900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

Issuer: Contractor Comment Sheet ID.: E113S-KTPS-T0305-05 Issued on: 10.06.2020


Contactor: hanlei@china-hei.com Stage: Detail Design Completion Date: 24.06.2020

Reviewer KE Document Control TEG Document Control NESPAK Document Control RE2 Document Control
Contact: Amir.ipbal@ke.com.pk piotr.sputo@tractebel.engie.com haseeb.saqib@nespak.com.pk ke.design@renewableresources.com.pk

Drawing/Document ID: E113S-KTPS-T0305-05

Drawing/Document Title: STEEL FRAME LAYOUT

The Categories of Approval: 1 = Approved, no comments / reviewed

Cat: 1
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only

Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Action Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering (To be submitted together with the
GmbH (Owner’s Engineer); NES = NESPAK (Owner’s Engineer); RE2 = revised/completed documents)
Renewable Resources Ltd. (Owner’s Engineer)]
1. 0 NE NIL All the levels mentioned in the drawing shall be as per Noted. Please refer to revised
relevant approved drawings. drawings.
2. 0 NE NIL It is our understanding that the connections will be Noted.
detailed by the vender/manufacturer as per the design
loadings and assumptions considered in the design. M/s
HEI shall confirm and stand responsible.
3. 0 NE NIL All welds shall be confirmed by the contractor as per Confirm.
manufacturers / vendors crane specification before
execution at site. M/s HEI shall confirm and stand
responsible.
4. 0 NE NIL M/s HEI shall ensure that all the fabrication will be carried Noted.
out as per drawings and assumptions made in the design.
5. 0 NE NIL Structural design calculations shall be provided for the Noted. Please refer to
frame. caculation report.
6. 1 NE 1 to 5 Noted
7.

Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan

One behalf of the Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:

Signature
:

Date:

Page 2 of 2

You might also like