Core Site Power System Inspection And Maintenance Project

Maintenance Work Quotation For Mawlamyaing ( MON 00236 )


Materials
Support

Support for DS
Specification

1-1
2"x4"x2"x10' Channel Iron ( 2 nos )
Full Clamp for Channel Iron
Bolts and nuts (assorted size) with washer

Equipment

11 kV Dis connecting Switch

Specification
1-2

12kv/630A, Connector must be copper. (Handle must have insulator between Disconnection switch and Rotary Handle)
( YANKAI China )

Equipment

11 kV Drop Out Fuse (3 nos=1 set)

1-3 Specification

12kv/100A (10kA)/ ( RANKAI China )

Transformer Accessory

OLTC Back Up Battery


1-4 Description
12V 100AH VRLA ( UTL )

EARTHING

1-5 Earthing Materials


TYPE Specification
1-6 1C x 95 mm2 CU/ PVC Insulated cable Green -Yellow

1-7 95 mm2 , Cu, cable lug

1-8 HDBC No.4 for connection Golden Lion ( For earth )

1-9 Cu, Earth Rod (5/8" Dia x 6.5L) Set for neutral, body and Ligtning Arrester (6 Pcs)

1-10 Earth Pownder


2: SERVICES
Electrical installation
Installation of transformer
Including:
2-1
Assembling of Dis-connection switch
Assembling of Drop-Out-Fuse

EARTHING
Earting system installation
Including:
2-2
Earth Resistance : ( 1 ) L.A < 7 Ohm, ( 2 ) TF body & D.S body <3 Ohm, ( 3 ) TF (N)<2 Ohm

Transportation

Transportation
Including:
2-3 Transportation on Site

All accessory

4: CHARGES
Other Charges

EPC Shut down Charges


3-1
Paper Work charges

3-2 Project Management Fee

GRAND TOTAL
ance Project
g ( MON 00236 )

Unit Unit Price Qty Total Price

Set 100000 1 100000

Unit Unit Price Qty Total Price

Set 600000 1 600000

Unit Unit Price Qty Total Price

Set 150000 1 150000

Unit Unit Price Qty Total Price


Set 250000 1 250000

Unit Unit Price Qty Total Price

Meter 15000 20 300000

No 2000 3 6000

lb 6000 30 180000

Set 45000 3 135000

Pkg 40000 3 120000


Unit Unit Price Qty Total Price

200000 1 200000

Unit Unit Price Qty Total Price

Set 120000 3 360000

Unit Unit Price Qty Total Price

Set 400000 1 400000

Unit Unit Price Qty Total Price

Lot 400,000 1 400,000

Lot 300,000 1 300,000

Lot 350,100 1 350,100

3,851,100
Core Site Power System Inspection And Maintenance Project
Maintenance Work Quotation For Taung Gyi ( SHS 00031 )
EQUIPMENT
Support

Support for DS
Specification
1-1 2"x4"x2"x10' Channel Iron ( 4 nos )
Full Clamp for Channel Iron
Bolts and nuts (assorted size) with washer

Equipment

11 kV Dis connecting Switch


Specification
1-2
12kv/630A, Connector must be copper. (Handle must have insulator between Disconnection switch and Rotary Handle)
( YANKAI China )

Equipment

11 kV Lightning Arrestor (3 nos=1 set)


1-3 Specification

Outdoor Type, (L2.5' x D1.5' x H3'), Thickness -2 mm, Epoxy coating/ ( RANKAI China )

Transformer Accessory

Transformer Accessory
Description

1"Dia x 15'L PVC pipe

H.T tape
1-4
L.T PVC tape

Bi Metal clamp

Bolts and nuts (assorted size) with washer

Transformer Accessory

400 V Distribution Pannel with Capacitor Bank 75 Kvar


Description

1-5 Main Breaker 4 Pole 320A MCCB with indicador polit light (R,Y,B) , multifunction meter

Sub breaker 4P 320 A MCCB 1nos + 4P 100A 1nos no fuse breaker ( Mitsubishi)

Capacitor Bank 75 kvar 5 steps


Cables

TYPE Specification

1-6 15 kV 1Cx 95 mm2 AL/XLPE/ PVC Insulated cable

1-7 0.6 KV 1Cx 150 mm2 XLPE/ PVC Insulated cable

1-8 150 mm2 , Cu, cable lug

Cables

TYPE Specification

1-9 0.6 KV 1Cx 95 mm2 XLPE/ PVC Insulated cable Green-Yellow

1-10 95 mm2 , Cu, cable lug

1-11 HDBC No.2 for connection Golden Lion ( transformer connection & eart)

1-12 Cu, Earth Rod (5/8" Dia x 6.5L) Set for neutral, body and Ligtning Arrester (6 Pcs)

Earth Pownder

Cables Laying Accessories

TYPE Specification

1-13 Cable Laddar ( 300mm x 75 mm )

1-14 Metal Trunking ( 200mm x 100mm )

1-15 Trunking Support

2: SERVICES
Complete footing For Panel
Including:

2-1

1 Slab ( 10'*2,5'*1') - to support the foundation of pole and support enclosure

All fondation and slab : Cemente , sand & gravel

SERVICES
Electrical installation
Installation of transformer
Including:

2-2 Assembling of Dis-connection switch

Assembling of Lighting arrestor

400 V distribution panel with capacitor bank installation

Cables Laying and Termination


TYPE Specification

2-3 15 kV 1Cx 95 mm2 AL/XLPE/ PVC Insulated cable

2-4 0.6 KV 1Cx 150 mm2 XLPE/ PVC Insulated cable

2-5 150 mm2 , Cu, cable lug

Cables Laddar and Trunking Installation

TYPE Specification

2-6 Cable Laddar ( 300mm x 75 mm )

2-7 Metal Trunking ( 200mm x 100mm )

2-8 Trunking Support

EARTHING
Earting system installation
Including:
2-9
Earth Resistance : L.A < 7 Ohm, TF body & D.S body <3 Ohm, TF (N)<2 Ohm

Transportation
Transportation
Including:

2-10 Transportation on Site

All accessory

4: CHARGES
Other Charges

EPC Shut down Charge


3-1
Paper Work charges

3-2 Project Management Fee

GRAND TOTAL
ance Project
( SHS 00031 )

Unit Unit Price Qty Total Price

Set 200000 1 200000

Unit Unit Price Qty Total Price

Set 600000 1 600000

Unit Unit Price Qty Total Price

Set 120000 1 120000

Unit Unit Price Qty Total Price

Set 50000 1 50000

Unit Unit Price Qty Total Price

Set 2000000 1 2000000


Unit Unit Price Qty Total Price

Meter 6000 30 180000

Meter 22000 100 2200000

No 3000 50 150000

Unit Unit Price Qty Total Price

Meter 15000 50 750000

No 2000 3 6000

Meter 5000 30 150000

Set 45000 3 135000

Pkg 40000 3 120000

Unit Unit Price Qty Total Price

Nos 40000 1 40000

Nos 62000 10 620000

Set 10000 20 200000

Unit Unit Price Qty Total Price

Set 300000 1 300000

Unit Unit Price Qty Total Price

Lot 300000 1 300000

Unit Unit Price Qty Total Price


Meter 1000 30 30000

Meter 1000 100 100000

No 500 50 25000

Unit Unit Price Qty Total Price

Nos 10000 1 10000

Nos 8000 10 80000

Set 5000 20 100000

Unit Unit Price Qty Total Price

Set 120000 3 360000

Unit Unit Price Qty Total Price

Set 500000 1 500000

Unit Unit Price Qty Total Price

Lot 400,000 1 400,000

Lot 300,000 1 300,000

Lot 1,002,600 1 1,002,600

11,028,600
Core Site Power System Inspection And Maintenance Project
Maintenance Work Quotation For Keng Tung ( SHE 00001 )
EQUIPMENT
Transformer Accessory

400 V Distribution Pannel with Capacitor Bank 30 Kvar ( Outdoor )


Description

1-1 Main Breaker 4 Pole 160A MCCB with indicador polit light (R,Y,B) , multifunction meter

Sub breaker 4P 160 A MCCB 1nos + 4P 100A MCCB 1nos + 4P 63A MCCB 1nos

Capacitor Bank 30 kvar 3 steps

Cables

TYPE Specification

1-2 15 kV 1Cx 95 mm2 AL/XLPE/ PVC Insulated cable

1-3 0.6 KV 1Cx 95 mm2 Cu/ XLPE/ PVC Insulated cable

1-4 95 mm2 , Cu, cable lug

Cables

TYPE Specification

1-5 0.6 KV 1Cx 95 mm2 XLPE/ PVC Insulated cable Green-Yellow

1-6 95 mm2 , Cu, cable lug

1-7 HDBC No.2 for connection Golden Lion ( transformer connection & eart)

1-8 Cu, Earth Rod (5/8" Dia x 6.5L) Set for neutral, body and Ligtning Arrester (6 Pcs)

Earth Pownder

Cables Laying Accessories

TYPE Specification

1-9 Cable Laddar ( 300mm x 75 mm )

2: SERVICES
Electrical installation
Installation of transformer
Including:

2-1

400 V distribution panel with capacitor bank installation

Complete footing For Panel

2-2
Including:

2-2

1 Slab ( 6'*2,4'*2') - to support the foundation of pole and support enclosure

All fondation and slab : Cemente , sand & gravel

Cables Laying and Termination

TYPE Specification

2-3 15 kV 1Cx 95 mm2 AL/XLPE/ PVC Insulated cable

2-4 0.6 KV 1Cx 95 mm2 XLPE/ PVC Insulated cable

2-5 95 mm2 , Cu, cable lug

Cables Laddar and Trunking Installation

TYPE Specification

2-6 Cable Laddar ( 300mm x 75 mm )

EARTHING
Earting system installation
Including:
2-7
Earth Resistance : L.A < 7 Ohm, TF body & D.S body <3 Ohm, TF (N)<2 Ohm

Transportation
Transportation
Including:

2-8 Transportation on Site

All accessory

4: CHARGES
Other Charges

EPC Shut down Charge


3-1
Paper Work charges

3-2 Project Management Fee

GRAND TOTAL
ance Project
( SHE 00001 )

Unit Unit Price Qty Total Price

Set 1400000 1 1400000

Unit Unit Price Qty Total Price

Meter 6000 30 180000

Meter 15000 30 450000

No 2000 8 16000

Unit Unit Price Qty Total Price

Meter 15000 20 300000

No 2000 3 6000

Meter 5000 30 150000

Set 45000 3 135000

Pkg 40000 3 120000

Unit Unit Price Qty Total Price

Nos 40000 1 40000

Unit Unit Price Qty Total Price

Lot 100000 1 100000

Set 250000 1 250000


Unit Unit Price Qty Total Price

Meter 1000 30 30000

Meter 1000 30 30000

No 500 8 4000

Unit Unit Price Qty Total Price

Nos 10000 1 10000

Unit Unit Price Qty Total Price

Set 120000 3 360000

Unit Unit Price Qty Total Price

Set 600000 1 600000

Unit Unit Price Qty Total Price

Lot 400,000 1 400,000

Lot 300,000 1 300,000

Lot 488,100 1 488,100

5,369,100
Core Site Power System Inspection And Maintenance Project
Maintenance Work Quotation For Tachileik ( SHE 00014 )
EQUIPMENT
Transformer Accessory

400 V Distribution Pannel with Capacitor Bank 30 Kvar ( Outdoor )


Description

1-1 Main Breaker 4 Pole 160A MCCB with indicador polit light (R,Y,B) , multifunction meter

Sub breaker 4P 160 A MCCB 1nos + 4P 100A MCCB 1nos

Capacitor Bank 30 kvar 3 steps

Cables

TYPE Specification

1-2 0.6 KV 1Cx 95 mm2 Cu/ XLPE/ PVC Insulated cable

1-3 95 mm2 , Cu, cable lug

Cables

TYPE Specification

1-4 0.6 KV 1Cx 95 mm2 Cu / PVC Insulated cable Green-Yellow

1-5 95 mm2 , Cu, cable lug

1-6 HDBC No.2 for connection Golden Lion ( transformer connection & eart)

1-7 Cu, Earth Rod (5/8" Dia x 6.5L) Set for neutral, body and Ligtning Arrester (6 Pcs)

Earth Pownder

Cables Laying Accessories

TYPE Specification

1-8 4" dia PVC Pipe

4" dia PVC ELBOW , Metal Strip

2: SERVICES
Electrical installation
Installation of transformer
Including:

2-1

400 V distribution panel with capacitor bank installation

Cables Laying and Termination


TYPE Specification

2-2 0.6 KV 1Cx 95 mm2 XLPE/ PVC Insulated cable

2-3 95 mm2 , Cu, cable lug

Cables Laddar and Trunking Installation

TYPE Specification

2-4 4" dia PVC Pipe

4" dia PVC ELBOW , Metal Strip

EARTHING
Earting system installation
Including:
2-5
Earth Resistance : L.A < 7 Ohm, TF body & D.S body <3 Ohm, TF (N)<2 Ohm

Transportation
Transportation
Including:

2-6 Transportation on Site

All accessory

4: CHARGES
Other Charges

EPC Shut down Charge


3-1
Paper Work charges

3-2 Project Management Fee

GRAND TOTAL
ance Project
SHE 00014 )

Unit Unit Price Qty Total Price

Set 1300000 1 1300000

Unit Unit Price Qty Total Price

Meter 15000 50 750000

No 2000 8 16000

Unit Unit Price Qty Total Price

Meter 15000 20 300000

No 2000 3 6000

Meter 5000 30 150000

Set 45000 3 135000

Pkg 40000 3 120000

Unit Unit Price Qty Total Price

Lot 70000 1 70000

Unit Unit Price Qty Total Price

Lot 100000 1 100000

Unit Unit Price Qty Total Price


Meter 1000 50 50000

No 500 8 4000

Unit Unit Price Qty Total Price

Lot 30000 1 30000

Unit Unit Price Qty Total Price

Set 120000 3 360000

Unit Unit Price Qty Total Price

Set 600000 1 600000

Unit Unit Price Qty Total Price

Lot 400,000 1 400,000

Lot 300,000 1 300,000

Lot 469,100 1 469,100

5,160,100
Core Site Power System Inspection And Maintenance Project
Maintenance Work Quotation For NPT S12 ( SHE 00027 )
EQUIPMENT
Transformer Accessory

400 V Distribution Pannel with Capacitor Bank 100 Kvar ( Outdoor )


Description

1-1 Main Breaker 4 Pole 600A MCCB with indicador polit light (R,Y,B) , multifunction meter

Sub breaker 4P 400 A MCCB 1nos + 4P 320A MCCB 1nos + 4P 100A MCCB 1nos

Capacitor Bank 100 kvar 5 steps

Earthing Materials

TYPE Specification

1-2 0.6 KV 1Cx 95 mm2 XLPE/ PVC Insulated cable Green-Yellow

1-3 95 mm2 , Cu, cable lug

1-4 HDBC No.2 for connection Golden Lion ( transformer connection & eart)

1-5 Cu, Earth Rod (5/8" Dia x 6.5L) Set for neutral, body and Ligtning Arrester (6 Pcs)

Earth Pownder

2: SERVICES
Electrical installation
Installation of transformer
Including:

2-1

400 V distribution panel with capacitor bank installation

EARTHING
Earting system installation
Including:
2-2
Earth Resistance : TF (N)<2 Ohm

Transportation
Transportation
Including:

2-3 Transportation on Site


2-3

All accessory

4: CHARGES
Other Charges

EPC Shut down Charge


3-1
Paper Work charges

3-2 Project Management Fee

GRAND TOTAL
ance Project
SHE 00027 )

Unit Unit Price Qty Total Price

Set 3100000 1 3100000

Unit Unit Price Qty Total Price

Meter 15000 10 150000

No 2000 3 6000

lb 5000 10 50000

Set 45000 1 45000

Pkg 40000 1 40000

Unit Unit Price Qty Total Price

Lot 200000 1 200000

Unit Unit Price Qty Total Price

Set 120000 3 360000

Unit Unit Price Qty Total Price

Set 600000 1 600000


Unit Unit Price Qty Total Price

Lot 400,000 1 400,000

Lot 300,000 1 300,000

Lot 525,100 1 525,100

5,776,100