Quality Changes THE World: SYT80 (T6510-8)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

QUALITY CHANGES THE WORLD

QUALITY CHANGES THE WORLD

QUALITY
CHANGES
THE SANY HEAVY INDUSTRY CO.,LTD.
SANY TOWER CRANE
SYT80 (T6510-8)
WORLD Address: SANY Industrial Park, Economic and Technological Development Zone,
Changsha, Hunan, China.
Service Hotline: +0086-4006-098-318
Email: crd@sany.com.cn
For more information, please visit: www.sanygroup.com
For our consistent improvement in techonology, specifications may change without notice.
The machines illustrated may show optional equipment which can be supplied at additional cost.
Distributed By:

www.sany.com.cn
PAGE PAGE PAGE

Monoblock Section 01 Monoblock Section 02 Monoblock Section 03

■ Jib Length & Tip Load ■ Load diagrams ■ Packing List


Range Max. lifting capacity 18 20 22 25 28 30 32 35 38 40 No. Name Shape L(m) B(m) H(m) Weight of single piece (t) Qty.
2.5~23.1m/4t 4.00 3.64 3.17 2.91 2.69 2.40 2.16 2.02
6.8m

65m 1 Boom section I 10.19 1.45 1.36 1.40 1


2.5~12.6m/8t 5.29 4.67 4.17 3.57 3.10 2.84 2.62 2.33 2.09 1.95
① ② ③ ④ ⑤ ⑥ ⑦ ⑧ ⑨
2.5~25.9m/4t 4.00 3.64 3.35 3.10 2.77 2.50 2.34
2.5m 65m 60m
2.5~14.1m/8t 6.02 5.33 4.76 4.09 3.57 3.28 3.03 2.70 2.43 2.27 2 Boom section II 10.19 1.32 1.30 0.97 1
12.9m 8t 1.00t 2.5~25.9m/4t 4.00 3.65 3.36 3.11 2.78 2.51 2.35
① ② ③ ④ ⑤ ⑥ ⑦ ⑨ 55m
2.5~14.1m/8t 6.04 5.34 4.78 4.10 3.58 3.29 3.04 2.71 2.44 2.28

H=43m
60m 2.5~26.0m/4t 4.00 3.66 3.37 3.11 2.79 2.51 2.36 3 Boom section III 5.19 1.32 1.30 0.43 1
1.35t
50m
2.5~14.1m/8t 6.05 5.35 4.79 4.11 3.59 3.30 3.04 2.72 2.44 2.29
① ② ③ ④ ⑤ ⑦ ⑨

55m 2.5~26.0m/4t 4.00 3.66 3.37 3.12 2.79 2.52 2.36


52.1m

45m
1.53t 2.5~14.2m/8t 6.06 5.36 4.80 4.12 3.59 3.30 3.05 2.72 2.45 2.29 4 Boom section IV 10.19 1.32 1.30 0.80 1
① ② ③ ④ ⑤ ⑥ ⑨
1.8m 2.5~26.0m/4t 4.00 3.66 3.37 3.12 2.79 2.52 2.36
50m 40m
2.5~14.2m/8t 6.06 5.36 4.80 4.12 3.59 3.30 3.05 2.72 2.45 2.29
15×2.8=42m

1.76t 2.5~26.1m/4t 4.00 3.67 3.38 3.12 2.80 5 Boom section V 10.19 1.32 1.30 0.69 1
2.8m

① ② ③ ④ ⑤ ⑨
35m
45m 2.5~14.2m/8t 6.08 5.38 4.81 4.13 3.60 3.31 3.05 2.73
2.03t 6 Boom section VI 5.19 1.32 1.30 0.38 1
① ② ③ ⑤ ⑥ ⑨ Range Max. lifting capacity 42 45 48 50 52 55 58 60 63 65
40m 2.5~23.1m/4t 1.89 1.72 1.58 1.49 1.41 1.29 1.20 1.13 1.05 1.00
65m
⑨ 2.36t 2.5~12.6m/8t 1.82 1.65 1.51 1.42 1.34 1.22 1.13 1.06 0.98 0.93 7 Boom section VII 10.19 1.32 1.30 0.63 1
① ② ③ ⑤
2.5~25.9m/4t 2.20 2.01 1.84 1.74 1.65 1.53 1.42 1.35
35m 60m
2.5~14.1m/8t 2.13 1.94 1.77 1.67 1.58 1.46 1.35 1.28
2.80t
2.5~25.9m/4t 2.21 2.02 1.85 1.75 1.66 1.53 8 Boom section VIII 5.19 1.32 1.30 0.34 1
55m
2.5~14.1m/8t 2.14 1.95 1.78 1.68 1.59 1.46
2.5~26.0m/4t 2.21 2.02 1.85 1.76
50m 9 Boom section Ⅸ 0.82 1.45 1.46 0.10 1
■ Counter-jib Ballast 2.5~14.1m/8t 2.14 1.95 1.78 1.69
2.5~26.0m/4t 2.22 2.03
Total weight of 2550kg 1500kg 45m
Boom length (m) Balance jib length(m) counterweight (kg) counterweight (blocks) counterweight (blocks)
2.5~14.2m/8t 2.15 1.96 10 Tower cap 9.53 1.42 1.90 2.76 1
65 12.9 17850 7 0
60 12.9 16800 6 1
11 Hook 0.92 0.22 1.09 0.24 1
55 12.9 15750 5 2
50 12.9 14250 5 1 ■ Load Capacity Diagram ■ Mechanisms
45 12.9 12750 5 0 6
Model Power Speed 12 Climbing frame 6.63 2.46 2.34 3.42 1
40 12.9 10650 3 2
35 12.9 9600 2 3 Four ratio Slewing SHJ100A 2×5.5kW 0~0.75r/min
5
Two ratio Slewing

Rated lifting capacity / t


Trolleying SXJ33.62P 4KW 0~55m/min 13 2.39 2.39 2.10 4.14 1
■ Masts ■ Anchorages 4 2t 0~80m/min
assembly

4t 0~40m/min
H(m) H(m) 3 Lifting SQJ04DPA 30KW 14 Loading dolly 1.30 1.56 0.68 0.29 1
43.3 43.0 4t 0~40m/min
15 15 40.2
40.5
14 14 37.4 8t 0~20m/min Rear boom
13
37.7 2
34.9 13 34.6 Counterforce at 15 section of 6.19 1.38 0.61 0.82 1
12 90t 230m Power Power
32.1 12 31.8 working state 380V(±10%) 50Hz
F1 voltage frequency balance boom
2.8m

2.8m

11 11 29.0 211m
1.00
29.3 Counterforce at 1
10 10 26.2 113t 0.93 Note: If working rope capacity is greater than 380m, Front boom
26.5 non-working state 191.4m
9 9 23.4 please contact the manufacturer.
8
23.7 Counterforce at 171.8m 16 section of 6.29 1.38 0.58 0.86 1
20.9 8 20.6 58t 0 2.5 16.2 29.3 65
7 7 17.8
working state balance boom
18.1 F2 152.2m 0 10 20 30 40 50 60 70
6 6 15.0 Counterforce at Boom length / m
15.3 85t
5 5 12.2 non-working state 65m boom lifting capacity diagram
4
12.5 132.6m 17 Full set of cab 1.85 1.20 2.20 0.40 1
9.7 4 9.4 Self-weight under the condition
199.0m

3 110.2m
3 of independent height and
179.4m

41t
0.3m

2
159.8m

2 longest lifting boom (not including 87.8m


1 1
140.2m

counterweight or lifting load) 18 Basic section 2.83 2.12 2.12 1.15 1


120.6m

65.4m
98.2m

F1 F2 F1 F2 43m
75.8m
53.4m

Fixed with outriggers Fixed with bolts


Standard
31m

19 2.80 1.96 1.96 0.93 11


section

20 Fortified section 2.80 1.96 1.96 0.98 3

SYT80(T6510-8) SYT80(T6510-8) SYT80(T6510-8)

You might also like