Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 KE NIL In note no. 8.4, HEI to revise galvanize coating quantity of 180g/m2 Meet the requirements
steel material and provide minimum and average weight of GB code GB510018-2002.
of zinc coating as 380 and 305 gm/m2 respectively for hot
dip method as per RFP.
2. 0 KE NIL HEI to provide stainless steel fixings which are smaller Confirm.
than M10.
3. 0 NE NIL Description and details of Paint/Galvanization shall strictly IF Galvanization already don’t
comply with approved painting /coating procedures/RFP. need be painted . For the
galvanization’s protection easy
to be maintained than painting.
4. 0 NE NIL All the bolts, nuts, washers etc. shall be hot dip Confirm.
galvanized or as per owners specifications. M/s HEI shall
confirm
5. 0 NE NIL Please rectify the note 5.3.2 Where need to be rectified?
HEI checked it again ,it is well.
6. 0 NE NIL Main members shall be Q345 and bracing members shall Noted.
be Q235 as per approved Design criteria
7. 0 NE NIL Note no.1 shall be revised for Q345. Noted.
Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
8. 0 NE NIL Refer Note 8.2.3, the exposed surfaces after welding Hei will provide zinc paint by
shall be protected by galvanized (Zinc) coating. hand for corrosion protection of
exposed surfaces after welding
at site.
9. 1 NE 4,6,7 Noted
10. 1 NE 5 Duplication and contradiction of statement. E43 shall not
be used for Q345.please check the note again.
11.