FEASIBILITY STUDY ON SOLID WASTE MANAGEMENT – GROUP C
Group members Roles and Responsibilities:
1. Creation of a WhatsApp group – Kabwe Silavwe 2. Main Report - Makalicha k. 3. Technical Feasibility study - Nsowela F. 4. Scheduling Feasibility - Kabwe Silavwe 5. Economic Feasibility - Bruce Zangata 6. Operational Feasibility - Nguni 7. Leagal Feasibility - A. Mulenga 8. Albert and Chewe - Google Maps/ Zones of Zambia Compound, Populations, Administration and help other groups
Requirements:
1. Each individual to complete assignments and hand over to Mr Katoha
2. The team to undertake a site visit of the area 3. Collect information on economic activites in the area 4. Solid waste generation – types, disposal site, collection methed and current practices 5. Road networks and zones 6. Who is doing what in the compound? 7. Photograph of specific areas of interest. Make proposals as to when conduct site viste Meeting and briefing times Comparing of notes Any other activities and assignments