Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Service Training

MALAGA

M300 Wheeled Excavators

2. PILOT SYSTEM

Franta
DECEMBER 1997
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

PILOT PUMP

ENGINE LEFT SIDE

Page: 2-2
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

PILOT MANIFOLD

MANIFOLD FLOW CONTROL VALVE

Page: 2-3
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

PILOT MANIFOLD

SWING PRV MAIN PUMP PRV

Page: 2-4
Page:

PILOT MANIFOLD COMPONENTS


2-5

LOW FLOW ATTACHMENT


LINE RELIEFVALVE

PILOT FLOW CONTROL VALVE

PILOT ACCUMULATOR

IMPLEMENTACTIVATION
SOLENOIDVALVE LOW FLOW
ATTACHMENT
CONTROL VALVE
TRAVELACTIVATION
SOLENOIDVALVE
B LOW FLOW
MAIN PUMP H ATTACHMENT

CHAPTER : PILOT SYSTEM

M300 WHEELED EXCAVATORS


POWERSHIT RELIEF VALVE
PRESSURE Pst A
A1 M
SWING PUMP M5 A2 PILOT PRESSURE
POWERSHIT
PRESSURE A5
A6 LOW FLOW
ATTACHMENT
T PRESSURE

M6 PILOT PRESSURE RELIEFVALVE


SWING BRAKE
SOLENOIDVALVE
A3 PILOT OIL FILTER
CREEPER SPEED MAIN PUMP PRV WITH
SOLENOIDVALVE MANUAL BACK-UP
A4
SWING PUMP
MANUAL
BACKUP SWING PUMPPRV WITH
MANUAL BACK-UP
Page:

PILOT MANIFOLD SCHEMATIC


2-6

Pilot
Implement Accumulator
Activation
Travel Activation Solenoid Pilot Flow Low Flow
Solenoid Vaslve To Brake To Control Valve Attachment
Swing Valve Transmission
Brake Relief Valve Low Flow
Solenoid To
Valve To Travel To Attachment
Pedal Pilot Pilot Attachment Control Valve
Pressure

Pilot Pressure

CHAPTER : PILOT SYSTEM

M300 WHEELED EXCAVATORS


From Swing
Pump

To Swing
Brake
Low Flow Orifice
Attachment Check
To Travel Pilot Line Relief Valves
From Valves
Motor Swing Pressure
To
Pump Main Relief
Pump Valve Wheel Brake
Valve
AES Swich Check
Swing Pump Valve

Creeper Pilot
Swing Pump Main Pump Oil Brake / Pilot
Speed PRV with Manual PRV with Pump
Solenoid Filter
Backup Manual Backup
Valve
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

JOYSTICK VALVE

LEFT RIGHT

Low
Option Flow
Option Attachment
Low Right
Flow
Attachment
Left

Adjusting
Screw
kPa

Play
2400 0.5-1 mm
Rod

1000 Metering
600
Springs
Centering
0 0,975 3,175 7,55 Spring
Metering Spool
Travel (mm) Metering
Spool

T P
Main Control
Valve

Page: 2-7
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

PEDAL PILOT VALVE


TRAVEL & AUXILLIARY

Rod
Magnet Metering
Pedal detent Spring
for Travel T
Centering
Spring
P
Spool

kPa

2400

600

0 0,85 5,8
Metering Spool
Travel

Page: 2-8
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

DOZER PILOT VALVE

HOLD
LOWER RAISE

Adjusting
Screw

Play 0.5-1 mm

Metering
Spring
T
Centering
Spring
P
Metering
Spool

kPa

2400

600
mm
0 0.85 7.5 Metering
Spool Travel

Page: 2-9
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

OSCILATING AXEL &


OPERATING BRAKE VALVE

III
To II
Operating
Brake
A T
B P
To
Oscilating
Axle I
II
III I
Lever screw

Spring

Lever sleeve

Rotary
Slide Brake Travel
Valve Cutoff Switch

Body

B
P B A T P1
Plate

Connector
screw
I All brakes and axle stabilizers released ( for travel)
T P
P1
II All brakes released and axle stabilizers locked
III All brakes and axle stabilizers locked (for parking
or excavator operation)

Page: 2-10
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

RELIEF AND FLOW CONTROL VALVES

Low Flow
Pilot Pressure Pressure
Relief Valve Relief Valve

P T P T

P Pilot T
Flow Control
Valve

15 l/min
to Pilot
Circuit

Low Flow
Attachment
Orifice
or Tank
Low Flow
Pilot Attachment
or Tank

P
Pump

Page: 2-11
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

SOLENOID VALVES

24 V
LED

Port A
Spool

Manual
Operation Tank

Coil

P
T Pump
1 3

2
Creeper Speed A
Swing Brake
T ravel Activation
Implement Activation

Page: 2-12
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

PROPORTINAL REDUCING VALVE


(Main and Swing Pumps)

(Manual
Back-up) Anchor Coil Spring Stopring Spool

(Controller
Position)
P
Cotter T
pin

T
A
P

Cotter pin

In Controller position installed,


for Manual back-up position pulled out

Page: 2-13
M300 WHEELED EXCAVATORS
CHAPTER : PILOT SYSTEM

GEARSHIFT AND PARKING BRAKE VALVE

A-A

A P Residual Brake
Pressure Relief
B Valve

Adjusting Screw

Manual Park
Brake Release Gearshift
24 V from 24 V from
Parking Gearshift
Brake Switch switch
Parking
Brake

LED LED

P
A

Accumulator
A B

Residual Brake
PressureAdjustment A

Page: 2-14

You might also like