Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: E113S-KTPS-T0305-03,04 Issued on: 10.06.2020


Contactor: hanlei@china-hei.com Stage: Detail Design Completion Date: 24.06.2020

Reviewer KE Document Control TEG Document Control NESPAK Document Control RE2 Document Control
Contact: Amir.ipbal@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: E113S-KTPS-T0305-03,04


Drawing/Document Title: CONNECTION JOINT 1,2

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 4
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 KE NIL Height of hand rail to be at least 1.2m, HEI to comply & Noted. Please refer to revised
revise in all the relevant drawings. drawings.
2. 0 NES NL Refer our comments on all related drawings. Noted.
3. 0 NES NL Handrail pipe diameters seems on small size. Please The pipe size please Refer to
provide reference of standard size in GB code/standard picture below.
documents

4. 0 NE NIL All the levels mentioned in the drawing shall be as per Noted.
relevant approved drawings.
Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
5. 0 NE NIL It is our understanding that connections will be detailed Noted.
by the vender/manufacturer as per the design loadings
and assumptions considered in the design. M/s HEI shall
confirm and stand responsible.
6. 0 NE NIL All welds shall be confirmed by the contractor as per Noted.
manufacturer specification before execution at site. M/s
HEI shall confirm and stand responsible.
7. 0 NE NIL M/s HEI shall ensure that all the fabrication will be carried Confirm.
out as per drawings and assumptions made in the design.
8. 1 NE 2 to 7 Noted

One behalf of the Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

Page 2 of 2

You might also like