0.93
8:00 PM 87.6 4.17 4.19 0.34
9:00 PM 83.9 4.75 4.19 0.37
10:00 PM 69.4 4.07 4.00 0.56
11:00 PM 60.1 3.93 4.04 0.52

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

25 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 26, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 49.8 3.44 7.00 0.47
1:00 AM 42.3 4.47 4.36 0.57
2:00 AM 39.3 2.94 2.96 0.39
3:00 AM 31.3 2.48 2.41 0.34
4:00 AM 30.6 4.00 5.17 0.43
5:00 AM 28.7 3.97 3.75 0.38
6:00 AM 31.1 3.19 3.54 0.45
7:00 AM 21.0 2.76 2.82 0.50
8:00 AM 20.6 3.03 3.03 0.61
9:00 AM 18.9 2.54 2.59 0.37
10:00 AM 19.8 2.84 2.73 0.62
11:00 AM 18.2 2.36 2.40 0.61
12:00 PM 18.2 3.23 3.27 0.35
1:00 PM 19.5 4.93 4.72 0.44
2:00 PM 18.9 3.17 3.07 0.61
3:00 PM 17.9 3.50 2.64 0.37
4:00 PM 17.5 3.26 2.71 0.61
5:00 PM 16.7 3.06 2.90 0.52
6:00 PM 19.0 3.21 2.79 0.40
7:00 PM 17.0 2.88 2.67 0.61
8:00 PM 17.0 3.30 2.77 0.38
9:00 PM 16.4 3.10 3.24 0.53
10:00 PM 16.9 2.82 2.88 0.74
11:00 PM 17.0 3.45 3.12 0.45

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

26 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 27, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 18.9 3.55 3.42 0.53
1:00 AM 18.4 4.31 3.23 0.78
2:00 AM 17.6 3.62 3.36 0.51
3:00 AM 16.9 3.30 3.54 0.74
4:00 AM 15.2 3.58 3.87 0.66
5:00 AM 15.8 4.00 3.58 0.75
6:00 AM 16.0 3.67 4.02 0.56
7:00 AM 14.9 3.08 2.93 0.38
8:00 AM 15.1 2.85 2.81 0.68
9:00 AM 17.4 2.59 2.75 0.25
10:00 AM 14.4 3.25 2.39 0.34
11:00 AM 12.9 2.23 2.83 0.31
12:00 PM 10.9 2.46 2.26 0.26
1:00 PM 10.5 2.19 2.20 0.29
2:00 PM 11.7 2.26 2.30 0.25
3:00 PM 10.6 2.42 2.58 0.28
4:00 PM 10.8 2.72 2.78 0.36
5:00 PM 11.9 2.58 2.57 0.38
6:00 PM 12.0 2.41 2.50 0.36
7:00 PM 10.8 2.20 2.79 0.51
8:00 PM 10.7 2.40 2.52 0.34
9:00 PM 10.4 2.78 2.49 0.39
10:00 PM 11.8 1.96 2.72 0.61
11:00 PM 10.1 3.12 2.40 0.50

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

27 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 28, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 10.5 2.39 2.81 0.52
1:00 AM 9.77 2.72 2.93 0.54
2:00 AM 9.79 3.06 2.87 0.43
3:00 AM 9.81 2.98 2.97 0.51
4:00 AM 10.3 3.43 3.37 0.66
5:00 AM 10.3 2.63 2.91 0.60
6:00 AM 10.6 2.87 3.08 0.71
7:00 AM 9.69 2.36 2.73 0.66
8:00 AM 9.30 2.64 2.56 0.37
9:00 AM 9.09 2.24 2.52 0.33
10:00 AM 8.23 2.34 2.14 0.39
11:00 AM 8.14 2.15 1.97 0.43
12:00 PM 8.48 2.18 2.18 0.33
1:00 PM 10.5 5.51 6.01 0.35
2:00 PM 7.76 5.78 5.90 0.35
3:00 PM 8.65 4.68 4.87 0.46
4:00 PM 7.52 4.71 4.86 0.49
5:00 PM 8.47 5.05 5.10 0.51
6:00 PM 7.83 5.73 4.89 0.55
7:00 PM 8.33 4.57 4.67 0.61
8:00 PM 7.14 4.82 4.74 0.47
9:00 PM 7.84 4.28 4.14 0.76
10:00 PM 7.55 5.21 5.82 0.57
11:00 PM 6.77 5.13 4.14 0.56

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

28 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 29, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 6.56 4.17 4.40 0.64
1:00 AM 6.17 4.42 4.91 0.53
2:00 AM 5.93 4.03 3.89 0.64
3:00 AM 5.33 4.12 4.11 0.34
4:00 AM 6.58 4.90 4.78 0.58
5:00 AM 6.28 4.11 4.39 0.74
6:00 AM 7.35 4.75 4.63 1.41
7:00 AM 6.70 2.07 3.91 0.52
8:00 AM 8.42 2.24 2.63 0.63
9:00 AM 6.97 1.81 2.15 0.61
10:00 AM 6.60 1.79 1.77 0.44
11:00 AM 5.58 2.10 2.23 0.69
12:00 PM 5.89 1.87 2.10 0.43
1:00 PM 6.09 2.13 2.20 0.40
2:00 PM 6.39 2.38 2.28 0.46
3:00 PM 4.41 1.96 1.97 0.76
4:00 PM 5.65 1.99 1.90 0.78
5:00 PM 6.55 2.66 2.63 0.98
6:00 PM 4.85 3.04 2.24 0.90
7:00 PM 4.62 2.11 1.88 0.74
8:00 PM 5.05 1.92 2.25 0.51
9:00 PM 4.99 2.15 1.98 0.72
10:00 PM 4.82 1.75 1.82 0.62
11:00 PM 6.81 1.44 1.47 0.36

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

29 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 30, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 4.40 1.48 1.55 0.61
1:00 AM 5.18 1.70 1.61 0.82
2:00 AM 4.42 1.52 1.71 0.35
3:00 AM 5.18 1.80 1.88 0.31
4:00 AM 4.72 1.98 1.72 0.32
5:00 AM 4.08 1.58 1.85 0.30
6:00 AM 5.05 2.05 2.05 1.95
7:00 AM 4.52 2.07 2.07 2.09
8:00 AM 4.54 1.72 1.72 1.88
9:00 AM 5.22 1.71 1.71 1.75
10:00 AM 6.56 1.67 1.67 1.75
11:00 AM 4.60 1.56 1.56 1.72
12:00 PM 4.80 1.60 1.60 1.80
1:00 PM 4.86 1.88 1.88 1.97
2:00 PM 5.63 2.47 2.51 0.75
3:00 PM 5.15 2.22 2.35 0.46
4:00 PM 4.66 1.77 1.97 0.50
5:00 PM 3.69 1.87 1.79 0.77
6:00 PM 4.45 1.64 1.61 0.64
7:00 PM 5.34 1.54 1.67 0.52
8:00 PM 4.88 1.60 1.54 0.55
9:00 PM 4.80 1.68 1.70 0.72
10:00 PM 4.73 1.36 1.26 0.50
11:00 PM 4.27 1.28 1.55 0.60

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER

30 | P a g e
DAILY MONITORING OF TURBIDITY OF RAW AND TREATED
WATER

TAGUIBO AQUATECH SOLUTIONS CORPORATION


May 31, 2017

Raw Water Sed Tank 1 Sed Tank 2 Clear Water


Time
(NTU) (NTU) (NTU) Basin (NTU)
12:00 AM 4.90 1.33 1.55 0.54
1:00 AM 4.22 1.44 1.62 0.47
2:00 AM 5.42 1.32 1.48 0.34
3:00 AM 3.97 1.72 1.53 0.67
4:00 AM 4.01 1.54 1.58 0.50
5:00 AM 3.97 1.71 1.72 0.39
6:00 AM 4.22 1.54 0.69 0.54
7:00 AM 4.86 1.35 1.46 0.39
8:00 AM 4.98 1.42 1.56 0.30
9:00 AM 4.39 1.43 1.50 0.50
10:00 AM 4.16 1.46 1.61 0.64
11:00 AM 4.08 1.39 1.43 0.72
12:00 PM 3.20 1.39 1.03 0.55
1:00 PM 4.47 1.34 1.43 0.37
2:00 PM 5.87 1.46 1.53 0.62
3:00 PM 3.24 1.36 1.42 0.68
4:00 PM 3.08 1.58 2.34 0.35
5:00 PM 8.12 4.46 1.54 0.59
6:00 PM 4.17 2.76 1.69 0.34
7:00 PM 4.10 1.88 1.86 0.36
8:00 PM 3.83 1.53 1.32 0.42
9:00 PM 5.13 1.46 1.69 0.44
10:00 PM 4.87 1.39 1.54 0.93
11:00 PM 5.75 1.66 1.87 0.25

Prepared by:

BRAINARD B. CONCORDIA
ESTII PROCESS ENGINEER